------[PJV'S ]----------------------------------------------------------------------------------------------------------------
[R11] 18/01/2007 Data for Code L Version (VA)
1863 - VR F/Whl Sheep Van Freight
------[128]---------------------------------------------------------------------------------------------------------------------
Output description - Accuracy of information
Search for all the vehicles in the class.
Vehicle.............SV # Date...... Loc History............SV Notes
*L 1.VA 1st / /1877 W&E Built new -
/ /1892 - Modified WP 92/6335
/ /1897 - Scrapped 97/4375a
>>>
*L 1.VA 2nd 3/ 7/1897 NWS Built new WHB
22/ 1/1932 NWS Into Workshops -
16/ 2/1932 NWS Out of Workshops (26 days)
/ 2/1932 - Modified Trans hook
/ 5/1932 - Modified AC Allce LT
*L 2.VA 1st / /1877 W&E Built new -
/ /1896 - Scrapped Dismantled 96/5735a
>>>
*L 2.VA 2nd 26/ 9/1896 NWS Built new WH 96/5618a;Iron; Rebuilt
18/12/1931 NWS Into Workshops -
11/ 1/1932 NWS Out of Workshops (25 days)
/ 1/1932 - Modified Trans hook
/ 5/1932 - Modified AC Allce LT
*L 3.VA 1st / /1877 W&E Built new -
19/ 7/1896 - Not Traced Stocktake Not in existence ...
>>>
*L 3.VA 2nd 3/ 7/1897 NWS Built new WHB
/11/1931 - Modified Trans hook
/ 5/1932 - Modified AC Allce LT
/ /1974 WOD Photograph #166.29: VO, LM
15/ 1/1981 - Off Register [CRS]
27/ 2/1981 BOW Scrapped [CRS]
*L 4.VA 1st / /1877 W&E Built new -
/ /1892 - Modified WP 92/4671
/ /1896 - Scrapped Dismantled 96/2832a
>>>
*L 4.VA 2nd 27/ 6/1896 NWS Built new WHB; Iron; Rebuilt 96/3586
6/ 1/1932 NWS Into Workshops -
13/ 1/1932 NWS Out of Workshops (8 days)
/ 1/1932 - Modified Trans hook
/ 4/1932 - Modified AC Allce LT
7/ 3/1962 BAW Scrapped -
*L 5.VA 1st / /1880 WWS Built new -
/ 6/1892 - Scrapped 92/3949
>>>
*L 5.VA 2nd 30/ 4/1896 NWS Built new WH 96/2312a; Iron
/10/1931 - Modified Trans hook
/ 5/1932 - Modified AC Allce LT
16/12/1980 NMW Off Register [CRS]
*L 6.VA 1st / /1883 WWS Built new -
19/ 7/1896 - Not Traced Stocktake Not in existence ...
>>>
.
Vehicle.............SV # Date...... Loc History............SV Notes
*L 6.VA 2nd 3/ 7/1897 NWS Built new -
21/ 4/1932 NWS Into Workshops -
5/ 5/1932 NWS Out of Workshops (15 days)
/ 5/1932 - Modified AC Allce LT
23/ 8/1983 - Off Register [CRS]
*L 7.VA 1st / /1879 WWS Built new -
/ 8/1891 NWS Scrapped 91/7062
>>>
LL 1.VA - /10/1886 WWS Built new Corr. 10293
/ /1891 - To L 7.VA 91/7749
*L 7.VA 2nd / /1904 - Scrapped 04/850a
>>>
*L 7.VA 3rd 10/ 6/1905 NWS Built new WHB, Iron
6/ 4/1932 NWS Into Workshops -
19/ 4/1932 NWS Out of Workshops (14 days)
/ 4/1932 - Modified AC Allce LT
23/ 1/1981 - Off Register [CRS]
23/ 1/1981 BLD Scrapped [CRS]
*L 8.VA 1st / /1863 WMS Built new -
/ 8/1891 NWS Scrapped 91/7062
>>>
LL 2.VA - 21/ 3/1889 WWS Built new WH 89/8595
/ /1891 - To L 8.VA 91/7749
*L 8.VA 2nd / 6/1907 - Off Register Redlined
>>>
*L 8.VA 3rd 26/ 6/1907 NWS Built new WHB, Iron
3/ 5/1932 NWS Into Workshops -
/ 7/1932 - Modified AC Allce LT
7/ 7/1932 NWS To LB 8.VA (50 days)
LB 8.VA - circa 1957 - To L 8.VA (v)
*L 8.VA 3rd 25/ 6/1981 - Off Register [CRS]
5/ 8/1981 NWS Scrapped [CRS]
*L 9.VA 1st / /1875 WWS Built new -
/ 6/1892 - Scrapped 92/3949
>>>
*L 9.VA 2nd 20/11/1896 NWS Built new WH 96/7098a; Iron
29/ 6/1931 NWS Into Workshops -
10/ 9/1931 NWS Out of Workshops (50 days)
/ 9/1931 - Modified Trans hook
/ 5/1932 - Modified AC Allce LT
17/ 1/1961 NWS Scrapped -
*L 10.VA 1st / /1863 WMS Built new -
/ 8/1892 - Scrapped 92/5705
>>>
*L 10.VA 2nd 20/11/1896 NWS Built new WH 96/7098a; Iron
/ 9/1911 - Modified Spiral Spring/couplers
/10/1931 - Modified Trans hook
/ 4/1932 - Modified AC Allce LT
8/ 7/1968 NWS Scrapped -
*L 11.VA - / /1875 WWS Built new -
/ /1899 - Not Traced Stocktake "Not traced ... 1899"
/ /1902 - Scrapped 02/5626a
.
Vehicle.............SV # Date...... Loc History............SV Notes
*L 12.VA - / /1876 WWS Built new -
/ /1896 - Not Traced Stocktake ... 1896 & 1899
*L 13.VA 1st / /1863 WMS Built new -
circa 1889 WWS Scrapped -
>>>
*L 13.VA 2nd 27/11/1896 NWS Built new WH 96/7251a, Iron
14/ 5/1932 NWS Into Workshops -
/ 7/1932 - Modified Auto cpled
21/ 7/1932 NWS Out of Workshops (50 days)
*L 14.VA 1st / /1863 WMS Built new -
/ 5/1892 - Scrapped 92/3521
>>>
*L 14.VA 2nd 27/11/1896 NWS Built new WH 96/7251a; Iron
8/ 1/1932 NWS Into Workshops -
/ 1/1932 - Modified Trans hook
29/ 1/1932 NWS Out of Workshops (22 days)
/ 4/1932 - Modified AC Allce LT
*L 15.VA - / /1881 WWS Built new -
/ 5/1892 - Scrapped 92/3521
27/11/1896 NWS Built new WH 96/7251a, Iron
9/ 2/1932 NWS Into Workshops -
1/ 3/1932 NWS Out of Workshops (22 days)
/ 3/1932 - Modified AC Allce LT
*L 16.VA - / /1879 WWS Built new -
/ 2/1892 - Scrapped 92/1450
5/12/1896 NWS Built new WH 96/7514a, Iron
/10/1931 - Modified Trans hook
/ 4/1932 - Modified AC Allce LT
18/ 1/1960 SER Scrapped (3/3/60)
*L 17.VA - / /1863 WMS Built new -
/ 5/1892 - Scrapped 92/3521
10/12/1896 NWS Built new WH 96/7668a
/ 6/1920 - Modified 4" journals; 8t - 10t
/ 7/1931 - Modified Trans hook
/ 5/1932 - Modified AC Allce LT
*L 18.VA - / /1882 WWS Built new -
/ /1894 - Modified WP 94/9072
/ /1899 - Scrapped 99/2818a
*L 19.VA 1st / /1879 WWS Built new -
/ 5/1892 - Scrapped 92/3521
>>>
*L 19.VA 2nd 10/12/1896 NWS Built new WH 96/7668a
28/ 1/1932 NWS Into Workshops -
/ 2/1932 - Modified Trans hook
26/ 2/1932 NWS Out of Workshops (30 days)
/ 5/1932 - Modified AC Allce LT
30/ 3/1962 SRD Scrapped -
.
Vehicle.............SV # Date...... Loc History............SV Notes
*L 20.VA 1st / /1884 WWS Built new Low Top
/ 9/1891 - Scrapped 91/7840
>>>
*L 20.VA 2nd 3/ 7/1897 NWS Built new WHB
29/ 4/1931 NWS Into Workshops -
15/ 7/1931 NWS Out of Workshops (50 days)
17/ 5/1932 NWS Into Workshops -
/ 6/1932 - Modified AC Allce LT
23/ 6/1932 NWS To LB 20.VA (36 days)
*L 21.VA 1st / /1863 WMS Built new -
/ 7/1892 - Scrapped 92/4953
>>>
*L 21.VA 2nd 3/ 7/1897 NWS Built new WHB
12/ 4/1932 NWS Into Workshops -
/ 4/1932 - Modified AC Allce LT
29/ 4/1932 NWS Out of Workshops (18 days)
5/ 4/1971 BAW Scrapped -
*L 22.VA 1st / /1880 WWS Built new -
/ 5/1892 - Scrapped 92/3521
>>>
*L 22.VA 2nd 10/ 7/1897 NWS Built new WHB
5/ 9/1916 - Modified 4" journals
/10/1931 - Modified Trans hook
/ 4/1932 - Modified AC Allce LT
15/ 1/1981 - Off Register [CRS]
11/ 2/1981 BOW Scrapped [CRS]
*L 23.VA 1st / /1873 WWS Built new -
/ /1894 - Modified Low top(s) 94/7980
circa 1894 - Modified WH pipe
/ /1896 - Scrapped Dismantled 96/7642a
>>>
*L 23.VA 2nd 14/11/1896 NWS Built new WH 96/6808a, Rebuilt in lieu
29/ 3/1932 NWS Into Workshops -
15/ 4/1932 NWS Out of Workshops (18 days)
/ 4/1932 - Modified AC Allce LT
17/ 1/1961 NWS Scrapped -
*L 24.VA 1st / /1863 WMS Built new -
/ 5/1890 - Scrapped 90/4420
>>>
*L 24.VA 2nd 10/ 7/1897 NWS Built new WHB
14/ 5/1932 NWS Into Workshops -
15/ 7/1932 NWS Out of Workshops (50 days)
/ 7/1932 - Modified Auto cpled
*L 25.VA 1st / /1863 WMS Built new -
/ 6/1892 - Scrapped 92/3949
>>>
*L 25.VA 2nd 10/ 7/1897 NWS Built new WHB
4/ 5/1931 NWS Into Workshops -
29/ 6/1931 NWS Out of Workshops (50 days)
/10/1931 - Modified Trans hook
/ 5/1932 - Modified AC Allce LT
17/ 1/1961 NWS Scrapped -
.
Vehicle.............SV # Date...... Loc History............SV Notes
*L 26.VA 1st / /1863 WMS Built new -
/ 5/1892 - Scrapped 92/3521
>>>
*L 26.VA 2nd 17/ 7/1897 NWS Built new WHB
/ 6/1911 - Modified Spiral Spring/Coupler
10/ 4/1931 NWS Into Workshops -
3/ 6/1931 NWS Out of Workshops (50 days)
10/ 5/1932 NWS Into Workshops -
/ 6/1932 - Modified AC Allce LT
23/ 6/1932 NWS To LB 26.VA (45 days)
LB 26.VA - circa 1958 - To L 26.VA (v)
*L 26.VA 2nd 23/ 2/1962 SER Condemned -
30/ 3/1962 - Scrapped -
*L 27.VA 1st / /1879 WWS Built new -
/ /1896 - Scrapped Dismantled 96/2802a
>>>
*L 27.VA 2nd 30/ 6/1896 NWS Built new Rebuilt 96/3086a
/ 6/1918 - Modified 4" journals
16/ 2/1932 NWS Into Workshops -
22/ 3/1932 NWS Out of Workshops (36 days)
14/ 5/1932 NWS Into Workshops -
/ 6/1932 - Modified AC Allce LT
23/ 6/1932 NWS To LB 27.VA (41 days)
LB 27.VA - 28/ 4/1955 NWS Scrapped RS55/4711
*L 28.VA - / /1878 WWS Built new -
/ /1894 - Modified WP 94/9073
/ /1899 - Scrapped 99/2818a
*L 29.VA 1st / /1875 WWS Built new -
27/ 2/1888 WWS Scrapped Corr 2011/88
>>>
*L 29.VA 2nd 24/ 7/1897 NWS Built new WHB
/ 3/1932 - Modified AC Allce LT
*L 30.VA 1st / /1884 WWS Built new -
/ 6/1892 - Scrapped 92/3949
>>>
*L 30.VA 2nd 24/ 7/1897 NWS Built new WHB
/ 6/1917 - Modified 4 1/2" journals
/11/1931 - Modified Trans hook
/ 5/1932 - Modified AC Allce LT
23/ 2/1962 SER Condemned -
30/ 3/1962 - Scrapped -
*L 31.VA 1st / /1879 WWS Built new -
/ 9/1891 - Scrapped 91/7840
>>>
*L 31.VA 2nd 31/ 7/1897 NWS Built new WHB
26/ 4/1932 NWS Into Workshops -
/ 7/1932 - Modified Auto cpled
20/ 7/1932 NWS Out of Workshops (50 days)
6/ 3/1936 NWS Into Workshops -
31/ 7/1936 NWS Out of Workshops (50 days)
circa 1972 - Condemned -
.
Vehicle.............SV # Date...... Loc History............SV Notes
*L 32.VA 1st / /1863 WWS Built new -
/ 6/1892 - Scrapped 92/3949
>>>
*L 32.VA 2nd 31/ 7/1897 NWS Built new WHB
23/ 2/1932 NWS Into Workshops -
11/ 3/1932 NWS Out of Workshops (18 days)
/ 3/1932 - Modified AC Allce LT
/ /1974 - Scrapped RSN11/74
*L 33.VA 1st / /1874 WWS Built new -
/ 5/1890 - Scrapped 90/4420
>>>
*L 33.VA 2nd 31/ 7/1897 NWS Built new WHB
21/ 4/1932 NWS Into Workshops -
/ 5/1932 - Modified AC Allce LT
26/ 5/1932 NWS Out of Workshops (36 days)
*L 34.VA 1st / /1874 WWS Built new "Low Top"
/ 2/1892 - Scrapped 92/1450
>>>
*L 34.VA 2nd 31/ 7/1897 NWS Built new WHB
14/ 5/1932 NWS Into Workshops -
/ 6/1932 - Modified AC Allce LT
23/ 6/1932 NWS To LB 34.VA (41 days)
*L 35.VA 1st / /1863 WMS Built new -
/ 6/1892 - Scrapped 92/3949
>>>
*L 35.VA 2nd 31/ 7/1897 NWS Built new WHB
19/ 3/1932 NWS Into Workshops -
15/ 4/1932 NWS Out of Workshops (28 days)
/ 4/1932 - Modified AC Allce LT
*L 36.VA 1st / /1863 WMS Built new -
/ 2/1892 - Scrapped 92/1450
>>>
*L 36.VA 2nd 7/ 8/1897 NWS Built new WHB
11/ 3/1932 NWS Into Workshops -
/ 3/1932 - Modified AC Allce LT
2/ 4/1932 NWS Out of Workshops (23 days)
7/ 3/1962 BAW Scrapped -
23/ 5/1963 BOW On Register [NIO]: ".. ex Off Register ..."
1/12/1969 SRD Scrapped [NIO]
*L 37.VA 1st / /1875 WWS Built new -
/ /1896 - Scrapped Dismantled 96/2832a
>>>
*L 37.VA 2nd 8/ 7/1896 NWS Built new WHB, Iron, Rebuilt 96/3708a
/10/1931 - Modified Trans hook
/ 4/1932 - Modified AC Allce LT
*L 38.VA 1st / /1863 WMS Built new -
/ 2/1892 - Scrapped 92/1450
>>>
.
Vehicle.............SV # Date...... Loc History............SV Notes
*L 38.VA 2nd 7/ 8/1897 NWS Built new -
/ 8/1911 - Modified Spiral Spring/Coupler
8/ 1/1932 NWS Into Workshops -
19/ 1/1932 NWS Out of Workshops (12 days)
/ 1/1932 - Modified Trans hook
/ 5/1932 - Modified AC Allce LT
10/ 6/1971 SRD Scrapped -
*L 39.VA 1st / /1863 WMS Built new -
circa 1889 WWS Scrapped -
>>>
*L 39.VA 2nd 7/ 8/1897 NWS Built new WHB
/ 9/1911 - Modified Spiral Spring/coupler
12/ 4/1932 NWS Into Workshops -
/ 4/1932 - Modified AC Allce LT
29/ 4/1932 NWS Out of Workshops (18 days)
7/ 3/1962 BAW Scrapped [NIO]
16/ 7/1963 - On Register [NIO]: ".. ex Off Register ( not cut up ) ..."
*L 40.VA 1st / /1878 WWS Built new -
/ 7/1891 - Scrapped 91/2156
>>>
*L 40.VA 2nd 7/ 8/1897 NWS Built new WHB
/11/1931 - Modified Trans hook
/ 5/1932 - Modified AC Allce LT
*L 41.VA 1st / /1863 WMS Built new -
/ 9/1890 NWS Scrapped 90/9255
>>>
*L 41.VA 2nd 7/ 8/1897 NWS Built new WHB
/10/1911 - Modified Spiral springs/couplers
/10/1931 - Modified Trans hook
/ 5/1932 - Modified AC Allce LT
*L 42.VA 1st / /1880 WWS Built new -
/ 6/1891 NWS Scrapped 91/5642
>>>
*L 42.VA 2nd 14/ 8/1897 NWS Built new WHB
8/ 1/1932 NWS Into Workshops -
/ 1/1932 - Modified Trans hook
20/ 1/1932 NWS Out of Workshops (13 days)
/ 5/1932 - Modified AC Allce LT
17/ 1/1961 NWS Scrapped -
*L 43.VA 1st / /1874 WWS Built new -
/ 8/1891 NWS Scrapped 91/7062
>>>
*L 43.VA 2nd 14/ 8/1897 NWS Built new WHB
/ 9/1931 - Modified Trans hook
/ 4/1932 - Modified AC Allce LT
25/ 5/1967 SRD Scrapped [NIO]
*L 44.VA - / /1883 WWS Built new -
/ /1894 - Modified Low top 94/9072
circa 1894 - Modified WH Pipe
/ /1899 - Scrapped 99/2818a
.
Vehicle.............SV # Date...... Loc History............SV Notes
*L 45.VA - / /1884 WWS Built new -
/ /1894 - Modified WP 94/311-312
/ /1899 - Scrapped 99/2818a
*L 46.VA 1st / /1875 WWS Built new -
circa 1889 WWS Scrapped -
>>>
*L 46.VA 2nd 14/ 8/1897 NWS Built new WHB
8/ 1/1932 NWS Into Workshops -
/ 1/1932 - Modified Trans hook
21/ 1/1932 NWS Out of Workshops (14 days)
/ 5/1932 - Modified AC Allce LT
10/ 6/1971 SRD Scrapped -
*L 47.VA 1st / /1874 WWS Built new -
/ 6/1892 - Scrapped 92/3949
>>>
*L 47.VA 2nd 14/ 8/1897 NWS Built new WHB
16/ 5/1932 NWS Into Workshops -
31/ 5/1932 NWS Out of Workshops (16 days)
/ 6/1932 - Modified AC Allce LT
*L 48.VA 1st / /1863 WWS Built new -
/ 7/1891 - Scrapped 91/6206
>>>
*L 48.VA 2nd 21/ 8/1897 NWS Built new WHB
/11/1931 - Modified Trans hook
/ 5/1932 - Modified AC Allce LT
23/ 2/1962 - Condemned -
7/ 3/1962 BAW Scrapped [NIO]
*L 49.VA 1st / /1882 WWS Built new -
/ 5/1892 - Scrapped 92/3521
>>>
*L 49.VA 2nd 21/ 8/1897 NWS Built new WHB
6/ 4/1932 NWS Into Workshops -
15/ 4/1932 NWS Out of Workshops (10 days)
/ 4/1932 - Modified AC Allce LT
*L 50.VA 1st / /1880 WWS Built new -
circa 1894 - Modified "Low top"
/ /1896 - Scrapped Dismantled 96/2832a
>>>
*L 50.VA 2nd 10/ 7/1896 NWS Built new WHB,Iron, Rebuilt
/10/1931 - Modified Trans hook
/ 5/1932 - Modified AC Allce LT
23/ 2/1962 - Condemned -
7/ 3/1962 BAW Scrapped [NIO]
*L 51.VA 1st / /1881 WWS Built new -
15/ 7/1887 SBY Destroyed 'Smashed to pieces'
>>>
*L 51.VA 2nd /11/1887 WWS Built new -
/ /1894 - Modified WP 94/7980
/ /1895 - Modified WH 95/1944a
/ /1904 - Scrapped 04/850a
>>>
.
Vehicle.............SV # Date...... Loc History............SV Notes
*L 51.VA 3rd 10/ 6/1905 NWS Built new WHB, Iron
/10/1925 - Modified 4 1/2" journals
12/ 4/1932 NWS Into Workshops -
/ 4/1932 - Modified AC Allce LT
28/ 4/1932 NWS Out of Workshops (17 days)
15/ 1/1981 - Off Register [CRS]
10/ 2/1981 BOW Scrapped [CRS]
*L 52.VA 1st / /1863 WMS Built new -
/ /1894 - Modified WP 94/9012
/ /1896 - Scrapped Dismantled 96/2832a
>>>
*L 52.VA 2nd 17/ 7/1896 NWS Built new WHB, Rebuilt .. 96/3928a
/10/1931 - Modified Trans hook
/ 4/1932 - Modified AC Allce LT
17/ 1/1961 - Scrapped [NIO]
*L 53.VA 1st / /1879 WWS Built new -
/ 2/1892 - Scrapped 92/1450
>>>
*L 53.VA 2nd 21/ 8/1897 NWS Built new WHB
/11/1911 - Modified Spiral spring/couplers
17/ 7/1931 NWS Into Workshops -
10/ 9/1931 NWS Out of Workshops (50 days)
/ 9/1931 - Modified Trans hook
/ 5/1932 - Modified AC Allce LT
*L 54.VA 1st / /1874 WMS Built new -
/ 8/1891 NWS Scrapped 91/7062
circa 1894 - Modified Low tops
>>>
*L 54.VA 2nd 21/ 8/1897 NWS Built new WHB
18/ 1/1932 NWS Into Workshops -
/ 1/1932 - Modified Trans hook
30/ 1/1932 NWS Out of Workshops (13 days)
/ 5/1932 - Modified AC Allce LT
23/ 2/1962 - Condemned -
7/ 3/1962 BAW Scrapped [NIO]
25/ 5/1964 - On Register [NIO]: ".. ex Off Register ..."
7/ 2/1984 - Off Register [CRS]
*L 55.VA - / /1880 WWS Built new -
/ /1894 - Modified WP 94/9012a
/ /1899 - Scrapped 99/2818a
*L 56.VA 1st / /1874 WMS Built new -
19/ 7/1896 - Not Traced Stocktake Not in existence ..
>>>
*L 56.VA 2nd 28/ 8/1897 NWS Built new WHB
/10/1931 - Modified Trans hook
/ 5/1932 - Modified AC Allce LT
*L 57.VA - / /1883 WWS Built new -
/ /1896 - Not Traced Stocktake ... 1896 or 1899
*L 58.VA 1st / /1874 WMS Built new -
circa 1890 - Modified Low top
/ 6/1891 NWS Scrapped 91/5642
>>>
.
Vehicle.............SV # Date...... Loc History............SV Notes
*L 58.VA 2nd 28/ 8/1897 NWS Built new WHB
15/ 1/1932 NWS Into Workshops -
/ 1/1932 - Modified Trans hook
29/ 1/1932 NWS Out of Workshops (15 days)
/ 4/1932 - Modified AC Allce LT
17/ 1/1961 NWS Scrapped -
*L 59.VA 1st / /1874 WMS Built new -
/ 8/1891 NWS Scrapped 91/7062
>>>
*L 59.VA 2nd 28/ 8/1897 NWS Built new WHB
29/ 6/1931 NWS Into Workshops -
4/ 9/1931 NWS Out of Workshops (50 days)
/ 9/1931 - Modified Trans hook
/ 5/1932 - Modified AC Allce LT
22/ 3/1966 - Scrapped [NIO]
*L 60.VA 1st / /1880 WWS Built new -
/ 9/1891 - Scrapped 91/7840
>>>
*L 60.VA 2nd 28/ 8/1897 NWS Built new WHB
8/ 1/1932 NWS Into Workshops -
/ 1/1932 - Modified Trans hook
30/ 1/1932 NWS Out of Workshops (23 days)
/ 5/1932 - Modified AC Allce LT
*L 61.VA 1st / /1874 WMS Built new -
/ /1896 - Scrapped Dismantled 96/2832a
>>>
*L 61.VA 2nd 30/ 7/1896 NWS Built new WHB, Iron; Rebuilt .. L61
/ 8/1911 - Modified Cplr/Spiral Springs
/10/1931 - Modified Trans hook
/ 5/1932 - Modified AC Allce LT
27/ 5/1971 SRD Scrapped -
*L 62.VA 1st / /1874 WMS Built new -
/ 2/1892 - Scrapped 92/1450
>>>
*L 62.VA 2nd 4/ 9/1897 NWS Built new WHB
/ 8/1916 - Modified Journals altered
16/ 2/1932 NWS Into Workshops -
3/ 3/1932 NWS Out of Workshops (17 days)
/ 3/1932 - Modified Auto cpled
30/ 4/1935 NWS Into Workshops -
20/ 9/1935 NWS Out of Workshops (50 days)
8/ 2/1968 - Scrapped [NIO]
*L 63.VA 1st / /1880 WWS Built new -
/ /1896 - Scrapped Dismantled 96/2832a
>>>
*L 63.VA 2nd 30/ 7/1896 NWS Built new WHB, Iron; Rebuilt ... L63
3/ 5/1932 NWS Into Workshops -
19/ 5/1932 NWS Out of Workshops (17 days)
/ 5/1932 - Modified AC Allce LT
*L 64.VA 1st / /1880 WWS Built new -
/ 2/1891 - Modified 3 1/2" journals
/ /1891 NWS Scrapped 91/1709
>>>
.
Vehicle.............SV # Date...... Loc History............SV Notes
*L 64.VA 2nd 4/ 9/1897 NWS Built new WHB
/10/1911 - Modified Cplr/spiral springs
15/ 3/1932 NWS Into Workshops -
/ 3/1932 - Modified AC Allce LT
5/ 4/1932 NWS Out of Workshops (22 days)
*L 65.VA 1st / /1874 WMS Built new -
19/ 7/1896 - Not Traced Stocktake Not in existence ...
>>>
*L 65.VA 2nd 4/ 9/1897 NWS Built new WHB
19/ 3/1932 NWS Into Workshops -
15/ 4/1932 NWS Out of Workshops (28 days)
/ 4/1932 - Modified AC Allce LT
8/ 6/1970 - Scrapped -
*L 66.VA 1st / /1880 WWS Built new -
/ 6/1892 - Scrapped 92/3949
>>>
*L 66.VA 2nd 4/ 9/1897 NWS Built new WHB
/11/1931 - Modified Trans hook
/ 5/1932 - Modified AC Allce LT
*L 67.VA 1st / /1881 WWS Built new -
/ 9/1891 - Scrapped 91/7840
>>>
*L 67.VA 2nd 11/ 9/1897 NWS Built new WHB
21/10/1930 NWS Into Workshops -
18/12/1930 NWS Out of Workshops (59 days)
16/ 1/1932 NWS Into Workshops -
/ 1/1932 - Modified Trans hook
9/ 2/1932 NWS Out of Workshops (25 days)
/ 4/1932 - Modified AC Allce LT
14/ 5/1969 SRD Scrapped [NIO]
*L 68.VA 1st / /1879 WWS Built new -
/ 2/1892 - Scrapped 92/1450
>>>
*L 68.VA 2nd 11/ 9/1897 NWS Built new WHB
/ 8/1911 - Modified Cplr/Spiral springs
11/ 3/1932 NWS Into Workshops -
/ 3/1932 - Modified AC Allce LT
2/ 4/1932 NWS Out of Workshops (23 days)
*L 69.VA 1st / /1874 WMS Built new -
/ /1896 - Scrapped Dismantled 96/2832a
>>>
*L 69.VA 2nd 1/ 8/1896 NWS Built new Iron, Rebuilt ... 69L
9/12/1931 NWS Into Workshops -
21/12/1931 NWS Out of Workshops (13 days)
/ 5/1932 - Modified Auto cpled
11/11/1966 SER Scrapped RS64/1469
*L 70.VA 1st / /1874 WMS Built new -
/ 2/1892 - Scrapped 92/1450
>>>
.
Vehicle.............SV # Date...... Loc History............SV Notes
*L 70.VA 2nd 11/ 9/1897 NWS Built new WHB
23/ 2/1932 NWS Into Workshops -
11/ 3/1932 NWS Out of Workshops (18 days)
/ 3/1932 - Modified AC Allce LT
*L 71.VA - / /1874 WMS Built new -
/ 8/1891 NWS Scrapped 91/7062
11/ 9/1897 NWS Built new WHB
15/ 3/1932 NWS Into Workshops -
/ 3/1932 - Modified AC Allce LT
5/ 4/1932 NWS Out of Workshops (22 days)
*L 72.VA - / /1874 WMS Built new -
/ 2/1891 NWS Scrapped 91/1209
11/ 9/1897 NWS Built new WHB
/ 1/1932 - Modified Trans hook
/ 4/1932 - Modified AC Allce LT
*L 73.VA 1st / /1880 WWS Built new -
/ 9/1891 - Scrapped 91/7840
>>>
*L 73.VA 2nd 11/ 9/1897 NWS Built new WHB
/10/1931 - Modified Trans hook
/ 5/1932 - Modified AC Allce LT
8/12/1969 SRD Scrapped -
*L 74.VA 1st / /1874 WMS Built new -
/ 2/1891 NWS Scrapped 91/1209
>>>
*L 74.VA 2nd 18/ 9/1897 NWS Built new WHB
8/ 1/1932 NWS Into Workshops -
3/ 2/1932 NWS Out of Workshops (27 days)
/ 2/1932 - Modified Trans hook
/ 5/1932 - Modified AC Allce LT
21/ 7/1969 SRD Scrapped -
*L 75.VA 1st / /1884 WWS Built new Low Top
/ /1894 - Modified WP 94/7377
26/ 1/1907 - Off Register redlined 07/859a
>>>
*L 75.VA 2nd 26/ 1/1907 NWS Built new WHB, Iron
27/ 2/1932 NWS Into Workshops -
11/ 3/1932 NWS Out of Workshops (14 days)
/ 3/1932 - Modified AC Allce LT
*L 76.VA - / /1871 W&E Built new -
/ /1892 - Modified WP 92/5815
/ /1901 - Modified WH 01/7562a
/10/1901 - Modified "Shortened"
29/11/1913 NWS Built new WHB, Iron
29/11/1913 - Off Register redlined
20/ 4/1931 NWS Into Workshops -
4/ 6/1931 NWS Out of Workshops (46 days)
5/ 3/1932 NWS Into Workshops -
18/ 3/1932 NWS Out of Workshops (14 days)
/ 3/1932 - Modified AC Allce LT
.
Vehicle.............SV # Date...... Loc History............SV Notes
*L 77.VA - / /1871 W&E Built new -
/ /1892 - Modified WP 92/5815
/ /1901 - Modified WH 01/7562a
/10/1901 - Modified "Shortened"
26/ 6/1916 NWS Built new WHB, Iron
26/ 6/1916 - Off Register redlined
24/ 2/1931 NWS Into Workshops -
30/ 4/1931 NWS Out of Workshops (50 days)
3/ 5/1932 NWS Into Workshops -
17/ 5/1932 NWS Out of Workshops (15 days)
/ 5/1932 - Modified AC Allce LT
10/ 3/1960 NWS Scrapped -
*L 78.VA - / /1871 W&E Built new -
/ /1895 - Modified WP 95/6324a
/12/1906 - Modified WHB
/12/1911 - Modified "Shortened"
26/ 6/1916 NWS Built new WHB, Iron
26/ 6/1916 - Off Register redlined
/ 7/1932 - Modified AC Allce LT
*L 79.VA - / /1871 W&E Built new -
/ /1892 - Modified WP 92/5815
/ /1901 - Modified WH 01/3424a
/10/1911 - Modified "Wheelbase not --------"
29/11/1913 NWS Built new WHB, iron
29/11/1913 - Off Register redlined
22/ 1/1932 NWS Into Workshops -
6/ 2/1932 NWS Out of Workshops (16 days)
/ 2/1932 - Modified AC Allce LT
/ /1969 - Scrapped -
*L 80.VA - / /1871 W&E Built new -
/ /1892 - Modified WP 92/5815
/ /1904 - Scrapped L04/850a
17/ 6/1905 NWS Built new WHB, Iron ("Frame only")
8/12/1930 NWS Into Workshops -
20/ 6/1931 NWS Out of Workshops (50 days)
21/ 4/1932 NWS Into Workshops -
14/ 5/1932 NWS Out of Workshops (24 days)
/ 5/1932 - Modified AC Allce LT
*L 81.VA - / /1871 W&E Built new -
/ /1894 - Modified WP 94/7980
/ /1904 - Modified WH 04/4794a
/ /1904 - Modified "Wheelbase shortened .."
17/ 7/1911 NWS Built new WHB, Iron
/ 7/1911 - Off Register redlined
9/ 1/1932 NWS Into Workshops -
11/ 2/1932 NWS Out of Workshops (34 days)
/ 2/1932 - Modified AC Allce LT
/ /1971 - Scrapped R104
.
Vehicle.............SV # Date...... Loc History............SV Notes
*L 82.VA - / /1871 W&E Built new -
/ /1897 - Modified WP 97/6021a
/ 5/1905 - Modified Wheelbase shortened ...
/ /1905 - Modified WH 05/5905
26/ 6/1916 NWS Built new WHB, Iron
26/ 6/1916 - Off Register redlined
15/12/1931 NWS Into Workshops -
19/ 1/1932 NWS Out of Workshops (36 days)
/ 1/1932 - Modified Trans hook
/ 5/1932 - Modified AC Allce LT
3/ 3/1960 SER Scrapped -
*L 83.VA - / /1871 W&E Built new -
/ /1892 - Modified WP 92/5815
/ /1903 - Modified WH 03/1849a
29/ 6/1912 NWS Built new WHB, Iron
29/ 6/1912 - Off Register redlined
15/ 1/1932 NWS Into Workshops -
12/ 2/1932 NWS Out of Workshops (29 days)
/ 2/1932 - Modified Trans hook
/ 5/1932 - Modified AC Allce LT
*L 84.VA - / /1871 W&E Built new -
/ /1895 - Modified WP 95/71a
/ /1902 - Modified WH 02/1337a
29/ 6/1912 NWS Built new WHB, Iron
29/ 6/1912 - Off Register redlined
17/ 5/1932 NWS Into Workshops -
30/ 5/1932 NWS Out of Workshops (14 days)
/ 6/1932 - Modified AC Allce LT
*L 85.VA - / /1871 W&E Built new -
/ /1894 - Modified WP 94/5500
/ /1901 - Modified WH 01/7562a
26/ 6/1916 NWS Built new WHB, Iron
26/ 6/1916 - Off Register redlined
3/ 5/1932 NWS Into Workshops -
11/ 7/1932 NWS Out of Workshops (50 days)
/ 7/1932 - Modified Auto cpled (R1: No ref)
3/ 3/1960 SER Scrapped -
*L 86.VA - / /1871 W&E Built new -
/ /1896 - Modified WP 96/6450a
/ /1901 - Modified WH 01/7562a
29/ 6/1912 NWS Built new WHB, Iron
29/ 6/1912 - Off Register redlined
12/ 4/1932 NWS Into Workshops -
/ 4/1932 - Modified AC Allce LT
28/ 4/1932 NWS Out of Workshops (17 days)
13/ 3/1937 NWS Into Workshops -
22/ 6/1937 NWS Out of Workshops (50 days)
16/ 6/1970 SRD Scrapped -
.
Vehicle.............SV # Date...... Loc History............SV Notes
*L 87.VA - / /1871 W&E Built new -
/ /1896 - Modified WP 96/4353a
29/11/1913 NWS Built new WHB, Iron
29/11/1913 - Off Register redlined
/11/1931 - Modified Trans hook
/ 4/1932 - Modified AC Allce LT
*L 88.VA - / /1871 W&E Built new -
/ 4/1908 - Modified Wheelbase altered ...
/ 4/1908 - Modified Continuous cplrs
/ 4/1908 - Modified WHB
/ 8/1911 - Off Register redlined
31/ 8/1911 NWS Built new WHB, Iron
14/ 1/1932 NWS Into Workshops -
/ 1/1932 - Modified Trans hook
27/ 1/1932 NWS Out of Workshops (14 days)
/ 5/1932 - Modified AC Allce LT
*L 89.VA - / /1871 W&E Built new -
/ /1894 - Modified WP 94/7377
/ 1/1910 - Modified WHB
/ 2/1910 - Modified Wheelbase altered
29/11/1913 NWS Built new WHB, Iron
29/11/1913 - Off Register redlined
15/ 3/1932 NWS Into Workshops -
31/ 3/1932 NWS Out of Workshops (17 days)
/ 4/1932 - Modified AC Allce LT
3/12/1935 NWS Into Workshops -
18/ 2/1936 NWS Out of Workshops (50 days)
/ /1971 - Scrapped R104
*L 90.VA - / /1871 W&E Built new -
/ /1896 - Modified WP 96/1270a
/ /1902 - Modified WH 02/1337a
30/ 6/1916 NWS Built new WHB, Iron
30/ 6/1916 - Off Register redlined
8/ 4/1932 NWS Into Workshops -
/ 4/1932 - Modified AC Allce LT
22/ 4/1932 NWS Out of Workshops (15 days)
17/ 2/1933 NWS Into Workshops -
1/11/1933 NWS Out of Workshops (50 days)
7/ 3/1980 SRD Scrapped [CRS]
*L 91.VA - / /1871 W&E Built new -
/ /1894 - Modified WP 94/7377
/ /1902 - Modified WH 02/6497a
10/ 9/1923 - Scrapped -
.
Vehicle.............SV # Date...... Loc History............SV Notes
*L 92.VA - / /1871 W&E Built new -
/ /1895 - Modified WP 95/3825a
/ /1902 - Modified WH 02/128a
30/ 6/1916 NWS Built new WHB, Iron
30/ 6/1916 - Off Register redlined
/11/1931 - Modified Trans hook
8/ 1/1932 NWS Into Workshops -
18/ 1/1932 NWS Out of Workshops (11 days)
/ 5/1932 - Modified AC Allce LT
21/ 4/1936 NWS Into Workshops -
28/ 7/1936 NWS Out of Workshops (50 days)
/ /1971 - Scrapped NR0371
*L 93.VA - / /1871 W&E Built new -
/ /1893 - Modified WP 93/679
/ /1902 - Modified WH 02/128a
29/11/1913 NWS Built new WHB, Iron
29/11/1913 - Off Register redlined
29/ 3/1932 NWS Into Workshops -
15/ 4/1932 NWS Out of Workshops (18 days)
/ 4/1932 - Modified AC Allce LT
2/ 7/1935 NWS Into Workshops -
20/ 9/1935 NWS Out of Workshops (50 days)
*L 94.VA - / /1871 W&E Built new -
/ /1892 - Modified WP 92/5815
/ /1902 - Modified WH 02/1337a
circa 1913 - Off Register redlined
29/11/1913 NWS Built new WHB, Iron
5/ 3/1932 NWS Into Workshops -
18/ 3/1932 NWS Out of Workshops (14 days)
/ 3/1932 - Modified AC Allce LT
19/ 9/1934 NWS Into Workshops -
26/ 9/1935 NWS Out of Workshops ( 8 days)
*L 95.VA - / /1871 W&E Built new -
/ /1893 - Modified WP 93/8258
/ 7/1906 - Modified WHB
29/ 6/1912 NWS Built new WHB, Iron
29/ 6/1912 - Off Register redlined
6/ 2/1931 NWS Into Workshops -
29/ 5/1931 NWS Out of Workshops (50 days)
12/ 4/1932 NWS Into Workshops -
/ 4/1932 - Modified AC Allce LT
27/ 4/1932 NWS Out of Workshops (16 days)
*L 96.VA - / /1871 W&E Built new -
/ /1896 - Modified WP 96/1270
/ /1902 - Modified WH 02/6497a
30/ 6/1916 NWS Built new WHB, Iron
30/ 6/1916 - Off Register redlined
5/ 3/1932 NWS Into Workshops -
/ 3/1932 - Modified AC Allce LT
21/ 3/1932 NWS Out of Workshops (17 days)
3/ 3/1960 SER Scrapped -
.
Vehicle.............SV # Date...... Loc History............SV Notes
*L 97.VA - / /1871 W&E Built new -
/ /1894 - Modified WP 94/7980
/ 1/1907 - Modified WHB; Wheelbase altered
/ 8/1911 - Off Register redlined
30/ 8/1911 NWS Built new WHB, Iron
8/ 3/1932 NWS Into Workshops -
/ 3/1932 - Modified AC Allce LT
22/ 3/1932 NWS Out of Workshops (15 days)
*L 98.VA - / /1871 W&E Built new -
/ /1892 - Modified WP 92/5815
/12/1906 - Modified WHB
29/ 6/1912 NWS Built new WHB, Iron
29/ 6/1912 - Off Register redlined
/11/1931 - Modified Trans hook
/ 4/1932 - Modified AC Allce LT
*L 99.VA - / /1871 W&E Built new -
/ /1893 - Modified WP 93/8258
/ /1901 - Modified WH 01/7562a
30/ 6/1916 NWS Built new WHB, Iron
30/ 6/1916 - Off Register redlined
/10/1931 - Modified Trans hook
/ 5/1932 - Modified AC Allce LT
17/ 1/1961 NWS Scrapped -
*L 100.VA 1st / /1871 W&E Built new -
/ /1892 - Modified WP 92/4671
/ /1902 - Modified WH 02/1337a
29/ 6/1912 - Off Register redlined
>>>
*L 100.VA 2nd 29/ 6/1912 NWS Built new WHB, Iron
27/ 5/1931 NWS Into Workshops -
12/ 8/1931 NWS Out of Workshops (50 days)
30/ 1/1932 NWS Into Workshops -
/ 2/1932 - Modified AC Allce LT
22/ 2/1932 NWS Out of Workshops (24 days)
*L 101.VA - / /1871 WWS Built new -
/ /1893 - Modified WP 93/5587
circa 1905 - Off Register To be rebuilt 04/1599a
10/ 6/1905 NWS Built new WHB, Iron
14/ 5/1932 NWS Into Workshops -
31/ 5/1932 NWS Out of Workshops (18 days)
/ 6/1932 - Modified AC Allce LT
/ /1971 - Scrapped NR0371
.
Vehicle.............SV # Date...... Loc History............SV Notes
*L 102.VA - / /1881 WWS Built new -
/ /1892 - Modified WP 92/6585
/ /1896 - Scrapped Dismantled 96/5735a
26/ 9/1896 NWS Built new WH 96/5618a, replace 102L
8/ 1/1932 NWS Into Workshops -
/ 1/1932 - Modified Trans hook
21/ 1/1932 NWS Out of Workshops (14 days)
/ 5/1932 - Modified AC Allce LT
4/ 8/1936 NWS Into Workshops -
15/ 9/1936 NWS Out of Workshops (43 days)
/ /1969 - Scrapped -
*L 103.VA - / /1882 WWS Built new -
/ /1892 - Modified WP 92/6585
/ /1899 - Scrapped 99/2601a
*L 104.VA - / /1882 WWS Built new -
/ /1892 - Modified WP 92/6585
/ /1899 - Scrapped 99/2601a
*L 105.VA - / /1883 WWS Built new -
/ /1894 - Modified WP 94/7377
/ /1896 - Scrapped Dismantled 96/5735a
26/ 9/1896 NWS Built new WH 96/5618a
16/ 2/1932 NWS Into Workshops -
/ 3/1932 - Modified AC Allce LT
22/ 3/1932 NWS Out of Workshops (36 days)
*L 106.VA - / /1881 WWS Built new -
circa 1897 - Modified WHB
/11/1909 - Off Register redlined
11/11/1909 NWS Built new WHB, Iron
14/ 5/1932 NWS Into Workshops -
/ 6/1932 - Modified AC Allce LT
23/ 6/1932 NWS To LB 106.VA (41 days)
LB 106.VA - 11/ 9/1954 NMW To L 106.VA (W/E)
*L 106.VA - / /1969 - Scrapped -
*L 107.VA - / /1875 W&H Built new -
/ /1892 - Modified WP 92/6585
/ /1896 - Scrapped Dismantled 96/2832a
7/ 8/1896 NWS Built new WH 96/4438a, replace 107L
19/ 4/1932 NWS Into Workshops -
4/ 5/1932 NWS Out of Workshops (16 days)
/ 5/1932 - Modified AC Allce LT
*L 108.VA - / /1880 WWS Built new -
/ /1893 - Modified WP 93/4656
/ /1896 - Scrapped Dismantled 96/5954a
30/ 9/1896 NWS Built new WH 96/5708a, replace 108L
23/ 2/1932 NWS Into Workshops -
9/ 3/1932 NWS Out of Workshops (16 days)
/ 3/1932 - Modified AC Allce LT
*L 109.VA - / /1881 WWS Built new -
/ /1892 - Modified WP 92/6585
/ /1903 - Scrapped 03/28a; "Frame only"
.
Vehicle.............SV # Date...... Loc History............SV Notes
*L 110.VA - / /1880 WWS Built new -
/ /1896 - Modified WP 96/3706a
/ /1899 - Scrapped 99/2601a
*L 111.VA - / /1884 WWS Built new -
/ /1892 - Modified WP 92/4671
/ /1899 - Scrapped 99/2818a
*L 112.VA - / /1881 WWS Built new -
/ /1892 - Modified WP 92/7107
/ /1901 - Scrapped 01/10282a; "Frame only"
*L 113.VA - / /1880 WWS Built new -
/ /1896 - Modified WP 96/957a
3/10/1908 NWS Built new WHB, Steel
3/10/1908 - Off Register redlined
/11/1926 - Modified 3'6" - 3'0" wheels
28/ 1/1932 NWS Into Workshops -
/ 2/1932 - Modified AC Allce LT
22/ 2/1932 NWS Out of Workshops (26 days)
/ /1970 - Scrapped -
*L 114.VA - / /1880 WWS Built new -
/ /1893 - Modified WP 93/679
/ /1897 - Scrapped 97/4504a
18/ 9/1897 NWS Built new WHB
/10/1931 - Modified Trans hook
/ 5/1932 - Modified AC Allce LT
*L 115.VA - / /1875 W&H Built new -
/ 6/1890 NWS Scrapped 90/5989
18/ 9/1897 NWS Built new WHB
11/ 3/1932 NWS Into Workshops -
/ 3/1932 - Modified AC Allce LT
5/ 4/1932 NWS Out of Workshops (26 days)
*L 116.VA - / /1881 WWS Built new -
/ /1892 - Modified WP 92/6585
/ /1896 - Scrapped Dismantled 96/6300a
30/ 9/1896 NWS Built new WH 96/5708a, replace 116L
/10/1923 - Modified 4 1/2" journals
3/ 8/1931 NWS Into Workshops -
3/ 9/1931 NWS Out of Workshops (32 days)
/ 9/1931 - Modified Trans hook
/ 5/1932 - Modified AC Allce LT
.
Vehicle.............SV # Date...... Loc History............SV Notes
*L 117.VA - / /1880 WWS Built new -
/ /1893 - Modified WP 93/4232
/ 5/1910 - Modified WHB
29/11/1913 NWS Built new WHB, Iron
29/11/1913 - Off Register redlined
4/ 5/1931 NWS Into Workshops -
26/ 6/1931 NWS Out of Workshops (50 days)
16/ 2/1932 NWS Into Workshops -
3/ 3/1932 NWS Out of Workshops (17 days)
/ 3/1932 - Modified AC Allce LT
/ /1970 - Scrapped R104
13/ 4/1978 RAA Sighting DH/RO "Off Reg"
*L 118.VA - / /1880 WWS Built new -
/ /1893 - Modified WP 93/679
circa 1894 - Modified "Nobles buffers"
19/ 7/1896 - Not Traced Stocktake Not in existence ...
25/ 9/1897 NWS Built new WHB
22/ 5/1931 NWS Into Workshops -
10/ 7/1931 NWS Out of Workshops (50 days)
/ 8/1931 - Modified Trans hook
/ 5/1932 - Modified AC Allce LT; (8/32)
*L 119.VA - / /1881 WWS Built new -
circa 1893 - Modified WHB
/11/1909 - Off Register redlined
11/11/1909 NWS Built new WHB, Iron
/10/1931 - Modified Trans hook
30/ 1/1932 NWS Into Workshops -
17/ 6/1932 NWS Out of Workshops (50 days)
/ 6/1932 - Modified AC Allce LT
*L 120.VA - / /1875 W&H Built new -
/ 6/1891 NWS Scrapped 91/5642
25/ 9/1897 NWS Built new WHB
9/ 1/1932 NWS Into Workshops -
10/ 2/1932 NWS Out of Workshops (33 days)
/ 2/1932 - Modified Trans hook
/ 5/1932 - Modified AC Allce LT
4/ 6/1980 NWS Sold (to) [CRS]: to Sims
17/ 7/1980 - Off Register [CRS]
*L 121.VA 1st / /1875 W&H Built new -
/ /1892 - Modified WP 92/6585
/ /1896 - Scrapped Dismantled 96/6300a
>>>
*L 121.VA 2nd 9/10/1896 NWS Built new Iron, WH 96/5962a. Rebuild replace 121L
/ 8/1911 - Modified Spiral sprg/couplers
21/ 4/1932 NWS Into Workshops -
5/ 5/1932 NWS Out of Workshops (15 days)
/ 5/1932 - Modified AC Allce LT
/ /1971 - Scrapped R104
*L 122.VA 1st / /1875 W&H Built new -
/ /1892 - Modified WP 92/7107
/ /1896 - Scrapped Dismantled 96/2832a
>>>
.
Vehicle.............SV # Date...... Loc History............SV Notes
*L 122.VA 2nd 12/ 8/1896 NWS Built new WHB, Rebuilt in place 122L 96/4521a
/ 2/1921 - Modified 4 1/2" journals, 8 - 10t
8/ 1/1932 NWS Into Workshops -
/ 1/1932 - Modified Trans hook
22/ 1/1932 NWS Out of Workshops (15 days)
/ 5/1932 - Modified AC Allce LT
2/ 8/1960 NWS Scrapped -
*L 123.VA 1st / /1875 W&H Built new -
/ /1892 - Modified WP 92/6585
/ /1896 - Scrapped Dismantled 96/6300a
>>>
*L 123.VA 2nd 9/10/1896 NWS Built new WHB, iron. Rebuilt replace 123, 96/5962a
14/ 5/1932 NWS Into Workshops -
1/ 6/1932 NWS Out of Workshops (19 days)
/ 6/1932 - Modified AC Allce LT
*L 124.VA 1st / /1881 WWS Built new -
/ /1892 - Modified WP 92/6585
/ /1896 - Scrapped Dismantled 96/7642a
>>>
*L 124.VA 2nd 20/11/1896 NWS Built new WHB, Iron, 96/7098a. Rebuilt replace 124.
8/ 1/1932 NWS Into Workshops -
3/ 2/1932 NWS Out of Workshops (27 days)
/ 2/1932 - Modified Trans hook
/ 5/1932 - Modified AC Allce LT
25/ 3/1982 - Off Register [CRS]
15/ 9/1982 BOW Scrapped [CRS]: body to SRD
*L 125.VA 1st / /1881 WWS Built new -
/ /1892 - Modified WP 92/4671
/ /1896 - Scrapped Dismantled 96/6300a
>>>
*L 125.VA 2nd 9/10/1896 NWS Built new WHB, Iron, 96/5962a. Rebuilt replace 125.
/ 7/1932 - Modified AC Allce LT
/ /1975 - Scrapped RSN5/75
*L 126.VA 1st / /1877 TOZ Built new -
/ /1894 - Modified WP 94/7980
/ /1896 - Scrapped Dismantled 96/7039a
>>>
*L 126.VA 2nd 16/10/1896 NWS Built new WHB, Iron, 96/6099a, Rebuilt replace 126.
3/ 5/1932 NWS Into Workshops -
/ 6/1932 - Modified AC Allce LT
23/ 6/1932 NWS To LB 126.VA (50 days)
LB 126.VA - 7/ 8/1936 NWS Into Workshops (with LB 849)
29/ 9/1936 NWS Out of Workshops (50 days)
circa 1959 - To L 126.VA -
*L 126.VA 2nd / /1969 - Scrapped -
*L 128.VA 1st / /1877 TOZ Built new -
/ /1894 - Modified WP 94/7980
/ /1904 - Scrapped 04/850a
>>>
*L 128.VA 2nd 17/ 6/1905 NWS Built new WHB, Iron
9/ 2/1932 NWS Into Workshops -
/ 2/1932 - Modified AC Allce LT
25/ 2/1932 NWS Out of Workshops (17 days)
.
Vehicle.............SV # Date...... Loc History............SV Notes
*L 129.VA 1st / /1877 TOZ Built new -
circa 1885 - Off Register redlined
>>>
*L 129.VA 2nd / 9/1885 WWS Built new "(Low top)"
circa 1892 - Modified WHB
/ /1897 - Scrapped 97/4504a
>>>
*L 129.VA 3rd 25/ 9/1897 NWS Built new WHB
23/ 2/1932 NWS Into Workshops -
11/ 3/1932 NWS Out of Workshops (18 days)
/ 3/1932 - Modified AC Allce LT
21/ 8/1981 NWS Scrapped [CRS]
22/ 9/1981 - Off Register [CRS]
*L 130.VA 1st / /1877 TOZ Built new -
/ /1894 - Modified WP 94/7377
/ /1896 - Scrapped Dismantled 96/7039a
>>>
*L 130.VA 2nd 16/10/1896 NWS Built new WHB, Iron, 96/6099a. Rebuilt replace 130.
1/ 3/1932 NWS Into Workshops -
17/ 3/1932 NWS Out of Workshops (17 days)
/ 3/1932 - Modified AC Allce LT
*L 131.VA 1st / /1877 TOZ Built new -
/ /1892 - Modified WP 92/6585
/ /1896 - Scrapped Dismantled 96/2832a
>>>
*L 131.VA 2nd 19/ 8/1896 NWS Built new WHB, rebuilt in place of 131.
18/ 1/1932 NWS Into Workshops -
17/ 2/1932 NWS Out of Workshops (31 days)
/ 2/1932 - Modified Trans hook
/ 5/1932 - Modified AC Allce LT
3/ 3/1960 SER Scrapped -
*L 132.VA 1st / /1877 TOZ Built new -
/ /1896 - Scrapped Dismantled 96/2832a
>>>
*L 132.VA 2nd 21/ 8/1896 NWS Built new WH 96/4835a, Rebuilt in place of 132.
16/ 5/1932 NWS Into Workshops -
31/ 5/1932 NWS Out of Workshops (16 days)
/ 6/1932 - Modified AC Allce LT
21/ 8/1981 NWS Scrapped [CRS]
22/ 9/1981 - Off Register [CRS]
*L 133.VA 1st / /1877 TOZ Built new -
/ /1894 - Modified WP 94/7980a
/ /1896 - Scrapped Dismantled 96/7039a
>>>
*L 133.VA 2nd 16/10/1896 NWS Built new WH 96/6099a, Iron, Rebuilt in place 133.
16/ 2/1932 NWS Into Workshops -
3/ 3/1932 NWS Out of Workshops (17 days)
/ 3/1932 - Modified AC Allce LT
*L 134.VA 1st / /1877 TOZ Built new -
/ /1892 - Modified WP 92/7107
/ /1896 - Scrapped Dismantled 96/7022a
>>>
.
Vehicle.............SV # Date...... Loc History............SV Notes
*L 134.VA 2nd 24/10/1896 NWS Built new WH 96/6297a, Iron, Rebuilt replace 134.
9/ 2/1932 NWS Into Workshops -
/ 3/1932 - Modified AC Allce LT
22/ 3/1932 NWS Out of Workshops (43 days)
*L 135.VA 1st / /1877 TOZ Built new -
/ /1893 - Modified WP 93/8258
/ /1904 - Scrapped 04/850a
>>>
*L 135.VA 2nd 17/ 6/1905 NWS Built new WHB, Iron
17/ 3/1932 NWS Into Workshops -
/ 3/1932 - Modified AC Allce LT
5/ 4/1932 NWS Out of Workshops (20 days)
17/ 1/1961 NWS Scrapped -
*L 136.VA 1st / /1877 TOZ Built new -
/ /1896 - Scrapped Dismantled 96/7022a
>>>
*L 136.VA 2nd 24/10/1896 NWS Built new WHB
27/ 2/1932 NWS Into Workshops -
11/ 3/1932 NWS Out of Workshops (14 days)
/ 3/1932 - Modified AC Allce LT, ( not marked as Continuous couplers).
19/ 6/1936 NWS Into Workshops -
5/ 8/1936 NWS Out of Workshops (48 days)
*L 137.VA 1st / /1877 TOZ Built new -
/ /1894 - Modified WP 94/7980
/ /1896 - Scrapped Dismantled 96/6761a
>>>
*L 137.VA 2nd 26/10/1896 NWS Built new WH 96/6442a, Iron, Rebuild replace 137.
26/ 4/1932 NWS Into Workshops -
/ 7/1932 - Modified AC Allce LT
7/ 7/1932 NWS To LB 137.VA (50 days)
*L 138.VA - / /1877 TOZ Built new -
/ /1892 - Modified WP 92/6585
/ /1899 - Scrapped 99/2601a
*L 139.VA 1st / /1877 TOZ Built new -
/ /1894 - Modified WP 94/7980
/ /1896 - Scrapped Dismantled 96/7224a
>>>
*L 139.VA 2nd 30/10/1896 NWS Built new WH 96/6580a, Rebuild in place 139.
/10/1931 - Modified Trans hook
/ 5/1932 - Modified AC Allce LT
*L 140.VA 1st / /1877 TOZ Built new -
/ /1896 - Scrapped Dismantled 96/2832a
>>>
*L 140.VA 2nd 21/ 8/1896 NWS Built new WHB, Rebuilt in place of 140L 96/4835a.
/10/1931 - Modified Trans hook
/ 5/1932 - Modified AC Allce LT
*L 141.VA 1st / /1877 TOZ Built new -
circa 1894 - Note (Redlined, rubbed & re-entered)
/ /1894 - Modified WP 94/7980a
/ /1896 - Scrapped Dismantled 96/7439a
>>>
.
Vehicle.............SV # Date...... Loc History............SV Notes
*L 141.VA 2nd 30/10/1896 NWS Built new WH 96/6580a, Rebuilt in place 141.
6/ 4/1932 NWS Into Workshops -
19/ 4/1932 NWS Out of Workshops (14 days)
/ 4/1932 - Modified AC Allce LT
*L 142.VA 1st / /1877 TOZ Built new -
/ /1894 - Modified WP 94/7980a
/ /1896 - Scrapped Dismantled 96/7439a
>>>
*L 142.VA 2nd 6/11/1896 NWS Built new WH 96/6645a, Rebuilt replace 142
/ 2/1912 - Modified Spiral Sprg/couplers
16/ 2/1932 NWS Into Workshops -
/ 3/1932 - Modified AC Allce LT
22/ 3/1932 NWS Out of Workshops (36 days)
*L 143.VA - / /1884 WWS Built new -
/ /1893 - Modified WP 93/679
circa 1893 - Modified "Nobles Buffers"
/ /1903 - Scrapped 03/28a
*L 144.VA - / /1877 TOZ Built new -
/ /1894 - Modified WP 94/7980
/ /1899 - Scrapped 99/2818a
*L 145.VA 1st / /1877 TOZ Built new -
/ /1892 - Modified WP 92/6585
/ /1904 - Scrapped 04/850a
>>>
*L 145.VA 2nd 17/ 6/1905 NWS Built new WHB, Iron
/ 8/1931 - Modified Trans hook
/ 5/1932 - Modified AC Allce LT
*L 146.VA 1st / /1877 TOZ Built new -
/ /1893 - Modified WP 93/4232
/ /1896 - Scrapped Dismantled 96/7439a
>>>
*L 146.VA 2nd 6/11/1896 NWS Built new WH 96/6645a, Rebuilt replace 146
18/ 1/1932 NWS Into Workshops -
9/ 4/1932 NWS Out of Workshops (50 days)
/ 4/1932 - Modified AC Allce LT
*L 147.VA 1st / /1877 TOZ Built new -
circa 1894 - Modified WHB
/10/1907 - Scrapped 07/8489a
>>>
*L 147.VA 2nd 19/10/1907 NWS Built new WHB, Iron
16/ 3/1931 NWS Into Workshops -
29/ 5/1931 NWS Out of Workshops (50 days)
24/ 5/1932 NWS Into Workshops -
13/ 6/1932 NWS Out of Workshops (21 days)
/ 6/1932 - Modified AC Allce LT
/ /1969 - Scrapped -
*L 148.VA - / /1877 TOZ Built new -
/ /1893 - Modified WP 93/4656
/ /1899 - Scrapped 99/2601a
.
Vehicle.............SV # Date...... Loc History............SV Notes
*L 149.VA 1st / /1877 TOZ Built new -
/ /1895 - Modified WP 95/6370a
/ /1904 - Scrapped 04/850a
>>>
*L 149.VA 2nd 17/ 6/1905 NWS Built new WHB, Iron
26/ 4/1932 NWS Into Workshops -
11/ 5/1932 NWS Out of Workshops (16 days)
/ 5/1932 - Modified AC Allce LT
*L 150.VA - / /1877 TOZ Built new -
/ /1893 - Modified WP 93/8258
/ /1899 - Scrapped 99/2601a
*L 151.VA 1st / /1877 TOZ Built new -
/ /1892 - Modified WP 92/6585
/ /1896 - Scrapped Dismantled 96/7224a
>>>
*L 151.VA 2nd 6/11/1896 NWS Built new WH 96/6645a, Rebuilt in place 151.
/12/1919 - Modified 4 1/2" journals, 8 - 10t.
8/ 4/1932 NWS Into Workshops -
/ 4/1932 - Modified AC Allce LT
28/ 4/1932 NWS Out of Workshops (21 days)
/ /1970 - Scrapped -
*L 152.VA 1st / /1877 TOZ Built new -
/ /1892 - Modified WP 92/7107
/ /1897 - Scrapped 97/4375a
>>>
*L 152.VA 2nd 25/ 9/1897 NWS Built new WHB
/ 1/1920 - Modified 4 1/2" journals, 8 - 10t.
2/ 4/1932 NWS Into Workshops -
15/ 4/1932 NWS Out of Workshops (14 days)
/ 4/1932 - Modified AC Allce LT
*L 153.VA - / /1877 TOZ Built new -
/ /1893 - Modified WP 93/4232
/ /1899 - Scrapped 99/2601a
*L 154.VA 1st / /1877 TOZ Built new -
/ /1894 - Modified WP 94/7377
/ /1896 - Scrapped 96/5102a
>>>
*L 154.VA 2nd 19/ 8/1896 NWS Built new WH 96/5465a, Iron, Rebuilt in place 154.
8/ 1/1932 NWS Into Workshops -
13/ 2/1932 NWS Out of Workshops (37 days)
/ 2/1932 - Modified Trans hook
/ 5/1932 - Modified AC Allce LT
/ /1975 - Photograph #280A
/ /1977 - Photograph #747
/ 5/1977 - Scrapped NR
*L 155.VA 1st / /1877 TOZ Built new -
/ /1894 - Modified WP 94/7982a
/ /1896 - Scrapped Dismantled 96/7224a
>>>
.
Vehicle.............SV # Date...... Loc History............SV Notes
*L 155.VA 2nd 6/11/1896 NWS Built new WH 96/6645a, Rebuilt in place 155.
/ 8/1911 - Modified Spiral Sprg/couplers
/10/1931 - Modified Trans hook
/ 5/1932 - Modified AC Allce LT
*L 156.VA - / /1877 TOZ Built new -
/ /1894 - Modified WP 94/7377
/ /1897 - Scrapped 97/4375a
*L 157.VA 1st / /1877 TOZ Built new -
circa 1893 - Modified WHB
/ /1904 - Scrapped L04/850a
>>>
*L 157.VA 2nd 17/ 6/1905 NWS Built new WHB, Iron
10/12/1930 NWS Into Workshops -
31/ 7/1931 NWS Out of Workshops (50 days)
18/ 1/1932 NWS Into Workshops -
2/ 2/1932 NWS Out of Workshops (16 days)
/ 2/1932 - Modified Trans hook
/ 5/1932 - Modified AC Allce LT
/ /1970 - Scrapped -
*L 158.VA 1st / /1884 WWS Built new -
circa 1894 - Modified WHB
/11/1906 - Off Register redlined
>>>
*L 158.VA 2nd 23/11/1906 NWS Built new WHB, Iron
5/ 3/1932 NWS Into Workshops -
17/ 3/1932 NWS Out of Workshops (13 days)
/ 3/1932 - Modified AC Allce LT
/ /1970 - Scrapped R104
*L 159.VA - / /1877 TOZ Built new -
/ /1893 - Modified WP 93/4232
/ /1899 - Scrapped 99/2601a
*L 160.VA - / /1884 WWS Built new -
/ /1893 - Modified WP 93/679
circa 1894 - Modified "Nobles Buffers"
/ /1899 - Scrapped 99/2601a
*L 161.VA 1st / /1877 TOZ Built new -
/ /1893 - Modified WP 93/8258
/ /1896 - Scrapped Dismantled 96/2832a
>>>
*L 161.VA 2nd 28/ 8/1896 NWS Built new WH 96/4967a, Iron, Rebuilt in place 161L
/10/1931 - Modified Trans hook
/ 5/1932 - Modified AC Allce LT
*L 162.VA 1st / /1877 TOZ Built new -
/ /1893 - Modified WP 93/4232a
/ /1904 - Scrapped 04/850a
>>>
.
Vehicle.............SV # Date...... Loc History............SV Notes
*L 162.VA 2nd 9/ 9/1905 NWS Built new WH 05/8876a, Iron
14/ 5/1932 NWS Into Workshops -
/ 5/1932 - Modified AC Allce LT
27/ 5/1932 NWS Out of Workshops (14 days)
25/ 6/1981 - Off Register [CRS]
4/ 9/1981 NWS Scrapped [CRS]
*L 163.VA 1st / /1883 HKN Built new -
/ /1892 - Modified WP 92/6585
/ /1900 - Modified WH 00/3742a
3/10/1908 - Off Register redlined
>>>
*L 163.VA 2nd 3/10/1908 NWS Built new WHB, Steel
19/ 3/1932 NWS Into Workshops -
/ 3/1932 - Modified AC Allce LT
5/ 4/1932 NWS Out of Workshops (18 days)
/ /1971 - Scrapped R104
*L 164.VA 1st / /1883 HKN Built new -
circa 1892 - Modified WHB
17/ 3/1910 - Off Register redlined
>>>
*L 164.VA 2nd 17/ 3/1910 NWS Built new WHB, Iron
13/ 5/1932 NWS Into Workshops -
/ 7/1932 - Modified Auto cpled
20/ 7/1932 NWS Out of Workshops (50 days)
/ /1970 - Scrapped -
*L 165.VA - / /1883 HKN Built new -
/ /1892 - Modified WP 92/5703
/ /1901 - Scrapped 01/10282a
*L 166.VA 1st / /1883 HKN Built new -
circa 1889 - Note "Hy brake (X'd)"
/ /1893 - Modified WP 93/679
circa 1893 - Modified "Nobles Buffers"
circa 1902 - Note "1902 --- --- pipe"
/10/1907 - Modified 4" journals
29/ 6/1912 - Off Register redlined
>>>
*L 166.VA 2nd 29/ 6/1912 NWS Built new WHB, Iron
27/11/1931 NWS Into Workshops -
/12/1931 - Modified Trans hook
22/12/1931 NWS Out of Workshops (26 days)
/ 5/1932 - Modified AC Allce LT
*L 167.VA 1st / /1883 HKN Built new -
/ /1893 - Modified WP 93/679
/ /1903 - Modified WH 03/5794a
17/ 3/1910 - Off Register redlined
>>>
*L 167.VA 2nd 17/ 3/1910 NWS Built new WHB, Iron
28/ 1/1932 NWS Into Workshops -
/ 2/1932 - Modified AC Allce LT
23/ 2/1932 NWS Out of Workshops (27 days)
.
Vehicle.............SV # Date...... Loc History............SV Notes
*L 168.VA 1st / /1883 HKN Built new -
/ /1892 - Modified WP 92/5703
circa 1892 - Modified 3 1/2" journals
/ /1896 - Scrapped Dismantled 96/2832a
>>>
*L 168.VA 2nd 28/ 8/1896 NWS Built new WH 96/4967a, Iron, Rebuilt in place 168
/ 7/1932 - Modified AC Allce LT
*L 169.VA 1st / /1883 HKN Built new -
circa 1893 - Modified WHB
/11/1909 - Off Register redlined
>>>
*L 169.VA 2nd 11/11/1909 NWS Built new WHB, Iron
2/ 4/1932 NWS Into Workshops -
15/ 4/1932 NWS Out of Workshops (14 days)
/ 4/1932 - Modified AC Allce LT
*L 170.VA 1st / /1883 HKN Built new -
/ /1892 - Modified WH 92/5703
/ /1896 L&D Destroyed Smashed ... 96/4434
>>>
*L 170.VA 2nd 14/11/1896 NWS Built new WH 96/6808a, Iron, Rebuilt replace 170
27/ 2/1932 NWS Into Workshops -
11/ 3/1932 NWS Out of Workshops (14 days)
/ 3/1932 - Modified AC Allce LT
*L 171.VA 1st / /1883 HKN Built new -
circa 1893 - Modified WHB
/ /1896 - Scrapped Dismantled 96/2832a
>>>
*L 171.VA 2nd 5/ 9/1896 NWS Built new WH 96/5161a, Iron, Rebuilt in place 171
1/ 3/1932 NWS Into Workshops -
17/ 3/1932 NWS Out of Workshops (17 days)
/ 3/1932 - Modified AC Allce LT
/ 9/1955 - Modified FFA-1 axleboxes
/ /1971 - Scrapped R104
*L 172.VA 1st / /1883 HKN Built new -
/ /1892 - Modified WH 92/5703
circa 1905 - Off Register redlined
>>>
*L 172.VA 2nd 16/ 9/1905 NWS Built new WHB, Iron, 05/9250a
/ 8/1932 - Modified AC Allce LT
22/11/1982 - Off Register [CRS]
27/ 6/1983 SRD Scrapped [CRS]: ex BOW
*L 173.VA 1st / /1883 HKN Built new -
/ /1894 - Modified WP 94/7980
3/10/1908 - Off Register redlined
>>>
*L 173.VA 2nd 3/10/1908 NWS Built new WHB, Steel
/ 9/1931 - Modified Trans hook
/ 5/1932 - Modified AC Allce LT
24/ 6/1980 NMW Off Register [CRS]
.
Vehicle.............SV # Date...... Loc History............SV Notes
*L 174.VA 1st / /1883 HKN Built new -
circa 1892 - Modified WHB
/ /1896 - Scrapped Dismantled 96/2832a
>>>
*L 174.VA 2nd 5/ 9/1896 NWS Built new WH 96/5161a, Iron, Rebuilt in place of 174
/ 7/1932 - Modified Auto cpled
/ /1971 - Scrapped R104
*L 175.VA - / /1883 HKN Built new -
circa 1893 - Modified WHB
/ /1901 - Scrapped 01/10282a
*L 176.VA 1st / /1883 HKN Built new -
/ /1894 - Modified WP 94/7980
circa 1905 - Off Register redlined
>>>
*L 176.VA 2nd 9/ 9/1905 NWS Built new WH 05/8876a, Iron
22/ 4/1931 NWS Into Workshops -
/ 8/1931 - Modified Trans hook
26/ 8/1931 NWS Out of Workshops (50 days)
/ 4/1932 - Modified AC Allce LT
*L 177.VA 1st / /1883 HKN Built new -
/ /1892 - Modified WH 92/5703
/10/1907 - Modified 4" journals
9/ 4/1910 - Off Register redlined
>>>
*L 177.VA 2nd 9/ 4/1910 NWS Built new WHB, Iron
21/ 5/1932 NWS Into Workshops -
17/ 6/1932 NWS Out of Workshops (28 days)
/ 6/1932 - Modified AC Allce LT
/ /1970 - Scrapped -
*L 178.VA 1st / /1883 HKN Built new -
/ /1893 - Modified WP 93/4232
/10/1907 - Modified 4" journals
3/10/1908 - Off Register redlined
>>>
*L 178.VA 2nd 3/10/1908 NWS Built new WHB, Iron
18/ 1/1932 NWS Into Workshops -
/ 1/1932 - Modified Trans hook
30/ 1/1932 NWS Out of Workshops (13 days)
/ 5/1932 - Modified AC Allce LT
*L 179.VA 1st / /1883 HKN Built new -
/ /1892 - Modified WH 92/5703
10/10/1908 - Off Register redlined
>>>
*L 179.VA 2nd 10/10/1908 NWS Built new WHB, Iron
18/12/1931 NWS Into Workshops -
11/ 1/1932 NWS Out of Workshops (25 days)
/ 1/1932 - Modified Trans hook
/ 5/1932 - Modified AC Allce LT
*L 180.VA 1st / /1883 HKN Built new -
circa 1893 - Modified WHB
/ /1896 - Scrapped Dismantled 96/2832a
>>>
.
Vehicle.............SV # Date...... Loc History............SV Notes
*L 180.VA 2nd 9/ 9/1896 NWS Built new WH 96/5162a, Iron, Rebuilt in place of 180
26/ 4/1932 NWS Into Workshops -
16/ 5/1932 NWS Out of Workshops (21 days)
/ 5/1932 - Modified AC Allce LT
*L 181.VA - / /1883 HKN Built new -
/ /1894 - Modified WP 94/311,312
/ /1901 - Scrapped 01/10282a
*L 182.VA 1st / /1883 HKN Built new -
circa 1892 - Modified WHB
/11/1906 - Off Register redlined
>>>
*L 182.VA 2nd 15/11/1906 NWS Built new WHB, Iron
/ 8/1932 - Modified AC Allce LT
*L 183.VA 1st 30/ 6/1890 JHF Built new WH QA 90/6102
circa 1905 - Off Register redlined
>>>
*L 183.VA 2nd 23/ 9/1905 NWS Built new WHB, Iron, 05/9450a
/10/1931 - Modified Trans hook
/ 5/1932 - Modified AC Allce LT
*L 184.VA 1st 7/ 7/1890 JHF Built new WH QA 90/6327
/11/1906 - Off Register redlined
>>>
*L 184.VA 2nd 23/11/1906 NWS Built new WHB, Iron
2/ 4/1932 NWS Into Workshops -
15/ 4/1932 NWS Out of Workshops (14 days)
/ 4/1932 - Modified AC Allce LT
6/ 7/1959 NWS Scrapped -
*L 185.VA 1st 7/ 7/1890 JHF Built new WH QA 90/6327
/11/1906 - Off Register redlined
>>>
*L 185.VA 2nd 23/11/1906 NWS Built new WHB, Iron
/ 2/1923 - Modified 4 1/2" journals
/10/1931 - Modified Trans hook
/ 4/1932 - Modified AC Allce LT
*L 186.VA 1st 7/ 7/1890 JHF Built new WH QA 90/6327
/ 6/1907 - Off Register redlined
>>>
*L 186.VA 2nd 22/ 6/1907 NWS Built new WHB, Iron
/ 8/1911 - Modified Spiral Sprg/couplers
9/ 1/1932 NWS Into Workshops -
11/ 2/1932 NWS Out of Workshops (34 days)
/ 2/1932 - Modified AC Allce LT
*L 187.VA 1st 7/ 7/1890 JHF Built new WH QA 90/6327
circa 1905 - Off Register redlined
>>>
.
Vehicle.............SV # Date...... Loc History............SV Notes
*L 187.VA 2nd 9/ 9/1905 NWS Built new WHB, Iron, 05/8896a
16/ 9/1930 NWS Into Workshops -
23/12/1930 NWS Out of Workshops (99 days)
15/12/1931 NWS Into Workshops -
6/ 1/1932 NWS Out of Workshops (23 days)
/ 1/1932 - Modified Trans hook
/ 5/1932 - Modified AC Allce LT
/ /1970 - Scrapped R104
*L 188.VA 1st 7/ 7/1890 JHF Built new WH QA 90/6327
3/10/1908 - Off Register redlined
>>>
*L 188.VA 2nd 3/10/1908 NWS Built new WHB, Iron
/ 7/1932 - Modified AC Allce LT
/ /1976 - Scrapped RSN11/76
*L 189.VA 1st 7/ 7/1890 JHF Built new WH QA 90/6229
31/ 1/1907 - Off Register redlined 07/1065a
>>>
*L 189.VA 2nd 31/ 1/1907 NWS Built new WHB, Iron
25/ 5/1932 NWS Into Workshops -
/ 6/1932 - Modified AC Allce LT
16/ 6/1932 NWS To LB 189.VA (23 days)
*L 190.VA 1st 9/ 8/1890 JHF Built new WH QA 90/7536
/ 5/1905 - Off Register redlined ... To be rebuilt
>>>
*L 190.VA 2nd 27/ 5/1905 NWS Built new WHB, Iron
21/ 4/1932 NWS Into Workshops -
12/ 5/1932 NWS Out of Workshops (22 days)
/ 5/1932 - Modified AC Allce LT
*L 191.VA 1st 9/ 8/1890 JHF Built new WH QA 90/7536
/11/1906 - Off Register redlined
>>>
*L 191.VA 2nd 30/11/1906 NWS Built new WHB, Iron
22/ 7/1931 NWS Into Workshops -
/ 8/1931 - Modified Trans hook
28/ 8/1931 NWS Out of Workshops (38 days)
/ 5/1932 - Modified AC Allce LT
*L 192.VA 1st 9/ 8/1890 JHF Built new WH QA 90/7536
31/ 1/1907 - Off Register redlined 07/1065a
>>>
*L 192.VA 2nd 31/ 1/1907 NWS Built new WHB, Iron
28/ 1/1932 NWS Into Workshops -
/ 2/1932 - Modified AC Allce LT
24/ 2/1932 NWS Out of Workshops (28 days)
*L 193.VA 1st 9/ 8/1890 JHF Built new WH QA 90/7536
/ 5/1905 - Off Register redlined ... (To be rebuilt)
>>>
.
Vehicle.............SV # Date...... Loc History............SV Notes
*L 193.VA 2nd 20/ 5/1905 NWS Built new WHB, Iron
19/ 2/1932 NWS Into Workshops -
5/ 3/1932 NWS Out of Workshops (16 days)
/ 3/1932 - Modified AC Allce LT
13/ 3/1934 NWS Into Workshops -
19/10/1934 NWS Out of Workshops (50 days)
11/ 7/1955 - Scrapped -
*L 194.VA 1st 9/ 8/1890 JHF Built new WH QA 90/7536
/11/1906 - Off Register redlined
>>>
*L 194.VA 2nd 30/11/1906 NWS Built new WHB, Iron
10/ 5/1932 NWS Into Workshops -
13/ 6/1932 NWS Out of Workshops (35 days)
/ 6/1932 - Modified Auto cpled
*L 195.VA 1st 9/ 8/1890 JHF Built new WH QA 90/7536
/11/1906 - Off Register redlined
>>>
*L 195.VA 2nd 30/11/1906 NWS Built new WHB, Iron
16/ 2/1932 NWS Into Workshops -
3/ 3/1932 NWS Out of Workshops (17 days)
/ 3/1932 - Modified AC Allce LT
*L 196.VA 1st 13/ 9/1890 JHF Built new WH QA 90/8762
circa 1905 - Off Register redlined
>>>
*L 196.VA 2nd 16/ 9/1905 NWS Built new WHB, Iron, 05/9250a
/ 6/1911 - Modified Spiral Sprg/couplers
/ 8/1932 - Modified AC Allce LT
*L 197.VA 1st 13/ 9/1890 JHF Built new WH QA 90/8762
/ /1904 - Off Register redlined 04/1599a, To be rebuilt
>>>
*L 197.VA 2nd 27/ 5/1905 NWS Built new WHB, Iron
19/ 3/1932 NWS Into Workshops -
/ 3/1932 - Modified AC Allce LT
5/ 4/1932 NWS Out of Workshops (18 days)
*L 198.VA 1st 13/ 9/1890 JHF Built new WH QA 90/8762
10/10/1908 - Off Register redlined
>>>
*L 198.VA 2nd 10/10/1908 NWS Built new WHB, Iron
18/ 5/1932 NWS Into Workshops -
/ 6/1932 - Modified AC Allce LT
23/ 6/1932 NWS To LB 198.VA (37 days)
*L 199.VA 1st 13/ 9/1890 JHF Built new WH QA 90/8762
31/ 1/1907 - Off Register redlined 07/1065a
>>>
*L 199.VA 2nd 31/ 1/1907 NWS Built new WHB, Iron
/10/1912 - Modified Spiral Sprg/couplers
/11/1931 - Modified Trans hook
/ 5/1932 - Modified AC Allce LT
/ /1975 - Scrapped RSN5/75
.
Vehicle.............SV # Date...... Loc History............SV Notes
*L 200.VA 1st 13/ 9/1890 JHF Built new WH QA 90/8762
6/ 2/1907 - Off Register redlined
>>>
*L 200.VA 2nd 6/ 2/1907 NWS Built new WHB, Iron
22/ 6/1931 NWS Into Workshops -
31/ 7/1931 NWS Out of Workshops (40 days)
/ 8/1931 - Modified Trans hook
/ 5/1932 - Modified AC Allce LT
*L 201.VA 1st 13/ 9/1890 JHF Built new WH QA 90/8762
5/12/1906 - Off Register redlined 06/12647a "Broken Up"
>>>
*L 201.VA 2nd 5/12/1906 NWS Built new WHB, Iron
6/ 4/1932 NWS Into Workshops -
19/ 4/1932 NWS Out of Workshops (14 days)
/ 4/1932 - Modified AC Allce LT
10/ 3/1960 NWS Scrapped -
*L 202.VA 1st 13/ 9/1890 JHF Built new WH QA 90/8762
/11/1906 - Off Register redlined
>>>
*L 202.VA 2nd 15/11/1906 NWS Built new WHB, Iron
14/ 5/1932 NWS Into Workshops -
/ 7/1932 - Modified AC Allce LT
7/ 7/1932 NWS To LB 202.VA (50 days)
LB 202.VA - 28/ 8/1954 - To L 202.VA -
*L 203.VA 1st 17/10/1890 JHF Built new WH QA 90/9994
circa 1905 - Off Register redlined
>>>
*L 203.VA 2nd 16/ 9/1905 NWS Built new WHB, Iron, 05/9250a
16/12/1930 NWS Into Workshops -
13/ 8/1931 NWS Out of Workshops (50 days)
/ 8/1931 - Modified Trans hook
/ 5/1932 - Modified AC Allce LT
*L 204.VA 1st 17/10/1890 JHF Built new WH QA 90/9994
19/ 1/1907 - Off Register redlined 07/663a
>>>
*L 204.VA 2nd 19/ 1/1907 NWS Built new WHB, Iron
/12/1921 - Modified 4 1/2" journals
/12/1931 - Modified Trans hook
/ 4/1932 - Modified AC Allce LT
*L 205.VA 1st 17/10/1890 JHF Built new WH QA 90/9994
/ 6/1907 - Off Register redlined
>>>
*L 205.VA 2nd 26/ 6/1907 NWS Built new WHB, Iron
/12/1931 - Modified Trans hook
/ 5/1932 - Modified AC Allce LT
*L 206.VA 1st 17/10/1890 JHF Built new WH QA 90/9994
/11/1906 - Off Register redlined
>>>
.
Vehicle.............SV # Date...... Loc History............SV Notes
*L 206.VA 2nd 15/11/1906 NWS Built new WHB, Iron
21/ 4/1932 NWS Into Workshops -
5/ 5/1932 NWS Out of Workshops (15 days)
/ 5/1932 - Modified AC Allce LT
*L 207.VA 1st 17/10/1890 JHF Built new WH QA 90/9994
/ /1904 - Off Register redlined. To be rebuilt 04/1599a
>>>
*L 207.VA 2nd 10/ 6/1905 NWS Built new WHB, Iron
31/ 5/1931 NWS Into Workshops -
12/ 8/1931 NWS Out of Workshops (50 days)
/ 8/1931 - Modified Trans hook
/ 5/1932 - Modified AC Allce LT
*L 208.VA 1st 17/10/1890 JHF Built new WH QA 90/9994
/ 6/1907 - Off Register redlined
>>>
*L 208.VA 2nd 26/ 6/1907 NWS Built new WHB, Iron
12/ 1/1932 NWS Into Workshops -
11/ 2/1932 NWS Out of Workshops (31 days)
/ 2/1932 - Modified AC Allce LT
*L 209.VA 1st 17/10/1890 JHF Built new WH QA 90/9994
/ 6/1907 - Off Register redlined
>>>
*L 209.VA 2nd 22/ 6/1907 NWS Built new WHB, Iron
2/ 4/1932 NWS Into Workshops -
15/ 4/1932 NWS Out of Workshops (14 days)
/ 4/1932 - Modified AC Allce LT
*L 210.VA 1st 8/12/1890 JHF Built new WH QA 90/11703
/11/1906 - Off Register redlined
>>>
*L 210.VA 2nd 15/11/1906 NWS Built new WHB, Iron
26/ 4/1932 NWS Into Workshops -
13/ 5/1932 NWS Out of Workshops (18 days)
/ 5/1932 - Modified AC Allce LT
/ /1971 - Scrapped R104
*L 211.VA 1st 8/12/1890 JHF Built new WH QA 90/11703
6/ 2/1907 - Off Register redlined
>>>
*L 211.VA 2nd 6/ 2/1907 NWS Built new WHB, Iron
18/ 1/1932 NWS Into Workshops -
6/ 2/1932 NWS Out of Workshops (20 days)
/ 2/1932 - Modified AC Allce LT
*L 212.VA 1st 8/12/1890 JHF Built new WH QA 90/11703
10/10/1908 - Off Register redlined
>>>
*L 212.VA 2nd 10/10/1908 NWS Built new WHB, Iron
/ 8/1932 - Modified AC Allce LT
/ /1971 - Scrapped R104
*L 213.VA 1st 8/12/1890 JHF Built new WH QA 90/11703
/11/1906 - Off Register redlined
>>>
.
Vehicle.............SV # Date...... Loc History............SV Notes
*L 213.VA 2nd 15/11/1906 NWS Built new WHB, Iron
10/ 5/1932 NWS Into Workshops -
/ 6/1932 - Modified AC Allce LT
23/ 6/1932 NWS To LB 213.VA (45 days)
*L 214.VA 1st 8/12/1890 JHF Built new WH QA 90/11703
/10/1907 - Scrapped 07/8489a
>>>
*L 214.VA 2nd 19/10/1907 NWS Built new WHB, Iron
8/ 3/1932 NWS Into Workshops -
/ 3/1932 - Modified AC Allce LT
23/ 3/1932 NWS Out of Workshops (16 days)
*L 215.VA 1st 8/12/1890 JHF Built new WH QA 90/11703
circa 1905 - Off Register redlined
>>>
*L 215.VA 2nd 16/ 9/1905 NWS Built new WHB, Iron, 05/9250a
21/ 4/1932 NWS Into Workshops -
/ 7/1932 - Modified AC Allce LT
7/ 7/1932 NWS To LB 215.VA (50 days)
LB 215.VA - 14/ 4/1936 NWS Into Workshops -
28/ 8/1936 NWS Out of Workshops (50 days)
*L 216.VA 1st 8/12/1890 JHF Built new WH QA 90/11703
10/10/1908 - Off Register redlined
>>>
*L 216.VA 2nd 10/10/1908 NWS Built new WHB, Iron
3/ 8/1931 NWS Into Workshops -
3/ 9/1931 NWS Out of Workshops (32 days)
/ 9/1931 - Modified Trans hook
/ 5/1932 - Modified AC Allce LT
/ 8/1955 - Modified FFA-1 axleboxes
/ /1979 - Photograph #1219, #1301
*L 217.VA 1st 9/ 1/1891 JHF Built new WH QA 91/288
19/ 1/1907 - Off Register redlined 07/663a
>>>
*L 217.VA 2nd 19/ 1/1907 NWS Built new WHB, Iron
30/ 1/1932 NWS Into Workshops -
19/ 2/1932 NWS Out of Workshops (21 days)
/ 2/1932 - Modified AC Allce LT
/ /1976 - Scrapped RSN8/76
*L 218.VA 1st 9/ 1/1891 JHF Built new WH QA 91/288
19/ 1/1907 - Off Register redlined 07/663a
>>>
*L 218.VA 2nd 19/ 1/1907 NWS Built new WHB, Iron
20/10/1930 NWS Into Workshops -
8/12/1930 NWS Out of Workshops (50 days)
20/11/1931 NWS Into Workshops -
1/12/1931 NWS Out of Workshops (12 days)
/12/1931 - Modified Trans hook
/ 5/1932 - Modified AC Allce LT
/ /1971 - Scrapped DD1/72
*L 219.VA 1st 9/ 1/1891 JHF Built new WH QA 91/288
/11/1909 - Off Register redlined
>>>
.
Vehicle.............SV # Date...... Loc History............SV Notes
*L 219.VA 2nd 19/11/1909 NWS Built new WHB, Iron
29/ 1/1932 NWS Into Workshops -
17/ 2/1932 NWS Out of Workshops (20 days)
/ 2/1932 - Modified AC Allce LT
/ /1969 - Scrapped -
*L 220.VA 1st 9/ 1/1891 JHF Built new WH QA 91/288
29/ 6/1912 - Off Register redlined
>>>
*L 220.VA 2nd 29/ 6/1912 NWS Built new WHB, Iron
18/ 1/1932 NWS Into Workshops -
19/ 2/1932 NWS Out of Workshops (33 days)
/ 2/1932 - Modified AC Allce LT
6/ 1/1933 NWS Into Workshops -
17/11/1933 NWS Out of Workshops (50 days)
12/ 1/1961 NWS Scrapped -
*L 221.VA 1st 9/ 1/1891 JHF Built new WH QA 91/288
19/ 1/1907 - Off Register redlined, 07/663a
>>>
*L 221.VA 2nd 19/ 1/1907 NWS Built new WHB, Iron
/11/1931 - Modified Trans hook
/ 5/1932 - Modified AC Allce LT
*L 222.VA 1st 9/ 1/1891 JHF Built new WH QA 91/288
10/10/1908 - Off Register redlined
>>>
*L 222.VA 2nd 10/10/1908 NWS Built new WHB, Iron
/10/1931 - Modified Trans hook
/ 5/1932 - Modified AC Allce LT
2/ 8/1960 NWS Scrapped -
*L 223.VA 1st 9/ 1/1891 JHF Built new WH QA 91/288
10/10/1908 - Off Register redlined
>>>
*L 223.VA 2nd 10/10/1908 NWS Built new WHB, Iron
15/12/1931 NWS Into Workshops -
7/ 1/1932 NWS Out of Workshops (24 days)
/ 1/1932 - Modified Trans hook
/ 5/1932 - Modified AC Allce LT
*L 224.VA 1st 9/ 1/1891 JHF Built new WH QA 91/288
circa 1906 - Off Register redlined
>>>
*L 224.VA 2nd 19/ 1/1907 NWS Built new WHB, Iron
6/ 1/1932 NWS Into Workshops -
16/ 1/1932 NWS Out of Workshops (11 days)
/ 1/1932 - Modified Trans hook
/ 5/1932 - Modified AC Allce LT
*L 225.VA 1st 31/ 1/1891 JHF Built new WH QA 91/1210
/10/1908 - Off Register redlined
>>>
*L 225.VA 2nd 16/10/1908 NWS Built new WHB, Iron
15/ 4/1932 NWS Into Workshops -
/ 4/1932 - Modified AC Allce LT
30/ 4/1932 NWS Out of Workshops (16 days)
24/ 3/1970 SRD Scrapped -
.
Vehicle.............SV # Date...... Loc History............SV Notes
*L 226.VA 1st 31/ 1/1891 JHF Built new WH QA 91/1210
circa 1905 - Off Register redlined
>>>
*L 226.VA 2nd 16/ 9/1905 NWS Built new WHB, Iron 05/9250a
15/ 3/1932 NWS Into Workshops -
31/ 3/1932 NWS Out of Workshops (17 days)
/ 4/1932 - Modified AC Allce LT
10/10/1934 NWS Into Workshops -
28/ 9/1935 NWS Out of Workshops (50 days)
12/ 1/1961 NWS Scrapped -
*L 227.VA 1st 31/ 1/1891 JHF Built new WH QA 91/1210
17/ 3/1910 - Off Register redlined
>>>
*L 227.VA 2nd 17/ 3/1910 NWS Built new WHB, Iron
/11/1931 - Modified Trans hook
/ 5/1932 - Modified AC Allce LT
3/ 3/1980 SRD Scrapped [CRS]
*L 228.VA 1st 31/ 1/1891 JHF Built new WH QA 91/1210
circa 1909 - Off Register redlined
>>>
*L 228.VA 2nd 19/11/1909 NWS Built new WHB, Iron
26/ 4/1932 NWS Into Workshops -
11/ 5/1932 NWS Out of Workshops (16 days)
/ 5/1932 - Modified AC Allce LT
*L 229.VA 1st 31/ 1/1891 JHF Built new WH QA 91/1210
circa 1905 - Off Register To be rebuilt ...
>>>
*L 229.VA 2nd 3/ 6/1905 NWS Built new WHB, Iron
23/ 2/1932 NWS Into Workshops -
15/ 3/1932 NWS Out of Workshops (22 days)
/ 3/1932 - Modified AC Allce LT
/ /1977 - Scrapped NR1077
*L 230.VA 1st 31/ 1/1891 JHF Built new WH QA 91/1210
/10/1907 - Scrapped 07/8489a
>>>
*L 230.VA 2nd 19/10/1907 NWS Built new WHB, Iron
/11/1931 - Modified Trans hook
/ 5/1932 - Modified AC Allce LT
18/ 7/1980 BOW Scrapped [CRS]
13/ 8/1980 - Off Register [CRS]
*L 231.VA 1st 31/ 1/1891 JHF Built new WH QA 91/1210
26/ 1/1907 - Off Register redlined 07/859a
>>>
*L 231.VA 2nd 26/ 1/1907 NWS Built new WHB, Iron
17/ 2/1932 NWS Into Workshops -
/ 3/1932 - Modified AC Allce LT
22/ 3/1932 NWS Out of Workshops (35 days)
*L 232.VA 1st 31/ 1/1891 JHF Built new WH QA 91/1210
6/ 2/1907 - Off Register redlined
>>>
.
Vehicle.............SV # Date...... Loc History............SV Notes
*L 232.VA 2nd 6/ 2/1907 NWS Built new WHB, Iron
/10/1931 - Modified Trans hook
/ 5/1932 - Modified AC Allce LT
/ /1969 - Scrapped -
*L 233.VA 1st 19/ 2/1891 WHE Built new WH QA 91/1799
/ /1904 - Off Register To be rebuilt 04/1599a
>>>
*L 233.VA 2nd 20/ 5/1905 NWS Built new WHB, Iron
21/ 5/1932 NWS Into Workshops -
10/ 6/1932 NWS Out of Workshops (21 days)
/ 6/1932 - Modified AC Allce LT
*L 234.VA 1st 19/ 2/1891 WHE Built new WH QA 91/1799
/ 2/1907 - Off Register redlined
>>>
*L 234.VA 2nd 15/ 2/1907 NWS Built new WHB, Iron
/ 8/1932 - Modified AC Allce LT
*L 235.VA 1st 19/ 2/1891 WHE Built new WH QA 91/1799
circa 1904 - Off Register redlined
>>>
*L 235.VA 2nd 16/ 9/1905 NWS Built new WHB, Iron 05/9250a
27/ 2/1932 NWS Into Workshops -
11/ 3/1932 NWS Out of Workshops (14 days)
/ 3/1932 - Modified AC Allce LT
*L 236.VA 1st 19/ 2/1891 WHE Built new WH QA 91/1799
/ 2/1907 - Off Register redlined
>>>
*L 236.VA 2nd 15/ 2/1907 NWS Built new WHB, Iron
9/ 2/1932 NWS Into Workshops -
1/ 3/1932 NWS Out of Workshops (22 days)
/ 3/1932 - Modified AC Allce LT
3/12/1935 NWS Into Workshops -
3/ 3/1936 NWS Out of Workshops (50 days)
*L 237.VA 1st 19/ 2/1891 WHE Built new WH QA 91/1799
/12/1909 - Off Register redlined
>>>
*L 237.VA 2nd 4/12/1909 NWS Built new WHB, Iron
/ 6/1911 - Modified Spiral Sprg/couplers
19/ 4/1932 NWS Into Workshops -
4/ 5/1932 NWS Out of Workshops (16 days)
/ 5/1932 - Modified AC Allce LT
17/ 1/1961 NWS Scrapped -
*L 238.VA 1st 19/ 2/1891 WHE Built new WH QA 91/1799
/ /1904 - Off Register To be rebuilt 04/1599a
>>>
*L 238.VA 2nd 20/ 5/1905 NWS Built new WHB, Iron
9/ 2/1932 NWS Into Workshops -
9/ 4/1932 NWS Out of Workshops (50 days)
/ 4/1932 - Modified AC Allce LT
*L 239.VA 1st 17/ 3/1891 WHE Built new WH QA 91/2689
/12/1909 - Off Register redlined
>>>
.
Vehicle.............SV # Date...... Loc History............SV Notes
*L 239.VA 2nd 4/12/1909 NWS Built new WHB, Iron
/11/1931 - Modified Trans hook
/ 4/1932 - Modified AC Allce LT
*L 240.VA 1st 17/ 3/1891 WHE Built new WH QA 91/2689
/10/1908 - Off Register redlined
>>>
*L 240.VA 2nd 16/10/1908 NWS Built new WHB, Iron
10/ 5/1932 NWS Into Workshops -
/ 6/1932 - Modified AC Allce LT
16/ 6/1932 NWS To LB 240.VA (38 days)
LB 240.VA - 11/ 7/1955 - Scrapped -
*L 241.VA 1st 17/ 3/1891 WHE Built new WH QA 91/2689
/ 4/1910 - Off Register redlined
>>>
*L 241.VA 2nd 19/ 4/1910 NWS Built new WHB, Iron
14/ 1/1932 NWS Into Workshops -
/ 1/1932 - Modified Trans hook
27/ 1/1932 NWS Out of Workshops (14 days)
/ 5/1932 - Modified AC Allce LT
*L 242.VA 1st 17/ 3/1891 WHE Built new WH QA 91/2689
/ /1904 - Off Register L04/1599a, To be rebuilt
>>>
*L 242.VA 2nd 10/ 6/1905 NWS Built new WHB, Iron
13/ 5/1932 NWS Into Workshops -
/ 6/1932 - Modified AC Allce LT
22/ 6/1932 NWS Out of Workshops (41 days)
*L 243.VA 1st 17/ 3/1891 WHE Built new WH QA 91/2689
/10/1907 - Scrapped 07/8489a
>>>
*L 243.VA 2nd 19/10/1907 NWS Built new WHB, Iron
/ 3/1932 - Modified AC Allce LT
22/ 3/1932 NWS Into Workshops -
5/ 4/1932 NWS Out of Workshops (15 days)
*L 244.VA 1st 17/ 3/1891 WHE Built new WH QA 91/2689
26/ 1/1907 - Off Register redlined
>>>
*L 244.VA 2nd 26/ 1/1907 NWS Built new WHB, Iron
/ 8/1931 - Modified Trans hook
/ 5/1932 - Modified AC Allce LT
3/ 1/1936 NWS Into Workshops -
21/ 2/1936 NWS Out of Workshops (50 days)
12/ 1/1961 NWS Scrapped -
*L 245.VA 1st 14/ 4/1891 WHE Built new WH QA 91/3588
/10/1908 - Off Register redlined
>>>
*L 245.VA 2nd 3/10/1908 NWS Built new WHB, Iron
26/ 4/1932 NWS Into Workshops -
13/ 5/1932 NWS Out of Workshops (18 days)
/ 5/1932 - Modified AC Allce LT
.
Vehicle.............SV # Date...... Loc History............SV Notes
*L 246.VA 1st 14/ 4/1891 WHE Built new WH QA 91/3588
/ /1904 - Off Register L04/1599a, To be rebuilt
>>>
*L 246.VA 2nd 27/ 5/1905 NWS Built new WHB, Iron
/ 8/1911 - Modified Spiral Sprg/couplers
18/ 2/1932 NWS Into Workshops -
/ 2/1932 - Modified AC Allce LT; R1: 3/32
5/ 3/1932 NWS Out of Workshops (17 days)
*L 247.VA 1st 14/ 4/1891 WHE Built new WH QA 91/3588
/10/1908 - Off Register redlined
>>>
*L 247.VA 2nd 3/10/1908 NWS Built new WHB, Iron
15/ 4/1932 NWS Into Workshops -
3/ 5/1932 NWS Out of Workshops (19 days)
/ 5/1932 - Modified AC Allce LT
*L 248.VA 1st 14/ 4/1891 WHE Built new WH QA 91/3588
/11/1908 - Off Register redlined
>>>
*L 248.VA 2nd 7/11/1908 NWS Built new WHB, Iron
27/ 2/1932 NWS Into Workshops -
11/ 3/1932 NWS Out of Workshops (14 days)
/ 3/1932 - Modified AC Allce LT
*L 249.VA 1st 14/ 4/1891 WHE Built new WH QA 91/3588
/12/1909 - Off Register redlined
>>>
*L 249.VA 2nd 4/12/1909 NWS Built new WHB, Iron
8/ 3/1932 NWS Into Workshops -
/ 3/1932 - Modified AC Allce LT
23/ 3/1932 NWS Out of Workshops (16 days)
/ /1977 - Scrapped NR0977
*L 250.VA 1st 22/ 5/1891 WHE Built new WH QA 91/4687
/ 2/1910 - Off Register redlined
>>>
*L 250.VA 2nd 9/ 2/1910 NWS Built new WHB, Iron
18/ 5/1932 NWS Into Workshops -
/ 6/1932 - Modified AC Allce LT
20/ 6/1932 NWS Out of Workshops (34 days)
/ /1969 - Scrapped -
*L 251.VA 1st 22/ 5/1891 WHE Built new WH QA 91/4687
/11/1908 - Off Register redlined
>>>
*L 251.VA 2nd 7/11/1908 NWS Built new WHB, Iron
6/ 1/1932 NWS Into Workshops -
15/ 1/1932 NWS Out of Workshops (10 days)
/ 1/1932 - Modified Trans hook
/ 5/1932 - Modified Auto cpled
/ 5/1932 - Modified AC Allce LT
*L 252.VA 1st 22/ 5/1891 WHE Built new WH QA 91/4687
/10/1907 - Scrapped 07/8489a
>>>
.
Vehicle.............SV # Date...... Loc History............SV Notes
*L 252.VA 2nd 19/10/1907 NWS Built new WHB, Iron
3/ 5/1932 NWS Into Workshops -
/ 5/1932 - Modified AC Allce LT
24/ 5/1932 NWS Out of Workshops (22 days)
/11/1968 BDE Photo (partial view) #23.33A
*L 253.VA 1st 22/ 5/1891 WHE Built new WH QA 91/4687
/11/1909 - Off Register redlined
>>>
*L 253.VA 2nd 19/11/1909 NWS Built new WHB, Iron
/10/1931 - Modified Trans hook
/ 5/1932 - Modified AC Allce LT
*L 254.VA 1st 22/ 5/1891 WHE Built new WH QA 91/4687
/11/1908 - Off Register redlined
>>>
*L 254.VA 2nd 7/11/1908 NWS Built new WHB, Iron
8/ 1/1932 NWS Into Workshops -
/ 1/1932 - Modified Trans hook
21/ 1/1932 NWS Out of Workshops (14 days)
/ 5/1932 - Modified AC Allce LT
30/ 5/1984 - Off Register [CRS]
*L 255.VA 1st 1/ 6/1891 WHE Built new WH QA 91/4950
/ 2/1910 - Off Register redlined
>>>
*L 255.VA 2nd 9/ 2/1910 NWS Built new WHB, Iron
/10/1931 - Modified Trans hook
/ 5/1932 - Modified AC Allce LT
*L 256.VA 1st 1/ 6/1891 WHE Built new WH QA 91/4950
/ 2/1907 - Off Register redlined
>>>
*L 256.VA 2nd 23/ 2/1907 NWS Built new WHB, Iron
23/12/1931 NWS Into Workshops -
/ 1/1932 - Modified Trans hook
22/ 3/1932 NWS Out of Workshops (50 days)
/ 5/1932 - Modified AC Allce LT
24/10/1984 BOW Scrapped -
20/11/1984 - Off Register [CRS]
*L 257.VA 1st 1/ 6/1891 WHE Built new WH QA 91/4950
/ 2/1910 - Off Register redlined
>>>
*L 257.VA 2nd 9/ 2/1910 NWS Built new WHB, Iron
/11/1920 - Modified 3' whls, 4 1/2" journals
11/ 3/1932 NWS Into Workshops -
30/ 3/1932 NWS Out of Workshops (20 days)
/ 4/1932 - Modified AC Allce LT
/ /1969 - Scrapped -
*L 258.VA 1st 1/ 6/1891 WHE Built new WH QA 91/4950
/ 4/1910 - Off Register redlined
>>>
*L 258.VA 2nd 19/ 4/1910 NWS Built new WHB, Iron
/ 8/1931 - Modified Trans hook
/ 5/1932 - Modified AC Allce LT
.
Vehicle.............SV # Date...... Loc History............SV Notes
*L 259.VA 1st 23/ 6/1891 WHE Built new WH QA 91/5606
/ 6/1907 - Off Register redlined
>>>
*L 259.VA 2nd 22/ 6/1907 NWS Built new WHB, Iron
6/ 1/1932 NWS Into Workshops -
14/ 1/1932 NWS Out of Workshops (9 days)
/ 1/1932 - Modified Trans hook
/ 5/1932 - Modified AC Allce LT
*L 260.VA 1st 23/ 6/1891 WHE Built new WH QA 91/5606
/ /1904 - Off Register 04/1599a To be rebuilt
>>>
*L 260.VA 2nd 20/ 5/1905 NWS Built new WHB, Iron
3/ 5/1932 NWS Into Workshops -
18/ 5/1932 NWS Out of Workshops (16 days)
/ 5/1932 - Modified AC Allce LT
*L 261.VA 1st 23/ 6/1891 WHE Built new WH QA 91/5606
/ /1904 - Off Register L04/1599a. To be rebuilt
>>>
*L 261.VA 2nd 13/ 5/1905 NWS Built new WHB, Iron
/ 8/1931 - Modified Trans hook
/ 5/1932 - Modified AC Allce LT
*L 262.VA 1st 23/ 6/1891 WHE Built new WH QA 91/5606
3/10/1908 - Off Register redlined
>>>
*L 262.VA 2nd 3/10/1908 NWS Built new WHB, Iron
8/ 1/1932 NWS Into Workshops -
/ 1/1932 - Modified Trans hook
22/ 1/1932 NWS Out of Workshops (15 days)
/ 5/1932 - Modified AC Allce LT
circa 1978 - Off Register [v]
13/ 4/1978 RAA Sighting DH/RO
*L 263.VA 1st 23/ 6/1891 WHE Built new WH QA 91/5606
/ 6/1907 - Off Register redlined
>>>
*L 263.VA 2nd 22/ 6/1907 NWS Built new WHB, Iron
/10/1912 - Modified Spiral Spring/cplrs
15/ 1/1932 NWS Into Workshops -
/ 1/1932 - Modified Trans hook
26/ 1/1932 NWS Out of Workshops (12 days)
/ 5/1932 - Modified AC Allce LT
*L 264.VA 1st 23/ 6/1891 WHE Built new WH QA 91/5606
/ /1904 - Off Register L04/1599a. To be rebuilt
>>>
*L 264.VA 2nd 10/ 6/1905 NWS Built new WHB, Iron
/ 8/1911 - Modified Spiral Sprg/cplrs
28/ 1/1932 NWS Into Workshops -
/ 2/1932 - Modified AC Allce LT
25/ 2/1932 NWS Out of Workshops (29 days)
18/ 8/1981 - Off Register [CRS]
9/10/1981 BOW Scrapped [CRS]
.
Vehicle.............SV # Date...... Loc History............SV Notes
*L 265.VA 1st 22/ 7/1891 WHE Built new WH QA 91/6257
/ 5/1905 - Off Register redlined. To be rebuilt
>>>
*L 265.VA 2nd 13/ 5/1905 NWS Built new WHB, Iron
/12/1931 - Modified Trans hook
/ 5/1932 - Modified AC Allce LT
13/12/1935 NWS Into Workshops -
18/ 2/1936 NWS Out of Workshops (50 days)
*L 266.VA 1st 22/ 7/1891 WHE Built new WH QA 91/6257
/11/1908 - Off Register redlined
>>>
*L 266.VA 2nd 23/11/1908 NWS Built new WHB, Iron
15/ 1/1932 NWS Into Workshops -
/ 1/1932 - Modified Trans hook
25/ 1/1932 NWS Out of Workshops (11 days)
/ 5/1932 - Modified AC Allce LT
*L 267.VA 1st 22/ 7/1891 WHE Built new WH QA 91/6257
/ 5/1905 - Off Register redlined ... to be rebuilt
>>>
*L 267.VA 2nd 13/ 5/1905 NWS Built new WHB, Iron
22/ 7/1931 NWS Into Workshops -
/ 8/1931 - Modified Trans hook
27/ 8/1931 NWS Out of Workshops (37 days)
/ 5/1932 - Modified AC Allce LT
/ /1970 - Scrapped R104
*L 268.VA 1st 22/ 7/1891 WHE Built new WH QA 91/6257
17/ 3/1910 - Off Register redlined
>>>
*L 268.VA 2nd 17/ 3/1910 NWS Built new WHB, Iron
21/ 4/1932 NWS Into Workshops -
12/ 5/1932 NWS Out of Workshops (22 days)
/ 5/1932 - Modified AC Allce LT
/ /1971 - Scrapped R104
*L 269.VA 1st 10/ 8/1891 WHE Built new WH QA 91/6709
/10/1907 - Scrapped 07/8489a
>>>
*L 269.VA 2nd 19/10/1907 NWS Built new WHB, Iron
22/ 3/1932 NWS Into Workshops -
11/ 4/1932 NWS Out of Workshops (21 days)
/ 4/1932 - Modified AC Allce LT
30/11/1955 - Scrapped -
*L 270.VA 1st 10/ 8/1891 WHE Built new WH QA 91/6709
/11/1909 - Off Register redlined
>>>
*L 270.VA 2nd 11/11/1909 NWS Built new WHB, Iron
26/ 4/1932 NWS Into Workshops -
17/ 5/1932 NWS Out of Workshops (22 days)
/ 5/1932 - Modified AC Allce LT
*L 271.VA 1st 10/ 8/1891 WHE Built new WH QA 91/6709
17/ 3/1910 - Off Register redlined
>>>
.
Vehicle.............SV # Date...... Loc History............SV Notes
*L 271.VA 2nd 17/ 3/1910 NWS Built new WHB, Iron
/10/1931 - Modified Trans hook
/ 4/1932 - Modified AC Allce LT
15/10/1959 NWS Scrapped -
*L 272.VA 1st 10/ 8/1891 WHE Built new WH QA 91/6709
/10/1907 - Scrapped 07/8489a
>>>
*L 272.VA 2nd 19/10/1907 NWS Built new WHB, Iron
14/ 5/1932 NWS Into Workshops -
30/ 5/1932 NWS Out of Workshops (17 days)
/ 6/1932 - Modified AC Allce LT
/ /1969 - Scrapped -
*L 273.VA 1st 10/ 8/1891 WHE Built new WH QA 91/6709
17/ 2/1920 - Off Register redlined, Rebuilt ...
>>>
*L 273.VA 2nd 17/ 2/1920 NWS Built new WHB, Iron
/11/1931 - Modified Trans hook
/ 5/1932 - Modified AC Allce LT
28/ 7/1933 NWS Into Workshops -
23/ 9/1933 NWS Out of Workshops (50 days)
4/ 7/1980 BOW Sold (to) [CRS]: to Sims
13/ 8/1980 - Off Register [CRS]
*L 274.VA 1st 10/ 8/1891 WHE Built new WH QA 91/6709
/ /1904 - Off Register L04/1599a To be Rebuilt
>>>
*L 274.VA 2nd 10/ 6/1905 NWS Built new WHB, Iron
10/ 5/1932 NWS Into Workshops -
/ 6/1932 - Modified AC Allce LT
15/ 6/1932 NWS To LB 274.VA (37 days)
LB 274.VA - circa 1959 - To L 274.VA -
*L 274.VA 2nd / /1971 - Scrapped R104
*L 275.VA 1st 22/ 8/1891 WHE Built new WH QA 91/6939
/ 2/1907 - Off Register redlined
>>>
*L 275.VA 2nd 23/ 2/1907 NWS Built new WHB, Iron
29/ 3/1932 NWS Into Workshops -
15/ 4/1932 NWS Out of Workshops (18 days)
/ 4/1932 - Modified AC Allce LT
*L 276.VA 1st 22/ 8/1891 WHE Built new WH QA 91/6939
circa 1905 - Off Register redlined, to be rebuilt
>>>
*L 276.VA 2nd 10/ 6/1905 NWS Built new WHB, Iron
3/ 5/1932 NWS Into Workshops -
/ 5/1932 - Modified AC Allce LT
21/ 5/1932 NWS Out of Workshops (19 days)
/ /1971 - Scrapped R104
*L 277.VA 1st 22/ 8/1891 WHE Built new WH QA 91/6939
/11/1909 - Off Register redlined
>>>
.
Vehicle.............SV # Date...... Loc History............SV Notes
*L 277.VA 2nd 11/11/1909 NWS Built new WHB, Iron
15/12/1931 NWS Into Workshops -
6/ 1/1932 NWS Out of Workshops (23 days)
/ 1/1932 - Modified Trans hook
/ 5/1932 - Modified AC Allce LT
6/ 6/1957 ING Destroyed 57/7147
*L 278.VA 1st 22/ 8/1891 WHE Built new WH QA 91/6939
/ 4/1910 - Off Register redlined
>>>
*L 278.VA 2nd 19/ 4/1910 NWS Built new WHB, Iron
9/12/1931 NWS Into Workshops -
14/ 1/1932 NWS Out of Workshops (37 days)
/ 1/1932 - Modified Trans hook
/ 4/1932 - Modified AC Allce LT
*L 279.VA 1st 27/ 8/1891 WHE Built new WH QA 91/7079
9/ 4/1910 - Off Register redlined
>>>
*L 279.VA 2nd 9/ 4/1910 NWS Built new WHB, Iron
9/ 1/1932 NWS Into Workshops -
17/ 2/1932 NWS Out of Workshops (40 days)
/ 2/1932 - Modified AC Allce LT
*L 280.VA 1st 27/ 8/1891 WHE Built new WH QA 91/7079
/ 2/1907 - Off Register redlined
>>>
*L 280.VA 2nd 23/ 2/1907 NWS Built new WHB, Iron
12/ 4/1932 NWS Into Workshops -
/ 4/1932 - Modified AC Allce LT
28/ 4/1932 NWS Out of Workshops (17 days)
*L 281.VA 1st 27/ 8/1891 WHE Built new WH QA 91/7079
29/11/1913 - Off Register redlined
>>>
*L 281.VA 2nd 29/11/1913 NWS Built new WHB, Iron
8/ 3/1932 NWS Into Workshops -
/ 3/1932 - Modified AC Allce LT
23/ 3/1932 NWS Out of Workshops (16 days)
*L 282.VA 1st 27/ 8/1891 WHE Built new WH QA 91/7079
17/ 3/1910 - Off Register redlined
>>>
*L 282.VA 2nd 17/ 3/1910 NWS Built new WHB, Iron
26/ 4/1932 NWS Into Workshops -
16/ 5/1932 NWS Out of Workshops (21 days)
/ 5/1932 - Modified AC Allce LT
*L 283.VA - 8/ 2/1902 NWS Built new WHB
30/ 3/1932 NWS Into Workshops -
11/ 4/1932 NWS Out of Workshops (13 days)
/ 4/1932 - Modified AC Allce LT
.
Vehicle.............SV # Date...... Loc History............SV Notes
*L 284.VA - 8/ 3/1902 NWS Built new WHB
31/ 3/1931 NWS Into Workshops -
4/ 6/1931 NWS Out of Workshops (50 days)
6/ 4/1932 NWS Into Workshops -
19/ 4/1932 NWS Out of Workshops (14 days)
/ 4/1932 - Modified AC Allce LT
10/ 3/1960 NWS Scrapped -
*L 285.VA - 8/ 3/1902 NWS Built new WHB
/11/1931 - Modified Trans hook
/ 5/1932 - Modified AC Allce LT
*L 286.VA - 8/ 3/1902 NWS Built new WHB
/12/1931 - Modified Trans hook
/ 5/1932 - Modified AC Allce LT
12/ 1/1961 NWS Scrapped -
*L 287.VA - 8/ 3/1902 NWS Built new WHB
/12/1931 - Modified Trans hook
/ 5/1932 - Modified AC Allce LT
15/ 1/1981 - Off Register [CRS]
11/ 2/1981 BOW Scrapped [CRS]
*L 288.VA - 8/ 3/1902 NWS Built new WHB
1/ 3/1932 NWS Into Workshops -
18/ 3/1932 NWS Out of Workshops (18 days)
/ 3/1932 - Modified AC Allce LT
*L 289.VA - 8/ 3/1902 NWS Built new WHB
24/11/1931 NWS Into Workshops -
17/12/1931 NWS Out of Workshops (24 days)
/12/1931 - Modified Trans hook
/ 5/1932 - Modified AC Allce LT
*L 290.VA - 8/ 3/1902 NWS Built new WHB
28/ 1/1932 NWS Into Workshops -
/ 2/1932 - Modified AC Allce LT
22/ 2/1932 NWS Out of Workshops (26 days)
*L 291.VA - 8/ 3/1902 NWS Built new WHB
/ 8/1925 - Modified 4 1/2" journals
22/ 1/1932 NWS Into Workshops -
6/ 2/1932 NWS Out of Workshops (16 days)
/ 2/1932 - Modified AC Allce LT
*L 292.VA - 8/ 3/1902 NWS Built new WHB
6/ 4/1932 NWS Into Workshops -
19/ 4/1932 NWS Out of Workshops (14 days)
/ 4/1932 - Modified AC Allce LT
*L 293.VA - 24/ 5/1902 NWS Built new WHB
/10/1931 - Modified Trans hook
/ 5/1932 - Modified AC Allce LT
11/ 5/1983 - Off Register [CRS]
11/ 1/1984 BLO Scrapped [CRS]
.
Vehicle.............SV # Date...... Loc History............SV Notes
*L 294.VA - 8/ 7/1902 NWS Built new WHB
/ 7/1932 - Modified AC Allce LT
6/ 7/1959 NWS Scrapped -
*L 295.VA - 8/ 7/1902 NWS Built new WHB
9/ 2/1931 NWS Into Workshops -
20/ 5/1931 NWS Out of Workshops (50 days)
/10/1931 - Modified Trans hook
/ 5/1932 - Modified AC Allce LT
12/ 1/1961 NWS Scrapped -
*L 296.VA - 8/ 7/1902 NWS Built new WHB
23/ 2/1932 NWS Into Workshops -
9/ 3/1932 NWS Out of Workshops (16 days)
/ 3/1932 - Modified AC Allce LT
25/ 2/1936 NWS Into Workshops -
24/ 7/1936 NWS Out of Workshops (50 days)
/ /1970 - Scrapped -
*L 297.VA - 8/ 7/1902 NWS Built new WHB
26/ 4/1932 NWS Into Workshops -
15/ 7/1932 NWS Out of Workshops (50 days)
/ 7/1932 - Modified Auto cpled; R1: No data
3/ 3/1960 SER Scrapped -
*L 298.VA - 11/ 7/1902 NWS Built new WHB
28/ 1/1932 NWS Into Workshops -
/ 2/1932 - Modified AC Allce LT
23/ 2/1932 NWS Out of Workshops (27 days)
6/12/1935 NWS Into Workshops -
28/ 2/1936 NWS Out of Workshops (50 days)
*L 299.VA - 11/ 7/1902 NWS Built new WHB
/11/1931 - Modified Trans hook
/ 6/1932 - Modified AC Allce LT
6/ 7/1959 NWS Scrapped -
*L 300.VA - 11/ 7/1902 NWS Built new WHB
21/ 5/1932 NWS Into Workshops -
/ 6/1932 - Modified AC Allce LT
16/ 6/1932 NWS To LB 300.VA (27 days)
LB 300.VA - 6/10/1936 NWS Into Workshops (with LB 1054)
3/11/1936 NWS Out of Workshops (29 days)
circa 1954 - To L 300.VA -
*L 300.VA - / /1971 - Scrapped DD0471
*L 301.VA - 11/ 7/1902 NWS Built new WHB
15/ 4/1932 NWS Into Workshops -
12/ 5/1932 NWS Out of Workshops (28 days)
/ 5/1932 - Modified AC Allce LT
*L 302.VA - 12/ 7/1902 NWS Built new WHB
21/10/1930 NWS Into Workshops -
8/12/1930 NWS Out of Workshops (49 days)
23/ 4/1932 NWS Into Workshops -
7/ 5/1932 NWS Out of Workshops (15 days)
/ 5/1932 - Modified AC Allce LT
.
Vehicle.............SV # Date...... Loc History............SV Notes
*L 303.VA - 12/ 7/1902 NWS Built new WHB
/11/1931 - Modified Trans hook
/ 5/1932 - Modified AC Allce LT
circa 1978 - Off Register [v]
13/ 4/1978 RAA Sighting DH/RO
*L 304.VA - 19/ 7/1902 NWS Built new WHB
26/ 4/1932 NWS Into Workshops -
11/ 5/1932 NWS Out of Workshops (16 days)
/ 5/1932 - Modified AC Allce LT
10/ 3/1960 NWS Scrapped -
*L 305.VA - 19/ 7/1902 NWS Built new WHB
21/ 4/1932 NWS Into Workshops -
12/ 5/1932 NWS Out of Workshops (22 days)
/ 5/1932 - Modified AC Allce LT
*L 306.VA - 19/ 7/1902 NWS Built new WHB
29/ 3/1932 NWS Into Workshops -
11/ 4/1932 NWS Out of Workshops (14 days)
/ 4/1932 - Modified AC Allce LT
12/ 1/1961 NWS Scrapped -
*L 307.VA - 19/ 7/1902 NWS Built new WHB
19/ 3/1932 NWS Into Workshops -
/ 3/1932 - Modified AC Allce LT
5/ 4/1932 NWS Out of Workshops (18 days)
*L 308.VA - 22/ 7/1902 NWS Built new WHB
21/ 5/1932 NWS Into Workshops -
/ 6/1932 - Modified AC Allce LT
15/ 6/1932 NWS To LB 308.VA (26 days)
*L 309.VA - 22/ 7/1902 NWS Built new WHB
28/11/1916 - Modified 4" journals
21/ 4/1932 NWS Into Workshops -
/ 5/1932 - Modified AC Allce LT
26/ 5/1932 NWS Out of Workshops (36 days)
*L 310.VA - 22/ 7/1902 NWS Built new WHB
/10/1931 - Modified Trans hook
/ 5/1932 - Modified AC Allce LT
/ /1971 - Scrapped DD1/72; DD8/72
*L 311.VA - 22/ 7/1902 NWS Built new WHB
21/ 4/1932 NWS Into Workshops -
5/ 5/1932 NWS Out of Workshops (15 days)
/ 5/1932 - Modified AC Allce LT
*L 312.VA - 26/ 7/1902 NWS Built new WHB
26/ 4/1932 NWS Into Workshops -
7/ 5/1932 NWS Out of Workshops (12 days)
/ 5/1932 - Modified AC Allce LT
/ /1971 - Scrapped R104
.
Vehicle.............SV # Date...... Loc History............SV Notes
*L 313.VA - 26/ 7/1902 NWS Built new WHB
circa 1905 - Note "? Pipe"
/ 1/1920 - Modified 4 1/2" journals, 8-10t
/ 9/1931 - Modified Trans hook
/ 5/1932 - Modified AC Allce LT
*L 314.VA - 26/ 7/1902 NWS Built new WHB
28/ 1/1932 NWS Into Workshops -
/ 2/1932 - Modified AC Allce LT
24/ 2/1932 NWS Out of Workshops (28 days)
*L 315.VA - 26/ 7/1902 NWS Built new WHB
27/ 2/1932 NWS Into Workshops -
17/ 3/1932 NWS Out of Workshops (20 days)
/ 3/1932 - Modified AC Allce LT
/ /1976 - Scrapped RSN11/76
*L 316.VA - 26/ 7/1902 NWS Built new WHB
/ 7/1909 - Modified 3'6" cradle (Spiral Sprg)
5/ 8/1931 NWS Into Workshops -
8/ 9/1931 NWS Out of Workshops (35 days)
/ 9/1931 - Modified Trans hook
/ 5/1932 - Modified AC Allce LT
*L 317.VA - 2/ 8/1902 NWS Built new WHB
21/ 4/1932 NWS Into Workshops -
/ 6/1932 - Modified AC Allce LT
15/ 6/1932 NWS To LB 317.VA (50 days)
*L 318.VA - 2/ 8/1902 NWS Built new WHB
26/ 4/1932 NWS Into Workshops -
18/ 7/1932 NWS Out of Workshops (50 days)
/ 7/1932 - Modified Auto cpled; R1: No data
*L 319.VA - 2/ 8/1902 NWS Built new WHB
14/ 5/1932 NWS Into Workshops -
27/ 6/1932 NWS Out of Workshops (45 days)
/ 7/1932 - Modified AC Allce LT
*L 320.VA - 2/ 8/1902 NWS Built new WHB
29/ 3/1932 NWS Into Workshops -
13/ 4/1932 NWS Out of Workshops (16 days)
/ 4/1932 - Modified AC Allce LT
*L 321.VA - 2/ 8/1902 NWS Built new WHB
11/10/1916 - Modified Journals altered
19/ 2/1932 NWS Into Workshops -
9/ 3/1932 NWS Out of Workshops (20 days)
/ 3/1932 - Modified AC Allce LT
*L 322.VA - 2/ 8/1902 NWS Built new WHB
22/ 1/1932 NWS Into Workshops -
6/ 2/1932 NWS Out of Workshops (16 days)
/ 2/1932 - Modified AC Allce LT
.
Vehicle.............SV # Date...... Loc History............SV Notes
*L 323.VA - 2/ 8/1902 NWS Built new WHB
/ 6/1922 - Modified 4" journals
21/ 4/1932 NWS Into Workshops -
5/ 5/1932 NWS Out of Workshops (15 days)
/ 5/1932 - Modified AC Allce LT
*L 324.VA - 2/ 8/1902 NWS Built new WHB
14/ 5/1932 NWS Into Workshops -
30/ 5/1932 NWS Out of Workshops (17 days)
/ 6/1932 - Modified AC Allce LT
/ /1969 - Scrapped -
*L 325.VA - 7/ 8/1902 NWS Built new WHB
27/ 2/1932 NWS Into Workshops -
11/ 3/1932 NWS Out of Workshops (14 days)
/ 3/1932 - Modified AC Allce LT
/ /1970 - Scrapped R104
*L 326.VA - 7/ 8/1902 NWS Built new WHB
23/ 2/1932 NWS Into Workshops -
11/ 3/1932 NWS Out of Workshops (18 days)
/ 3/1932 - Modified AC Allce LT
*L 327.VA - 7/ 8/1902 NWS Built new WHB
8/ 4/1932 NWS Into Workshops -
/ 4/1932 - Modified AC Allce LT
22/ 4/1932 NWS Out of Workshops (15 days)
11/ 9/1936 NWS Into Workshops -
27/10/1936 NWS Out of Workshops (47 days)
*L 328.VA - 7/ 8/1902 NWS Built new WHB
15/ 3/1932 NWS Into Workshops -
/ 3/1932 - Modified AC Allce LT
31/ 3/1932 NWS Out of Workshops (17 days)
15/ 1/1981 - Off Register [CRS]
16/ 2/1981 BOW Scrapped [CRS]
*L 329.VA - 7/ 8/1902 NWS Built new WHB
19/ 3/1932 NWS Into Workshops -
/ 3/1932 - Modified AC Allce LT
5/ 4/1932 NWS Out of Workshops (18 days)
12/ 1/1961 NWS Scrapped -
*L 330.VA - 9/ 8/1902 NWS Built new WHB
27/ 7/1931 NWS Into Workshops -
2/ 9/1931 NWS Out of Workshops (38 days)
/ 9/1931 - Modified Trans hook
/ 4/1932 - Modified AC Allce LT
*L 331.VA - 9/ 8/1902 NWS Built new WHB
23/12/1931 NWS Into Workshops -
12/ 1/1932 NWS Out of Workshops (21 days)
/ 1/1932 - Modified Trans hook
/ 6/1932 - Modified AC Allce LT
6/ 7/1959 NWS Scrapped -
.
Vehicle.............SV # Date...... Loc History............SV Notes
*L 332.VA - 9/ 8/1902 NWS Built new WHB
/ 5/1922 - Modified 4" journals; 8t - 10t
6/ 4/1932 NWS Into Workshops -
19/ 4/1932 NWS Out of Workshops (14 days)
/ 4/1932 - Modified AC Allce LT
*L 333.VA - 9/ 8/1902 NWS Built new WHB
19/ 3/1932 NWS Into Workshops -
11/ 4/1932 NWS Out of Workshops (24 days)
/ 4/1932 - Modified AC Allce LT
15/ 1/1981 - Off Register [CRS]
20/ 2/1981 BOW Scrapped [CRS]
*L 334.VA - 23/ 8/1902 NWS Built new WHB
10/ 5/1932 NWS Into Workshops -
/ 6/1932 - Modified Auto cpled
15/ 6/1932 NWS To LB 334.VA (37 days); R1: No data
LB 334.VA - circa 1959 - To L 334.VA -
*L 334.VA - / /1975 - Scrapped RSN5/75
*L 335.VA - 23/ 8/1902 NWS Built new WHB
18/ 2/1932 NWS Into Workshops -
5/ 3/1932 NWS Out of Workshops (17 days)
/ 3/1932 - Modified AC Allce LT
*L 336.VA - 23/ 8/1902 NWS Built new WHB
/11/1931 - Modified Trans hook
/ 5/1932 - Modified AC Allce LT
*L 337.VA - 23/ 8/1902 NWS Built new WHB
19/ 3/1932 NWS Into Workshops -
/ 3/1932 - Modified AC Allce LT
5/ 4/1932 NWS Out of Workshops (18 days)
/ /1970 - Scrapped -
*L 338.VA - 23/ 8/1902 NWS Built new WHB
21/ 5/1932 NWS Into Workshops -
/ 7/1932 - Modified AC Allce LT
7/ 7/1932 NWS To LB 338.VA (48 days)
LB 338.VA - 11/ 9/1954 NMW To L 338.VA (W/E)
*L 339.VA - 23/ 8/1902 NWS Built new WHB
3/ 5/1932 NWS Into Workshops -
/ 5/1932 - Modified AC Allce LT
20/ 5/1932 NWS Out of Workshops (18 days)
17/ 1/1961 NWS Scrapped -
*L 340.VA - 23/ 8/1902 NWS Built new WHB
/ 4/1932 - Modified AC Allce LT
28/ 4/1960 - Scrapped -
*L 341.VA - 23/ 8/1902 NWS Built new WHB
26/ 4/1932 NWS Into Workshops -
17/ 5/1932 NWS Out of Workshops (22 days)
/ 5/1932 - Modified AC Allce LT
/ /1970 - Scrapped R104
.
Vehicle.............SV # Date...... Loc History............SV Notes
*L 342.VA - 23/ 8/1902 NWS Built new WHB
11/ 3/1932 NWS Into Workshops -
31/ 3/1932 NWS Out of Workshops (21 days)
/ 4/1932 - Modified AC Allce LT
12/ 1/1961 NWS Scrapped -
*L 343.VA - 5/ 9/1902 NWS Built new WHB
24/ 4/1931 NWS Into Workshops -
29/ 6/1931 NWS Out of Workshops (50 days)
18/ 1/1932 NWS Into Workshops -
2/ 2/1932 NWS Out of Workshops (16 days)
/ 2/1932 - Modified Trans hook
/ 4/1932 - Modified AC Allce LT
*L 344.VA - 5/ 9/1902 NWS Built new WHB
18/12/1931 NWS Into Workshops -
/ 1/1932 - Modified Trans hook
23/ 1/1932 NWS Out of Workshops (37 days)
/ 5/1932 - Modified AC Allce LT
*L 345.VA - 5/ 9/1902 NWS Built new WHB
15/ 3/1932 NWS Into Workshops -
31/ 3/1932 NWS Out of Workshops (17 days)
/ 4/1932 - Modified AC Allce LT
*L 346.VA - 5/ 9/1902 NWS Built new WHB
26/ 4/1932 NWS Into Workshops -
16/ 5/1932 NWS Out of Workshops (21 days)
/ 5/1932 - Modified AC Allce LT
*L 347.VA - 5/ 9/1902 NWS Built new WHB
/ 1/1920 - Modified 4" journals; 8t - 10t
14/ 1/1931 NWS Into Workshops -
5/ 2/1932 NWS Out of Workshops (23 days)
/ 2/1932 - Modified Trans hook
/ 5/1932 - Modified AC Allce LT
*L 348.VA - 5/ 9/1902 NWS Built new WHB
3/ 6/1932 NWS Into Workshops -
/ 6/1932 - Modified AC Allce LT
23/ 6/1932 NWS To LB 348.VA (21 days)
*L 349.VA - 5/ 9/1902 NWS Built new WHB
22/ 3/1932 NWS Into Workshops -
11/ 4/1932 NWS Out of Workshops (21 days)
/ 4/1932 - Modified AC Allce LT
12/ 1/1961 NWS Scrapped -
*L 350.VA - 5/ 9/1902 NWS Built new WHB
1/12/1931 NWS Into Workshops -
6/ 1/1932 NWS Out of Workshops (37 days)
/ 1/1932 - Modified Trans hook
/ 5/1932 - Modified AC Allce LT
/ /1970 - Scrapped -
.
Vehicle.............SV # Date...... Loc History............SV Notes
*L 351.VA - 20/ 9/1902 NWS Built new WHB
21/ 5/1932 NWS Into Workshops -
/ 6/1932 - Modified AC Allce LT
23/ 6/1932 NWS To LB 351.VA (34 days)
*L 352.VA - 20/ 9/1902 NWS Built new WHB
/10/1913 - Modified Spiral Sprg/couplers
/ 6/1922 - Modified 4 1/2" journals
15/12/1931 NWS Into Workshops -
5/ 1/1932 NWS Out of Workshops (22 days)
/ 1/1932 - Modified Trans hook
/ 5/1932 - Modified AC Allce LT
*L 353.VA - 20/ 9/1902 NWS Built new WHB
18/ 5/1932 NWS Into Workshops -
/ 7/1932 - Modified Auto cpled; R1: No data
21/ 7/1932 NWS Out of Workshops (50 days)
*L 354.VA - 20/ 9/1902 NWS Built new WHB
/11/1919 - Modified 4 1/2" journals; 8t - 10t
1/ 3/1932 NWS Into Workshops -
17/ 3/1932 NWS Out of Workshops (17 days)
/ 3/1932 - Modified AC Allce LT
/ /1969 - Scrapped -
*L 355.VA - 20/ 9/1902 NWS Built new WHB
/12/1931 - Modified Trans hook
/ 5/1932 - Modified AC Allce LT
*L 356.VA - 20/ 9/1902 NWS Built new WHB
/11/1931 - Modified Trans hook
/ 5/1932 - Modified AC Allce LT
*L 357.VA - 27/ 9/1902 NWS Built new WHB
23/ 2/1932 NWS Into Workshops -
15/ 3/1932 NWS Out of Workshops (22 days)
/ 3/1932 - Modified AC Allce LT
*L 358.VA - 27/ 9/1902 NWS Built new WHB
9/ 2/1932 NWS Into Workshops -
1/ 3/1932 NWS Out of Workshops (22 days)
/ 3/1932 - Modified Auto cpled
*L 359.VA - 27/ 9/1902 NWS Built new WHB
15/ 4/1932 NWS Into Workshops -
/ 7/1932 - Modified AC Allce LT
7/ 7/1932 NWS To LB 359.VA (50 days)
LB 359.VA - 3/11/1955 NWS Scrapped 55/13426
*L 360.VA - 27/ 9/1902 NWS Built new WHB
30/ 1/1931 NWS Into Workshops -
17/ 8/1931 NWS Out of Workshops (50 days)
/ 8/1931 - Modified Trans hook
/ 5/1932 - Modified AC Allce LT
.
Vehicle.............SV # Date...... Loc History............SV Notes
*L 361.VA - 27/ 9/1902 NWS Built new WHB
22/ 3/1932 NWS Into Workshops -
11/ 4/1932 NWS Out of Workshops (21 days)
/ 4/1932 - Modified AC Allce LT
*L 362.VA - 27/ 9/1902 NWS Built new WHB
22/ 3/1932 NWS Into Workshops -
11/ 4/1932 NWS Out of Workshops (21 days)
/ 4/1932 - Modified AC Allce LT
*L 363.VA - 27/ 9/1902 NWS Built new WHB
26/ 6/1931 NWS Into Workshops -
/ 8/1931 - Modified Trans hook
26/ 8/1931 NWS Out of Workshops (50 days)
/ 5/1932 - Modified AC Allce LT
*L 364.VA - 27/ 9/1902 NWS Built new WHB
8/ 3/1932 NWS Into Workshops -
/ 3/1932 - Modified AC Allce LT
23/ 3/1932 NWS Out of Workshops (16 days)
*L 365.VA - 27/ 9/1902 NWS Built new WHB
8/ 3/1932 NWS Into Workshops -
1/ 4/1932 NWS Out of Workshops (25 days)
/ 4/1932 - Modified AC Allce LT
*L 366.VA - 27/ 9/1902 NWS Built new WHB
5/ 8/1931 NWS Into Workshops -
16/ 9/1931 NWS Out of Workshops (43 days)
/ 9/1931 - Modified Trans hook
/ 5/1932 - Modified AC Allce LT
*L 367.VA - 27/ 9/1902 NWS Built new WHB
3/ 5/1932 NWS Into Workshops -
/ 5/1932 - Modified AC Allce LT
24/ 5/1932 NWS Out of Workshops (22 days)
/ /1969 - Scrapped -
*L 368.VA - 27/ 9/1902 NWS Built new WHB
11/12/1931 NWS Into Workshops -
4/ 1/1932 NWS Out of Workshops (25 days)
/ 1/1932 - Modified Trans hook
/ 5/1932 - Modified AC Allce LT
*L 369.VA - 27/ 9/1902 NWS Built new WHB
1/ 3/1932 NWS Into Workshops -
11/ 3/1932 NWS Out of Workshops (11 days)
/ 3/1932 - Modified AC Allce LT
*L 370.VA - 1/10/1902 NWS Built new WHB
1/ 3/1932 NWS Into Workshops -
17/ 3/1932 NWS Out of Workshops (17 days)
/ 3/1932 - Modified AC Allce LT
.
Vehicle.............SV # Date...... Loc History............SV Notes
*L 371.VA - 1/10/1902 NWS Built new WHB
29/ 3/1932 NWS Into Workshops -
13/ 4/1932 NWS Out of Workshops (16 days)
/ 4/1932 - Modified AC Allce LT
17/ 1/1961 NWS Scrapped -
*L 372.VA - 1/10/1902 NWS Built new WHB
22/ 3/1932 NWS Into Workshops -
11/ 4/1932 NWS Out of Workshops (21 days)
/ 4/1932 - Modified AC Allce LT
*L 373.VA - 1/10/1902 NWS Built new WHB
/10/1931 - Modified Trans hook
/ 5/1932 - Modified AC Allce LT
6/ 7/1959 NWS Scrapped -
*L 374.VA - 1/10/1902 NWS Built new WHB
14/ 1/1932 NWS Into Workshops -
/ 2/1932 - Modified AC Allce LT
23/ 2/1932 NWS Out of Workshops (41 days)
6/ 7/1959 NWS Scrapped -
*L 375.VA - 1/10/1902 NWS Built new WHB
15/ 4/1932 NWS Into Workshops -
7/ 5/1932 NWS Out of Workshops (23 days)
/ 5/1932 - Modified AC Allce LT
6/ 7/1959 NWS Scrapped -
*L 376.VA - 1/10/1902 NWS Built new WHB
/11/1931 - Modified Trans hook
/ 5/1932 - Modified AC Allce LT
*L 377.VA - 1/10/1902 NWS Built new WHB
28/ 1/1932 NWS Into Workshops -
/ 2/1932 - Modified AC Allce LT
24/ 2/1932 NWS Out of Workshops (28 days)
15/ 5/1936 NWS Into Workshops -
28/ 7/1936 NWS Out of Workshops (50 days)
*L 378.VA - 1/10/1902 NWS Built new WHB
29/ 1/1932 NWS Into Workshops -
19/ 2/1932 NWS Out of Workshops (22 days)
/ 2/1932 - Modified AC Allce LT
*L 379.VA - 1/10/1902 NWS Built new WHB
26/ 4/1932 NWS Into Workshops -
15/ 7/1932 NWS Out of Workshops (50 days)
/ 7/1932 - Modified Auto cpled, R1: No data
/ /1971 - Scrapped R104
*L 380.VA - 1/10/1902 NWS Built new WHB
/ 2/1921 - Modified 4" journals; 8 - 10t
29/ 1/1932 NWS Into Workshops -
19/ 2/1932 NWS Out of Workshops (22 days)
/ 2/1932 - Modified AC Allce LT
.
Vehicle.............SV # Date...... Loc History............SV Notes
*L 381.VA - 1/10/1902 NWS Built new WHB
/ 7/1932 - Modified AC Allce LT
*L 382.VA - 1/10/1902 NWS Built new WHB
24/ 5/1932 NWS Into Workshops -
/ 6/1932 - Modified AC Allce LT
16/ 6/1932 NWS To LB 382.VA (24 days)
*L 383.VA - 26/ 6/1903 NWS Built new WHB
/ 7/1909 - Modified 3'6" cradle
19/ 3/1932 NWS Into Workshops -
/ 3/1932 - Modified AC Allce LT
5/ 4/1932 NWS Out of Workshops (18 days)
6/ 7/1955 - Scrapped -
*L 384.VA - 26/ 6/1903 NWS Built new WHB
12/ 4/1932 NWS Into Workshops -
/ 4/1932 - Modified AC Allce LT
28/ 4/1932 NWS Out of Workshops (17 days)
17/ 1/1961 NWS Scrapped -
*L 385.VA - 26/ 6/1903 NWS Built new WHB
9/ 2/1932 NWS Into Workshops -
/ 2/1932 - Modified AC Allce LT
25/ 2/1932 NWS Out of Workshops (17 days)
*L 386.VA - 26/ 6/1903 NWS Built new WHB
8/ 1/1932 NWS Into Workshops -
/ 1/1932 - Modified Trans hook
22/ 1/1932 NWS Out of Workshops (15 days)
/ 5/1932 - Modified AC Allce LT
*L 387.VA - 26/ 6/1903 NWS Built new WHB
9/12/1931 NWS Into Workshops -
/12/1931 - Modified Trans hook
22/12/1931 NWS Out of Workshops (14 days)
/ 5/1932 - Modified AC Allce LT
*L 388.VA - 26/ 6/1903 NWS Built new WHB
22/ 3/1932 NWS Into Workshops -
11/ 4/1932 NWS Out of Workshops (21 days)
/ 4/1932 - Modified AC Allce LT
*L 389.VA - 26/ 6/1903 NWS Built new WHB
21/ 5/1932 NWS Into Workshops -
/ 6/1932 - Modified AC Allce LT
16/ 6/1932 NWS To LB 389.VA (27 days)
*L 390.VA - 26/ 6/1903 NWS Built new WHB
5/ 3/1932 NWS Into Workshops -
/ 3/1932 - Modified AC Allce LT
21/ 3/1932 NWS Out of Workshops (17 days)
/ /1977 - Scrapped NR1077
.
Vehicle.............SV # Date...... Loc History............SV Notes
*L 391.VA - 26/ 6/1903 NWS Built new WHB
/ 9/1911 - Modified Spiral Sprg/couplers
/ 8/1917 - Modified 4 1/2" journals
14/ 5/1932 NWS Into Workshops -
/ 5/1932 - Modified AC Allce LT
27/ 5/1932 NWS Out of Workshops (14 days)
27/ 5/1970 SRD Scrapped -
*L 392.VA - 26/ 6/1903 NWS Built new WHB
21/ 4/1932 NWS Into Workshops -
5/ 5/1932 NWS Out of Workshops (15 days)
/ 5/1932 - Modified AC Allce LT
*L 393.VA - 26/ 6/1903 NWS Built new WHB
8/ 3/1932 NWS Into Workshops -
1/ 4/1932 NWS Out of Workshops (25 days)
/ 4/1932 - Modified AC Allce LT
*L 394.VA - 26/ 6/1903 NWS Built new WHB
8/ 4/1932 NWS Into Workshops -
/ 4/1932 - Modified AC Allce LT
21/ 4/1932 NWS Out of Workshops (14 days)
*L 395.VA - 26/ 6/1903 NWS Built new WHB
10/ 5/1932 NWS Into Workshops -
/ 5/1932 - Modified AC Allce LT
24/ 5/1932 NWS Out of Workshops (15 days)
*L 396.VA - 26/ 6/1903 NWS Built new WHB
14/ 1/1932 NWS Into Workshops -
/ 1/1932 - Modified Trans hook
27/ 1/1932 NWS Out of Workshops (14 days)
/ 4/1932 - Modified AC Allce LT
/ /1975 - Scrapped RSN7/75
*L 397.VA - 26/ 6/1903 NWS Built new WHB
/ 7/1932 - Modified AC Allce LT
24/ 3/1970 SRD Scrapped -
*L 398.VA - 26/ 6/1903 NWS Built new WHB
22/ 1/1932 NWS Into Workshops -
1/ 3/1932 NWS Out of Workshops (40 days)
/ 3/1932 - Modified AC Allce LT
circa 1978 - Off Register [v]
13/ 4/1978 RAA Sighting DH/RO
*L 399.VA - 26/ 6/1903 NWS Built new WHB
10/ 5/1932 NWS Into Workshops -
2/ 6/1932 NWS Out of Workshops (24 days)
/ 6/1932 - Modified AC Allce LT
*L 400.VA - 26/ 6/1903 NWS Built new WHB
/ 6/1911 - Modified Spiral Sprg/couplers
/10/1931 - Modified Trans hook
/ 5/1932 - Modified AC Allce LT
.
Vehicle.............SV # Date...... Loc History............SV Notes
*L 401.VA - 26/ 6/1903 NWS Built new WHB
/12/1931 - Modified Trans hook
/ 5/1932 - Modified AC Allce LT
7/11/1980 - Off Register [CRS]
2/ 2/1981 BOW Scrapped [CRS]
*L 402.VA - 26/ 6/1903 NWS Built new WHB
19/ 3/1932 NWS Into Workshops -
15/ 4/1932 NWS Out of Workshops (28 days)
/ 4/1932 - Modified AC Allce LT
*L 403.VA - 9/ 9/1905 NWS Built new WH 05/8877a, Iron
19/ 5/1932 NWS Into Workshops -
/ 6/1932 - Modified AC Allce LT
23/ 6/1932 NWS To LB 403.VA (36 days), R1: No data
*L 404.VA - 9/ 9/1905 NWS Built new WH 05/8877a, Iron
22/ 1/1932 NWS Into Workshops -
6/ 2/1932 NWS Out of Workshops (16 days)
/ 2/1932 - Modified AC Allce LT
*L 405.VA - 9/ 9/1905 NWS Built new WH 05/8877a, Iron
17/11/1931 NWS Into Workshops -
30/11/1931 NWS Out of Workshops (14 days)
/12/1931 - Modified Trans hook
/ 5/1932 - Modified AC Allce LT
*L 406.VA - 16/ 9/1905 NWS Built new WH 05/9251a, Iron
30/ 3/1932 NWS Into Workshops -
13/ 4/1932 NWS Out of Workshops (15 days)
/ 4/1932 - Modified AC Allce LT
30/ 9/1932 NWS Into Workshops -
22/11/1933 NWS Out of Workshops (50 days)
*L 407.VA - 16/ 9/1905 NWS Built new WH 05/9251a, Iron
20/11/1931 NWS Into Workshops -
16/12/1931 NWS Out of Workshops (27 days)
/12/1931 - Modified Trans hook
/ 4/1932 - Modified AC Allce LT
/ /1976 - Scrapped RSN11/76
*L 408.VA - 16/ 9/1905 NWS Built new WH 05/9251a, Iron
21/ 5/1932 NWS Into Workshops -
/ 6/1932 - Modified AC Allce LT
15/ 6/1932 NWS To LB 408.VA (26 days)
LB 408.VA - 4/ 9/1954 BAW To L 408.VA (W/E)
*L 409.VA - 16/ 9/1905 NWS Built new WH 05/9251a, Iron
6/ 4/1932 NWS Into Workshops -
19/ 4/1932 NWS Out of Workshops (14 days)
/ 4/1932 - Modified AC Allce LT
17/ 1/1961 NWS Scrapped -
.
Vehicle.............SV # Date...... Loc History............SV Notes
*L 410.VA - 16/ 9/1905 NWS Built new WH 05/9251a
/ 9/1931 - Modified Trans hook
/ 5/1932 - Modified AC Allce LT
6/ 2/1981 BOW Scrapped [CRS]
1/ 4/1981 - Off Register [CRS]
*L 411.VA - 16/ 9/1905 NWS Built new WH 05/9251a, Iron
/10/1912 - Modified Spiral Sprg/couplers
5/ 3/1932 NWS Into Workshops -
/ 3/1932 - Modified AC Allce LT
22/ 3/1932 NWS Out of Workshops (18 days)
*L 412.VA - 16/ 9/1905 NWS Built new WH 05/9251a
/ 6/1919 - Modified 4 1/2" journals
14/ 5/1932 NWS Into Workshops -
/ 6/1932 - Modified AC Allce LT
20/ 6/1932 NWS Out of Workshops (38 days)
*L 413.VA - 16/ 9/1905 NWS Built new WH 05/9251a, Iron
8/ 1/1931 NWS Into Workshops -
4/ 6/1931 NWS Out of Workshops (50 days)
16/ 2/1932 NWS Into Workshops -
3/ 3/1932 NWS Out of Workshops (17 days)
/ 3/1932 - Modified AC Allce LT
*L 414.VA - 16/ 9/1905 NWS Built new WH 05/9251a, Iron
/10/1931 - Modified Trans hook
/ 5/1932 - Modified AC Allce LT
*L 415.VA - 26/ 9/1905 NWS Built new WH 05/9449a, Iron
3/ 5/1932 NWS Into Workshops -
/ 5/1932 - Modified AC Allce LT
20/ 5/1932 NWS Out of Workshops (18 days)
circa 1978 - Off Register [v]
13/ 4/1978 RAA Sighting DH/RO
*L 416.VA - 26/ 9/1905 NWS Built new WH 05/9449a, Iron
/12/1922 - Modified 4 1/2" journals
1/ 3/1932 NWS Into Workshops -
17/ 3/1932 NWS Out of Workshops (17 days)
/ 3/1932 - Modified Auto cpled
7/10/1933 NWS Into Workshops -
8/ 1/1934 NWS Out of Workshops (50 days)
*L 417.VA - 26/ 9/1905 NWS Built new WH 05/9449a, Iron
22/ 3/1932 NWS Into Workshops -
11/ 4/1932 NWS Out of Workshops (21 days)
/ 4/1932 - Modified AC Allce LT
*L 418.VA - 26/ 9/1905 NWS Built new WH 05/9449a, Iron
/ 7/1932 - Modified AC Allce LT
*L 419.VA - 26/ 9/1905 NWS Built new WH 05/9449a, Iron
/ 4/1917 - Modified 4" journals
19/ 4/1932 NWS Into Workshops -
2/ 5/1932 NWS Out of Workshops (14 days)
/ 5/1932 - Modified AC Allce LT
/ /1970 - Scrapped R104
.
Vehicle.............SV # Date...... Loc History............SV Notes
*L 420.VA - 26/ 9/1905 NWS Built new WH 05/9449a, Iron
5/ 6/1931 NWS Into Workshops -
/ 8/1931 - Modified Trans hook
27/ 8/1931 NWS Out of Workshops (50 days)
/ 5/1932 - Modified AC Allce LT
*L 421.VA - 26/ 9/1905 NWS Built new WH 05/9449a, Iron
/ 7/1932 - Modified AC Allce LT
circa 1978 - Off Register [v]
13/ 4/1978 RAA Sighting DH/RO
*L 422.VA - 26/ 9/1905 NWS Built new WH 05/9449a, Iron
21/ 5/1932 NWS Into Workshops -
/ 7/1932 - Modified Auto cpled (R1: Not shown)
21/ 7/1932 NWS Out of Workshops (50 days)
6/ 1/1982 - Off Register [CRS]
*L 423.VA - 26/ 9/1905 NWS Built new WH 05/9449a, Iron
11/ 3/1932 NWS Into Workshops -
/ 3/1932 - Modified AC Allce LT
23/ 3/1932 NWS Out of Workshops (13 days)
/ 5/1955 - Scrapped -
*L 424.VA - 26/ 9/1905 NWS Built new WH 05/9449a, Iron
15/ 1/1932 NWS Into Workshops -
/ 1/1932 - Modified Trans hook
29/ 1/1932 NWS Out of Workshops (15 days)
/ 5/1932 - Modified AC Allce LT
*L 425.VA - 26/ 9/1905 NWS Built new WH 05/9449a, Iron
/ 2/1932 - Modified AC Allce LT
31/ 5/1935 NWS Into Workshops -
6/ 9/1935 NWS Out of Workshops (50 days)
*L 426.VA - 26/ 9/1905 NWS Built new WH 05/9449a, Iron
22/ 3/1932 NWS Into Workshops -
11/ 4/1932 NWS Out of Workshops (21 days)
/ 4/1932 - Modified AC Allce LT
*L 427.VA - 26/ 9/1905 NWS Built new WH 05/9449a, Iron
20/11/1930 NWS Into Workshops -
17/ 8/1931 NWS Out of Workshops (50 days)
/ 8/1931 - Modified Trans hook
/ 5/1932 - Modified AC Allce LT
*L 428.VA - 26/ 9/1905 NWS Built new WH 05/9449a, Iron
8/ 3/1932 NWS Into Workshops -
/ 3/1932 - Modified AC Allce LT
23/ 3/1932 NWS Out of Workshops (16 days)
*L 429.VA - 26/ 9/1905 NWS Built new WH 05/9449a, Iron
3/ 2/1931 NWS Into Workshops -
22/ 4/1931 NWS Out of Workshops (50 days)
26/ 4/1932 NWS Into Workshops -
10/ 5/1932 NWS Out of Workshops (15 days)
/ 5/1932 - Modified AC Allce LT
.
Vehicle.............SV # Date...... Loc History............SV Notes
*L 430.VA - 26/ 9/1905 NWS Built new WH 05/9449a, Iron
26/ 4/1932 NWS Into Workshops -
/ 7/1932 - Modified AC Allce LT
7/ 7/1932 NWS To LB 430.VA (50 days)
*L 431.VA - 26/ 9/1905 NWS Built new WH 05/9449a, Iron
15/ 3/1932 NWS Into Workshops -
31/ 3/1932 NWS Out of Workshops (17 days)
/ 4/1932 - Modified AC Allce LT
2/11/1934 NWS Into Workshops -
13/ 9/1935 NWS Out of Workshops (50 days)
*L 432.VA - 26/ 9/1905 NWS Built new WH 05/9449a, Iron
3/ 5/1932 NWS Into Workshops -
14/ 7/1932 NWS Out of Workshops (50 days)
/ 7/1932 - Modified AC Allce LT
25/ 4/1980 GLN Damaged .. derailment
24/ 6/1980 - Off Register [CRS]
*L 433.VA - 26/ 9/1905 NWS Built new WH 05/9449a, Iron
12/ 8/1931 NWS Into Workshops -
16/ 9/1931 NWS Out of Workshops (36 days)
/ 9/1931 - Modified Trans hook
/ 6/1932 - Modified AC Allce LT
*L 434.VA - 30/ 9/1905 NWS Built new WH 05/9760a, Iron
26/ 4/1932 NWS Into Workshops -
/ 7/1932 - Modified AC Allce LT
7/ 7/1932 NWS To LB 434.VA (50 days)
LB 434.VA - circa 1956 - To L 434.VA (v)
*L 434.VA - 11/ 5/1983 - Off Register [CRS]
*L 435.VA - 30/ 9/1905 NWS Built new WH 05/9760a, Iron
19/ 3/1932 NWS Into Workshops -
/ 3/1932 - Modified AC Allce LT
5/ 4/1932 NWS Out of Workshops (18 days)
11/ 1/1935 NWS Into Workshops -
20/ 9/1935 NWS Out of Workshops (50 days)
*L 436.VA - 30/ 9/1905 NWS Built new WH 05/9760a, Iron
23/ 4/1932 NWS Into Workshops -
7/ 5/1932 NWS Out of Workshops (15 days)
/ 5/1932 - Modified AC Allce LT
13/ 3/1981 - Off Register [CRS]
13/ 3/1981 BOW Scrapped [CRS]
*L 437.VA - 30/ 9/1905 NWS Built new WH 05/9760a, Iron
19/ 3/1932 NWS Into Workshops -
11/ 4/1932 NWS Out of Workshops (24 days)
/ 4/1932 - Modified AC Allce LT
24/ 4/1933 NWS Into Workshops -
23/ 9/1933 NWS Out of Workshops (132 days)
/ /1969 - Scrapped -
.
Vehicle.............SV # Date...... Loc History............SV Notes
*L 438.VA - 30/ 9/1905 NWS Built new WH 05/9760a, Iron
18/ 2/1932 NWS Into Workshops -
5/ 3/1932 NWS Out of Workshops (17 days)
/ 3/1932 - Modified AC Allce LT
/ /1970 - Scrapped R104
*L 439.VA - 30/ 9/1905 NWS Built new WH 05/9449a, Iron
23/ 2/1932 NWS Into Workshops -
9/ 3/1932 NWS Out of Workshops (16 days)
/ 3/1932 - Modified AC Allce LT
22/ 7/1933 NWS Into Workshops -
23/ 9/1933 NWS Out of Workshops (55 days)
*L 440.VA - 30/ 9/1905 NWS Built new WH 05/9760a, Iron
17/ 6/1931 NWS Into Workshops -
22/ 7/1931 NWS Out of Workshops (36 days)
/ 8/1931 - Modified Trans hook
/ 4/1932 - Modified AC Allce LT
*L 441.VA - 30/ 9/1905 NWS Built new WH 05/9760a, Iron
12/ 4/1932 NWS Into Workshops -
/ 4/1932 - Modified AC Allce LT
28/ 4/1932 NWS Out of Workshops (17 days)
10/ 3/1936 NWS Into Workshops -
12/ 8/1936 NWS Out of Workshops (50 days)
/ /1971 - Scrapped R104
*L 442.VA - 30/ 9/1905 NWS Built new WH 05/9760a, Iron
23/ 4/1932 NWS Into Workshops -
18/ 7/1932 NWS Out of Workshops (50 days)
/ 7/1932 - Modified Auto cpled, R1: No reference
25/ 6/1981 - Off Register [CRS]
5/ 8/1981 NWS Scrapped [CRS]
*L 443.VA - 30/ 9/1905 NWS Built new WH 05/9760a, Iron
27/11/1931 NWS Into Workshops -
/12/1931 - Modified Trans hook
23/12/1931 NWS Out of Workshops (27 days)
/ 4/1932 - Modified AC Allce LT
*L 444.VA - 30/ 9/1905 NWS Built new WH 05/9760a, Iron
27/ 2/1932 NWS Into Workshops -
11/ 3/1932 NWS Out of Workshops (14 days)
/ 3/1932 - Modified AC Allce LT
8/ 1/1935 NWS Into Workshops -
13/ 9/1935 NWS Out of Workshops (50 days)
*L 445.VA - 30/ 9/1905 NWS Built new WH 05/9760a, Iron
8/ 1/1932 NWS Into Workshops -
4/ 2/1932 NWS Out of Workshops (28 days)
/ 2/1932 - Modified Trans hook
/ 5/1932 - Modified AC Allce LT
15/ 4/1979 ECH Photograph #1247.17
.
Vehicle.............SV # Date...... Loc History............SV Notes
*L 446.VA - 30/ 9/1905 NWS Built new WH 05/9760a, Iron
24/10/1930 NWS Into Workshops -
18/12/1930 NWS Out of Workshops (56 days)
/10/1931 - Modified Trans hook
/ 5/1932 - Modified AC Allce LT
*L 447.VA - 30/ 9/1905 NWS Built new WH 05/9760a, Iron
/11/1931 - Modified Trans hook
/ 5/1932 - Modified AC Allce LT
*L 448.VA - 30/ 9/1905 NWS Built new WH 05/9760a, Iron
/ 8/1932 - Modified AC Allce LT
/ /1970 - Scrapped R104
*L 449.VA - 7/10/1905 NWS Built new WH 05/9760a, Iron
4/ 5/1931 NWS Into Workshops -
5/ 6/1931 NWS Out of Workshops (33 days)
15/ 3/1932 NWS Into Workshops -
/ 3/1932 - Modified AC Allce LT
2/ 4/1932 NWS Out of Workshops (19 days)
/ /1975 - Scrapped RSN4/75
*L 450.VA - 7/10/1905 NWS Built new WH 05/9760a, Iron
14/ 5/1932 NWS Into Workshops -
/ 7/1932 - Modified Auto cpled, R1: No reference
21/ 7/1932 NWS Out of Workshops (50 days)
*L 451.VA - 11/10/1905 NWS Built new WH 05/10045a, Iron
19/ 3/1932 NWS Into Workshops -
15/ 4/1932 NWS Out of Workshops (28 days)
/ 4/1932 - Modified AC Allce LT
*L 452.VA - 14/10/1905 NWS Built new WH 05/10045a, Iron
/ 8/1931 - Modified Trans hook
/ 5/1932 - Modified AC Allce LT
*L 453.VA - 27/ 6/1907 NWS Built new WHB, Iron
/10/1931 - Modified Trans hook
/ 5/1932 - Modified AC Allce LT
15/ 1/1981 - Off Register [CRS]
10/ 2/1981 BOW Scrapped [CRS]
*L 454.VA - 27/ 6/1907 NWS Built new WHB, Iron
15/ 4/1932 NWS Into Workshops -
/ 4/1932 - Modified AC Allce LT
28/ 4/1932 NWS Out of Workshops (14 days)
*L 455.VA - 27/ 6/1907 NWS Built new WHB, Iron
19/ 2/1932 NWS Into Workshops -
10/ 3/1932 NWS Out of Workshops (21 days)
/ 3/1932 - Modified AC Allce LT
*L 456.VA - 27/ 6/1907 NWS Built new WHB, Iron
/ 4/1932 - Modified AC Allce LT
/ /1971 - Scrapped R104
.
Vehicle.............SV # Date...... Loc History............SV Notes
*L 457.VA - 27/ 6/1907 NWS Built new WHB, Iron
/10/1931 - Modified Trans hook
/ 5/1932 - Modified AC Allce LT
/ /1975 - Scrapped RSN5/75
*L 458.VA - 3/ 7/1907 NWS Built new WHB, Iron
4/12/1931 NWS Into Workshops -
15/12/1931 NWS Out of Workshops (12 days)
/12/1931 - Modified Trans hook
/ 5/1932 - Modified AC Allce LT
17/ 1/1961 NWS Scrapped -
*L 459.VA - 3/ 7/1907 NWS Built new WHB, Iron
6/11/1931 NWS Into Workshops -
1/12/1931 NWS Out of Workshops (26 days)
/12/1931 - Modified Trans hook
/ 5/1932 - Modified AC Allce LT
*L 460.VA - 3/ 7/1907 NWS Built new WHB, Iron
23/ 1/1931 NWS Into Workshops -
13/ 6/1931 NWS Out of Workshops (50 days)
26/ 4/1932 NWS Into Workshops -
14/ 5/1932 NWS Out of Workshops (19 days)
/ 5/1932 - Modified AC Allce LT
/ /1976 - Scrapped RSN4/76
*L 461.VA - 3/ 7/1907 NWS Built new WHB, Iron
/ 8/1919 - Modified 4 1/2" journals
21/ 5/1932 NWS Into Workshops -
/ 6/1932 - Modified AC Allce LT
15/ 6/1932 NWS To LB 461.VA (26 days)
*L 462.VA - 3/ 7/1907 NWS Built new WHB, Iron
19/ 2/1932 NWS Into Workshops -
5/ 3/1932 NWS Out of Workshops (16 days)
/ 3/1932 - Modified AC Allce LT
*L 463.VA - 3/ 7/1907 NWS Built new WHB, Iron
26/ 4/1932 NWS Into Workshops -
12/ 5/1932 NWS Out of Workshops (17 days)
/ 5/1932 - Modified AC Allce LT
*L 464.VA - 3/ 7/1907 NWS Built new WHB, Iron
4/12/1931 NWS Into Workshops -
17/12/1931 NWS Out of Workshops (14 days)
/12/1931 - Modified Trans hook
/ 5/1932 - Modified AC Allce LT
16/ 6/1970 SRD Scrapped -
*L 465.VA - 3/ 7/1907 NWS Built new WHB, Iron
/12/1931 - Modified T/hook (X'd "Continuous")
22/ 3/1932 NWS Into Workshops (Twice)
15/ 4/1932 NWS Out of Workshops (25 days)
17/ 6/1932 NWS Out of Workshops (50 days)
/ 6/1932 - Modified AC Allce LT
.
Vehicle.............SV # Date...... Loc History............SV Notes
*L 466.VA - 3/ 7/1907 NWS Built new WHB, Iron
/ 6/1917 - Modified 4 1/2" journals
/10/1931 - Modified Trans hook
/ 5/1932 - Modified AC Allce LT
*L 467.VA - 5/ 7/1907 NWS Built new WHB, Iron
24/ 5/1932 NWS Into Workshops -
/ 6/1932 - Modified AC Allce LT
16/ 6/1932 NWS To LB 467.VA (24 days)
*L 468.VA - 5/ 7/1907 NWS Built new WHB, Iron
5/ 8/1931 NWS Into Workshops -
5/ 9/1931 NWS Out of Workshops (32 days)
/ 9/1931 - Modified Trans hook
/ 5/1932 - Modified AC Alliance
*L 469.VA - 5/ 7/1907 NWS Built new WHB, Iron
9/ 1/1932 NWS Into Workshops -
11/ 2/1932 NWS Out of Workshops (34 days)
/ 2/1932 - Modified AC Allce LT
circa 1978 - Off Register [v]
13/ 4/1978 RAA Sighting DH/RO
*L 470.VA - 5/ 7/1907 NWS Built new WHB, Iron
22/ 3/1932 NWS Into Workshops -
/ 7/1932 - Modified Auto cpled; R1: No reference
22/ 7/1932 NWS Out of Workshops (50 days)
25/ 3/1982 - Off Register [CRS]
9/ 9/1982 BOW Scrapped [CRS]: body to SRD
*L 471.VA - 5/ 7/1907 NWS Built new WHB, Iron
/10/1931 - Modified Trans hook
/ 5/1932 - Modified AC Allce LT
*L 472.VA - 5/ 7/1907 NWS Built new WHB, Iron
14/ 5/1932 NWS Into Workshops -
31/ 5/1932 NWS Out of Workshops (18 days)
/ 6/1932 - Modified AC Allce LT
/ /1971 - Scrapped R104
*L 473.VA - 5/ 7/1907 NWS Built new WHB, Iron
/11/1931 - Modified Trans hook
/ 5/1932 - Modified AC Allce LT
*L 474.VA - 5/ 7/1907 NWS Built new WHB, Iron
12/ 4/1932 NWS Into Workshops -
/ 4/1932 - Modified AC Allce LT
29/ 4/1932 NWS Out of Workshops (18 days)
*L 475.VA - 11/ 7/1907 NWS Built new WHB, Iron
9/ 2/1932 NWS Into Workshops -
/ 2/1932 - Modified AC Allce LT
25/ 2/1932 NWS Out of Workshops (17 days)
.
Vehicle.............SV # Date...... Loc History............SV Notes
*L 476.VA - 11/ 7/1907 NWS Built new WHB, Iron
18/ 1/1932 NWS Into Workshops -
17/ 2/1932 NWS Out of Workshops (31 days)
/ 2/1932 - Modified AC Allce LT
*L 477.VA - 11/ 7/1907 NWS Built new WHB, Iron
15/ 4/1932 NWS Into Workshops -
2/ 5/1932 NWS Out of Workshops (18 days)
/ 5/1932 - Modified AC Allce LT
25/ 3/1965 - To KCC 165.VA -
*L 478.VA - 11/ 7/1907 NWS Built new WHB, Iron
/12/1931 - Modified Trans hook
/ 5/1932 - Modified AC Allce LT
12/ 1/1961 NWS Scrapped -
*L 479.VA - 13/ 7/1907 NWS Built new WHB, Iron
23/ 1/1931 NWS Into Workshops -
13/ 6/1931 NWS Out of Workshops (50 days)
8/ 3/1932 NWS Into Workshops -
/ 3/1932 - Modified AC Allce LT
23/ 3/1932 NWS Out of Workshops (16 days)
*L 480.VA - 13/ 7/1907 NWS Built new WHB, Iron
8/ 1/1932 NWS Into Workshops -
/ 1/1932 - Modified Trans hook
21/ 1/1932 NWS Out of Workshops (14 days)
/ 5/1932 - Modified AC Allce LT
*L 481.VA - 13/ 7/1907 NWS Built new WHB, Iron
22/ 1/1932 NWS Into Workshops -
17/ 2/1932 NWS Out of Workshops (27 days)
/ 2/1932 - Modified AC Allce LT
/ /1971 - Scrapped R104
*L 482.VA - 13/ 7/1907 NWS Built new WHB, Iron
11/ 3/1932 NWS Into Workshops -
30/ 3/1932 NWS Out of Workshops (20 days)
/ 4/1932 - Modified AC Allce LT
19/ 3/1965 - To KCC 164.VA -
*L 483.VA - 13/ 7/1907 NWS Built new WHB, Iron
24/ 5/1932 NWS Into Workshops -
10/ 6/1932 NWS Out of Workshops (18 days)
/ 6/1932 - Modified AC Allce LT
*L 484.VA - 13/ 7/1907 NWS Built new WHB, Iron
24/ 5/1932 NWS Into Workshops -
/ 6/1932 - Modified AC Allce LT
16/ 6/1932 NWS To LB 484.VA (24 days)
*L 485.VA - 13/ 7/1907 NWS Built new WHB, Iron
21/ 4/1932 NWS Into Workshops -
5/ 5/1932 NWS Out of Workshops (15 days)
/ 5/1932 - Modified AC Allce LT
.
Vehicle.............SV # Date...... Loc History............SV Notes
*L 486.VA - 18/ 7/1907 NWS Built new WHB, Iron
17/11/1931 NWS Into Workshops -
18/12/1931 NWS Out of Workshops (32 days)
/12/1931 - Modified Trans hook
/ 5/1932 - Modified AC Allce LT
/11/1968 BDE Photo (partial view) #23.33A
*L 487.VA - 18/ 7/1907 NWS Built new WHB, Iron
19/ 2/1932 NWS Into Workshops -
9/ 3/1932 NWS Out of Workshops (20 days)
/ 3/1932 - Modified AC Allce LT
*L 488.VA - 18/ 7/1907 NWS Built new WHB, Iron
26/ 4/1932 NWS Into Workshops -
14/ 5/1932 NWS Out of Workshops (19 days)
/ 5/1932 - Modified AC Allce LT
*L 489.VA - 18/ 7/1907 NWS Built new WHB, Iron
9/ 2/1932 NWS Into Workshops -
1/ 3/1932 NWS Out of Workshops (22 days)
/ 3/1932 - Modified AC Allce LT
24/ 5/1983 - Off Register [CRS]
15/ 7/1983 BOW Scrapped [CRS]
*L 490.VA - 18/ 7/1907 NWS Built new WHB, Iron
3/ 5/1932 NWS Into Workshops -
18/ 5/1932 NWS Out of Workshops (16 days)
/ 5/1932 - Modified AC Allce LT
*L 491.VA - 18/ 7/1907 NWS Built new WHB, Iron
27/ 5/1932 NWS Into Workshops -
/ 6/1932 - Modified AC Allce LT
23/ 6/1932 NWS To LB 491.VA (28 days)
LB 491.VA - 17/ 1/1961 NWS Scrapped -
*L 492.VA - 18/ 7/1907 NWS Built new WHB, Iron
22/ 1/1932 NWS Into Workshops -
17/ 2/1932 NWS Out of Workshops (27 days)
/ 2/1932 - Modified AC Allce LT
/ /1970 - Scrapped -
*L 493.VA - 18/ 7/1907 NWS Built new WHB, Iron
/11/1931 - Modified Trans hook
/ 5/1932 - Modified AC Allce LT
17/ 1/1961 NWS Scrapped -
*L 494.VA - 20/ 7/1907 NWS Built new WHB, Iron
17/ 6/1931 NWS Into Workshops -
31/ 7/1931 NWS Out of Workshops (45 days)
/ 8/1931 - Modified Trans hook
/ 5/1932 - Modified AC Allce LT
*L 495.VA - 25/ 7/1907 NWS Built new WHB, Iron
14/ 5/1932 NWS Into Workshops -
/ 6/1932 - Modified AC Allce LT
16/ 6/1932 NWS To LB 495.VA (34 days)
.
Vehicle.............SV # Date...... Loc History............SV Notes
*L 496.VA - 20/ 7/1907 NWS Built new WHB, Iron
/12/1931 - Modified Trans hook
/ 5/1932 - Modified AC Allce LT
6/ 7/1959 NWS Scrapped -
*L 497.VA - 20/ 7/1907 NWS Built new WHB, Iron
22/ 4/1931 NWS Into Workshops -
20/ 7/1931 NWS Out of Workshops (50 days)
1/ 3/1932 NWS Into Workshops -
18/ 3/1932 NWS Out of Workshops (18 days)
/ 3/1932 - Modified AC Allce LT
12/ 1/1961 NWS Scrapped -
*L 498.VA - 20/ 7/1907 NWS Built new WHB, Iron
21/ 5/1932 NWS Into Workshops -
/ 6/1932 - Modified AC Allce LT
23/ 6/1932 NWS To LB 498.VA (34 days)
LB 498.VA - 17/ 1/1961 NWS Scrapped -
*L 499.VA - 20/ 7/1907 NWS Built new WHB, Iron
29/ 4/1931 NWS Into Workshops -
19/ 8/1931 NWS Out of Workshops (50 days)
/ 8/1931 - Modified Trans hook
/ 5/1932 - Modified AC Allce LT
/ /1971 - Scrapped R104
*L 500.VA - 20/ 7/1907 NWS Built new WHB, Iron
18/ 2/1932 NWS Into Workshops -
5/ 3/1932 NWS Out of Workshops (17 days)
/ 3/1932 - Modified AC Allce LT
*L 501.VA - 20/ 7/1907 NWS Built new WHB, Iron
27/ 2/1932 NWS Into Workshops -
1/ 4/1932 NWS Out of Workshops (35 days)
/ 4/1932 - Modified AC Allce LT
/ /1975 - Scrapped RSN9/75
*L 502.VA - 20/ 7/1907 NWS Built new WHB, Iron
17/ 8/1931 NWS Into Workshops -
18/ 9/1931 NWS Out of Workshops (33 days)
/ 9/1931 - Modified Trans hook
/ 4/1932 - Modified AC Allce LT
*L 503.VA - 25/ 7/1907 NWS Built new WHB, Iron
21/ 5/1932 NWS Into Workshops -
17/ 6/1932 NWS Out of Workshops (28 days)
/ 6/1932 - Modified AC Allce LT
12/ 1/1961 NWS Scrapped -
*L 504.VA - 25/ 7/1907 NWS Built new WHB, Iron
23/ 2/1932 NWS Into Workshops -
9/ 3/1932 NWS Out of Workshops (16 days)
/ 3/1932 - Modified AC Allce LT
.
Vehicle.............SV # Date...... Loc History............SV Notes
*L 505.VA - 25/ 7/1907 NWS Built new WHB, Iron
/12/1931 - Modified Trans hook
/ 4/1932 - Modified AC Allce LT
14/ 1/1983 - Off Register [CRS]
22/ 4/1983 BOW Scrapped [CRS]
*L 506.VA - 25/ 7/1907 NWS Built new WHB, Iron
/11/1931 - Modified Trans hook
/ 5/1932 - Modified AC Allce LT
19/ 3/1965 - To KCC 163.VA -
KCC 163.VA - circa 1967 - To IK 163.VA [NIO]
IK 163.VA - / /1977 - Scrapped NR0977
*L 507.VA - 25/ 7/1907 NWS Built new WHB, Iron
7/ 8/1931 NWS Into Workshops -
8/ 9/1931 NWS Out of Workshops (33 days)
/ 9/1931 - Modified Trans hook
/ 5/1932 - Modified AC Allce LT
*L 508.VA - 30/ 7/1907 NWS Built new WH pipe, Iron
/ 3/1910 - Modified WHB
28/ 1/1932 NWS Into Workshops -
/ 2/1932 - Modified AC Allce LT
22/ 2/1932 NWS Out of Workshops (26 days)
12/ 9/1980 BOW Scrapped [CRS]
26/ 9/1980 - Off Register [CRS]
*L 509.VA - 30/ 7/1907 NWS Built new WHB, Iron
/10/1931 - Modified Trans hook
/ 5/1932 - Modified AC Allce LT
*L 510.VA - 30/ 7/1907 NWS Built new WHB, Iron
8/ 1/1932 NWS Into Workshops -
/ 1/1932 - Modified Trans hook
20/ 1/1932 NWS Out of Workshops (13 days)
/ 5/1932 - Modified AC Allce LT
*L 511.VA - 30/ 7/1907 NWS Built new WHB, Iron
21/ 5/1932 NWS Into Workshops -
/ 6/1932 - Modified AC Allce LT
15/ 6/1932 NWS To LB 511.VA (26 days)
LB 511.VA - circa 1954 - To L 511.VA -
*L 511.VA - 16/12/1964 NWS To KCC 7.VA -
KCC 7.VA 2nd circa 1965 - To IK 7.VA (v)
IK 7.VA - 18/ 5/1982 - Off Register [CRS]
6/ 8/1982 BOW Scrapped [CRS]: body to SRD
*L 512.VA - 1/ 8/1907 NWS Built new WH pipe, Iron
/ 9/1909 - Modified WHB
15/ 3/1932 NWS Into Workshops -
31/ 3/1932 NWS Out of Workshops (17 days)
/ 4/1932 - Modified AC Allce LT
/ /1970 - Scrapped R104
.
Vehicle.............SV # Date...... Loc History............SV Notes
*L 513.VA - 1/ 8/1907 NWS Built new WHB, Iron
16/ 2/1932 NWS Into Workshops -
3/ 3/1932 NWS Out of Workshops (17 days)
/ 3/1932 - Modified AC Allce LT
10/ 4/1970 SRD Scrapped -
*L 514.VA - 1/ 8/1907 NWS Built new WH pipe, Iron
/ 3/1910 - Modified WHB
12/ 4/1932 NWS Into Workshops -
/ 4/1932 - Modified AC Allce LT
28/ 4/1932 NWS Out of Workshops (17 days)
/ /1970 - Scrapped R104
*L 515.VA - 1/ 8/1907 NWS Built new WH pipe, Iron
/ 4/1910 - Modified WHB
18/ 2/1932 NWS Into Workshops -
5/ 3/1932 NWS Out of Workshops (17 days)
/ 3/1932 - Modified AC Allce LT
16/ 6/1970 SRD Scrapped -
*L 516.VA - 1/ 8/1907 NWS Built new WH pipe, Iron
circa 1931 - Modified Trans hook (X'd)
6/ 1/1932 NWS Into Workshops -
28/ 1/1932 NWS Out of Workshops (23 days)
/ 5/1932 - Modified AC Allce LT
17/ 1/1961 NWS Scrapped -
*L 517.VA - 1/ 8/1907 NWS Built new WH pipe, Iron
/ 3/1910 - Modified WHB
6/ 4/1932 NWS Into Workshops -
19/ 4/1932 NWS Out of Workshops (14 days)
/ 4/1932 - Modified AC Allce LT
*L 518.VA - 30/ 7/1907 NWS Built new WH pipe, Iron
/ 8/1909 - Modified WHB
19/ 2/1932 NWS Into Workshops -
15/ 3/1932 NWS Out of Workshops (26 days)
/ 3/1932 - Modified AC Allce LT
*L 519.VA - 26/ 7/1907 NWS Built new WH pipe, Iron
/ 3/1910 - Modified WHB
14/ 5/1932 NWS Into Workshops -
1/ 6/1932 NWS Out of Workshops (19 days)
/ 6/1932 - Modified AC Allce LT
*L 520.VA - 2/ 8/1907 NWS Built new WH pipe, Iron
/ 4/1910 - Modified WHB
9/ 1/1932 NWS Into Workshops -
11/ 2/1932 NWS Out of Workshops (34 days)
/ 2/1932 - Modified AC Allce LT
.
Vehicle.............SV # Date...... Loc History............SV Notes
*L 521.VA - 2/ 8/1907 NWS Built new WH pipe
/ 6/1910 - Modified WHB
17/ 2/1932 NWS Into Workshops -
/ 3/1932 - Modified AC Allce LT
22/ 3/1932 NWS Out of Workshops (35 days)
24/ 5/1935 NWS Into Workshops -
6/ 9/1935 NWS Out of Workshops (50 days)
/ /1973 - Scrapped NR8/73
*L 522.VA - 2/ 8/1907 NWS Built new WH pipe
/ 8/1909 - Modified WHB
/ 9/1911 - Modified Spiral Sprg couplers
1/ 3/1932 NWS Into Workshops -
17/ 3/1932 NWS Out of Workshops (17 days)
/ 3/1932 - Modified AC Allce LT
15/ 1/1981 - Off Register [CRS]
16/ 2/1981 BOW Scrapped [CRS]
*L 523.VA - 2/ 8/1907 NWS Built new WH pipe
/ 9/1909 - Modified WHB
/11/1931 - Modified Trans hook
/ 4/1933 - Modified AC Allce LT
/ /1976 - Scrapped RSN2/76
*L 524.VA - 2/ 8/1907 NWS Built new WH pipe
/ 3/1910 - Modified WHB
3/ 5/1932 NWS Into Workshops -
/ 7/1932 - Modified AC Allce LT
7/ 7/1932 NWS To LB 524.VA (50 days)
*L 525.VA - 3/ 8/1907 NWS Built new WH pipe
/ 3/1910 - Modified WHB
15/ 3/1932 NWS Into Workshops -
/ 3/1932 - Modified AC Allce LT
31/ 3/1932 NWS Out of Workshops (17 days)
*L 526.VA - 3/ 8/1907 NWS Built new WH pipe
/ 3/1910 - Modified WHB
27/ 2/1932 NWS Into Workshops -
11/ 3/1932 NWS Out of Workshops (14 days)
/ 3/1932 - Modified Auto cpled: R1: Not altered
circa 1978 - Off Register [v]
13/ 4/1978 RAA Sighting DH/RO
*L 527.VA - 3/ 8/1907 NWS Built new WH pipe
/ 7/1909 - Modified WHB
21/ 5/1932 NWS Into Workshops -
/ 6/1932 - Modified AC Allce LT
15/ 6/1932 NWS To LB 527.VA (26 days)
LB 527.VA - 3/ 4/1936 NWS Into Workshops -
28/ 7/1936 NWS Out of Workshops (50 days)
circa 1954 - To L 527.VA -
*L 527.VA - / /1971 - Scrapped R104
.
Vehicle.............SV # Date...... Loc History............SV Notes
*L 528.VA - 3/ 8/1907 NWS Built new WH pipe
/ 5/1910 - Modified WHB
12/ 4/1932 NWS Into Workshops -
/ 4/1932 - Modified AC Allce LT
28/ 4/1932 NWS Out of Workshops (17 days)
29/ 5/1970 SRD Scrapped -
*L 529.VA - 3/ 8/1907 NWS Built new WH pipe
/ 3/1910 - Modified WHB
/ 6/1917 - Modified 4 1/2" journals
5/ 3/1932 NWS Into Workshops -
18/ 3/1932 NWS Out of Workshops (14 days)
/ 3/1932 - Modified AC Allce LT
/ /1970 - Scrapped R104
13/ 4/1978 RAA Sighting [RO]
*L 530.VA - 3/ 8/1907 NWS Built new WH pipe
/ 4/1910 - Modified WHB
21/ 4/1932 NWS Into Workshops -
5/ 5/1932 NWS Out of Workshops (15 days)
/ 5/1932 - Modified AC Allce LT
*L 531.VA - 3/ 8/1907 NWS Built new WH pipe
/ 3/1910 - Modified WHB
22/ 3/1932 NWS Into Workshops -
11/ 4/1932 NWS Out of Workshops (21 days)
/ 4/1932 - Modified AC Allce LT
*L 532.VA - 8/ 8/1907 NWS Built new WH pipe
/ 1/1909 - Modified WHB
28/ 1/1932 NWS Into Workshops -
/ 2/1932 - Modified AC Allce LT
24/ 2/1932 NWS Out of Workshops (28 days)
*L 533.VA - 8/ 8/1907 NWS Built new WH pipe
/ 4/1910 - Modified WHB
21/ 5/1932 NWS Into Workshops -
/ 6/1932 - Modified AC Allce LT
24/ 6/1932 NWS Out of Workshops (35 days)
*L 534.VA - 8/ 8/1907 NWS Built new WH pipe
/ 8/1909 - Modified WHB
/11/1931 - Modified Trans hook
/ 4/1932 - Modified AC Allce LT
3/ 3/1936 NWS Into Workshops -
12/ 8/1936 NWS Out of Workshops (50 days)
/ /1975 - Scrapped RSN5/75
*L 535.VA - 8/ 8/1907 NWS Built new WH pipe
/ 8/1909 - Modified WHB
26/ 4/1932 NWS Into Workshops -
9/ 5/1932 NWS Out of Workshops (14 days)
/ 5/1932 - Modified AC Allce LT
/ 3/1955 NWS Modified Fitted 1 3/4" plain gratings
.
Vehicle.............SV # Date...... Loc History............SV Notes
*L 536.VA - 8/ 8/1907 NWS Built new WH pipe
/ 3/1910 - Modified WHB
20/11/1931 NWS Into Workshops -
30/11/1931 NWS Out of Workshops (11 days)
/12/1931 - Modified Trans hook
/ 4/1932 - Modified AC Allce LT
*L 537.VA - 8/ 8/1907 NWS Built new WH pipe
/11/1931 - Modified Trans hook
/ 5/1932 - Modified AC Allce LT
17/11/1981 SRD Scrapped [CRS], again 20/11/81 BOW
6/ 1/1982 - Off Register [CRS], again 3/12/81
*L 538.VA - 8/ 8/1907 NWS Built new WH pipe
/ 8/1909 - Modified WHB
1/ 3/1932 NWS Into Workshops -
17/ 3/1932 NWS Out of Workshops (17 days)
/ 3/1932 - Modified AC Allce LT
/ /1971 - Scrapped R104
*L 539.VA - 16/ 8/1907 NWS Built new WH pipe
/ 4/1910 - Modified WHB
8/ 4/1932 NWS Into Workshops -
/ 4/1932 - Modified AC Allce LT
22/ 4/1932 NWS Out of Workshops (15 days)
*L 540.VA - 16/ 8/1907 NWS Built new WH pipe
/ 7/1910 - Modified WHB
16/ 2/1932 NWS Into Workshops -
3/ 3/1932 NWS Out of Workshops (17 days)
/ 3/1932 - Modified AC Allce LT
*L 541.VA - 16/ 8/1907 NWS Built new WH pipe
/ 4/1910 - Modified WHB
/10/1931 - Modified Trans hook
/ 5/1932 - Modified Auto cpled
/ 5/1932 - Modified AC Allce LT
/ 3/1955 NWS Modified Fitted 1 3/4" plain grating
*L 542.VA - 16/ 8/1907 NWS Built new WH pipe
/ 3/1910 - Modified WHB
5/ 3/1932 NWS Into Workshops -
/ 3/1932 - Modified AC Allce LT
21/ 3/1932 NWS Out of Workshops (17 days)
*L 543.VA - 17/ 8/1907 NWS Built new WH pipe
/ 4/1910 - Modified WHB
3/ 5/1932 NWS Into Workshops -
/ 5/1932 - Modified AC Allce LT
21/ 5/1932 NWS Out of Workshops (19 days)
/ /1971 - Scrapped R104
*L 544.VA - 17/ 8/1907 NWS Built new WH pipe
/ 4/1910 - Modified WHB
/10/1931 - Modified Trans hook
/ 5/1932 - Modified AC Allce LT
.
Vehicle.............SV # Date...... Loc History............SV Notes
*L 545.VA - 17/ 8/1907 NWS Built new WH pipe
/ 7/1910 - Modified WHB
13/ 5/1932 NWS Into Workshops -
/ 6/1932 - Modified AC Allce LT
22/ 6/1932 NWS Out of Workshops (41 days)
*L 546.VA - 17/ 8/1907 NWS Built new WH pipe
/ 3/1910 - Modified WHB
9/ 2/1932 NWS Into Workshops -
/ 3/1932 - Modified AC Allce LT
23/ 3/1932 NWS Out of Workshops (44 days)
17/ 7/1934 NWS Into Workshops -
13/10/1934 NWS Out of Workshops (50 days)
*L 547.VA - 27/ 8/1907 NWS Built new WH pipe
/ 9/1909 - Modified WHB
18/ 1/1932 NWS Into Workshops -
2/ 2/1932 NWS Out of Workshops (16 days)
/ 2/1932 - Modified Trans hook
/ 6/1932 - Modified AC Allce LT
17/ 1/1961 NWS Scrapped -
*L 548.VA - 17/ 8/1907 NWS Built new WH pipe
/ 4/1910 - Modified WHB
/12/1924 - Modified 4 1/2" journals
/10/1931 - Modified Trans hook
/ 5/1932 - Modified AC Allce LT
17/ 3/1965 - To KCC 162.VA -
KCC 162.VA - circa 1967 - To IK 162.VA [NIO]
*L 549.VA - 16/ 8/1907 NWS Built new WH pipe
/ 3/1910 - Modified WHB
5/ 1/1931 NWS Into Workshops -
/ 8/1931 - Modified Trans hook
20/ 8/1931 NWS Out of Workshops (50 days)
/ 5/1932 - Modified AC Allce LT
6/ 7/1959 NWS Scrapped -
*L 550.VA - 22/ 8/1907 NWS Built new WH pipe
/ 4/1910 - Modified WHB
/12/1931 - Modified Trans hook
/ 5/1932 - Modified AC Allce LT
/ /1971 - Scrapped R104
*L 551.VA - 24/ 8/1907 NWS Built new WH pipe
/ 3/1910 - Modified WHB
/11/1931 - Modified Trans hook
/ 5/1932 - Modified AC Allce LT
*L 552.VA - 24/ 8/1907 NWS Built new WH pipe
/ 4/1910 - Modified WHB
19/ 2/1932 NWS Into Workshops -
15/ 3/1932 NWS Out of Workshops (26 days)
/ 3/1932 - Modified AC Allce LT
.
Vehicle.............SV # Date...... Loc History............SV Notes
*L 553.VA - 24/ 8/1907 NWS Built new WH pipe
/ 3/1910 - Modified WHB
18/12/1931 NWS Into Workshops -
7/ 1/1932 NWS Out of Workshops (21 days)
/ 1/1932 - Modified Trans hook
/ 6/1932 - Modified AC Allce LT
/ /1970 - Scrapped R104
*L 554.VA - 24/ 8/1907 NWS Built new WH pipe
/ 3/1910 - Modified WHB
/10/1931 - Modified Trans hook
/ 5/1932 - Modified AC Allce LT
/ /1970 - Scrapped -
*L 555.VA - 22/ 8/1907 NWS Built new WH pipe
/ 3/1910 - Modified WHB
19/ 3/1932 NWS Into Workshops -
/ 3/1932 - Modified AC Allce LT
5/ 4/1932 NWS Out of Workshops (18 days)
17/ 1/1961 NWS Scrapped -
*L 556.VA - 22/ 8/1907 NWS Built new WH pipe
/12/1907 - Modified WHB
/12/1931 - Modified WH pipe
/ 4/1932 - Modified AC Allce LT
/ /1970 - Scrapped R104
*L 557.VA - 27/ 8/1907 NWS Built new WH pipe
/ 7/1909 - Modified WHB
15/ 3/1932 NWS Into Workshops -
/ 3/1932 - Modified AC Allce LT
2/ 4/1932 NWS Out of Workshops (19 days)
/ /1969 - Scrapped -
*L 558.VA - 28/ 8/1907 NWS Built new WH pipe
/ 4/1910 - Modified WHB
21/ 4/1932 NWS Into Workshops -
/ 5/1932 - Modified AC Allce LT
27/ 5/1932 NWS Out of Workshops (37 days)
*L 559.VA - 28/ 8/1907 NWS Built new WH pipe
/ 9/1909 - Modified WHB
8/ 3/1932 NWS Into Workshops -
/ 3/1932 - Modified AC Allce LT
23/ 3/1932 NWS Out of Workshops (16 days)
17/ 1/1961 NWS Scrapped -
*L 560.VA - 28/ 8/1907 NWS Built new WH pipe
/ 8/1909 - Modified WHB
21/ 5/1932 NWS Into Workshops -
/ 6/1932 - Modified AC Allce LT
15/ 6/1932 NWS To LB 560.VA (26 days)
LB 560.VA - 11/ 9/1954 NMW To L 560.VA (W/E)
.
Vehicle.............SV # Date...... Loc History............SV Notes
*L 561.VA - 27/ 8/1907 NWS Built new WH pipe
/ 9/1908 - Modified WHB
/12/1931 - Modified Trans hook
/ 5/1932 - Modified AC Allce LT
*L 562.VA - 27/ 8/1907 NWS Built new WH pipe
/ 3/1910 - Modified WHB
17/ 2/1932 NWS Into Workshops -
/ 3/1932 - Modified AC Allce LT
22/ 3/1932 NWS Out of Workshops (35 days)
*L 563.VA - 28/ 8/1907 NWS Built new WH pipe
/ 3/1910 - Modified WHB
10/ 5/1932 NWS Into Workshops -
/ 6/1932 - Modified AC Allce LT
15/ 6/1932 NWS To LB 563.VA (37 days)
*L 564.VA - 9/ 9/1907 NWS Built new WH pipe
/ 3/1910 - Modified WHB
5/ 3/1932 NWS Into Workshops -
17/ 3/1932 NWS Out of Workshops (13 days)
/ 3/1932 - Modified AC Allce LT
/ /1975 - Scrapped RSN9/75
*L 565.VA - 31/ 8/1907 NWS Built new WH pipe
/ 4/1910 - Modified WHB
15/ 1/1932 NWS Into Workshops -
16/ 2/1932 NWS Out of Workshops (33 days)
/ 2/1932 - Modified Trans hook
/ 4/1932 - Modified AC Allce LT
*L 566.VA - 18/ 9/1907 NWS Built new WHB
15/ 3/1932 NWS Into Workshops -
/ 3/1932 - Modified AC Allce LT
31/ 3/1932 NWS Out of Workshops (17 days)
*L 567.VA - 9/ 9/1907 NWS Built new WH pipe
/ 4/1910 - Modified WHB
21/ 5/1932 NWS Into Workshops -
/ 6/1932 - Modified AC Allce LT
24/ 6/1932 NWS Out of Workshops (35 days)
16/ 6/1970 SRD Modified -
*L 568.VA - 31/ 8/1907 NWS Built new WH pipe
/ 6/1910 - Modified WHB
28/ 1/1932 NWS Into Workshops -
/ 2/1932 - Modified AC Allce LT
22/ 2/1932 NWS Out of Workshops (26 days)
*L 569.VA - 31/ 8/1907 NWS Built new WH pipe
/ 3/1910 - Modified WHB
/ 3/1932 - Modified AC Allce LT
.
Vehicle.............SV # Date...... Loc History............SV Notes
*L 570.VA - 9/ 9/1907 NWS Built new WH pipe
/ 3/1910 - Modified WHB
3/ 5/1932 NWS Into Workshops -
/ 5/1932 - Modified AC Allce LT
25/ 5/1932 NWS Out of Workshops (23 days)
KF 95.VA - 20/11/1959 - Built new Scrap u/f
14/12/1961 - To KW 95.VA -
KW 95.VA - 3/ 3/1964 BOW To KCC 109.VA -
KCC 109.VA - 9/ 9/1964 - Scrapped -
*L 570.VA - 22/12/1964 NWS To KCC 109.VA -
KCC 109.VA - circa 1967 - To IK 109.VA [NIO]
*L 571.VA - 31/ 8/1907 NWS Built new WH pipe
/ 4/1910 - Modified WHB
/12/1931 - Modified Trans hook
/ 5/1932 - Modified AC Allce LT
21/ 4/1970 SRD Scrapped -
*L 572.VA - 31/ 8/1907 NWS Built new WH pipe
/ 5/1910 - Modified WHB
/11/1931 - Modified Trans hook
/ 4/1932 - Modified AC Allce LT
*L 573.VA - 9/ 9/1907 NWS Built new WH pipe
/ 5/1910 - Modified WHB
/11/1931 - Modified Trans hook
/ 5/1932 - Modified AC Allce LT
/ 3/1955 NWS Modified Fitted 1 3/4" plain gratings
/ /1969 - Scrapped -
*L 574.VA - 9/ 9/1907 NWS Built new WH pipe
/ 3/1910 - Modified WHB
30/ 1/1932 NWS Into Workshops -
/ 2/1932 - Modified AC Allce LT
22/ 2/1932 NWS Out of Workshops (24 days)
/ /1976 - Scrapped RSN10/76
*L 575.VA - 9/ 9/1907 NWS Built new WH pipe
/ 4/1910 - Modified WHB
27/ 2/1932 NWS Into Workshops -
11/ 3/1932 NWS Out of Workshops (14 days)
/ 3/1932 - Modified AC Allce LT
*L 576.VA - 9/ 9/1907 NWS Built new WH pipe
/ 4/1910 - Modified WHB
24/ 5/1932 NWS Into Workshops -
/ 6/1932 - Modified AC Allce LT
16/ 6/1932 NWS To LB 576.VA (24 days)
LB 576.VA - 5/ 5/1936 NWS Into Workshops -
19/ 8/1936 NWS Out of Workshops (50 days)
circa 1955 - To L 576.VA -
*L 576.VA - 10/ 4/1970 SRD Scrapped ex Newport
.
Vehicle.............SV # Date...... Loc History............SV Notes
*L 577.VA - 9/ 9/1907 NWS Built new WH pipe
/ 4/1910 - Modified WHB
27/ 7/1931 NWS Into Workshops -
2/ 9/1931 NWS Out of Workshops (38 days)
/ 9/1931 - Modified Trans hook
/ 5/1932 - Modified AC Allce LT
*L 578.VA - 9/ 9/1907 NWS Built new WH pipe
/ 3/1910 - Modified WHB
22/ 6/1931 NWS Into Workshops -
13/ 8/1931 NWS Out of Workshops (50 days)
/ 8/1931 - Modified Trans hook
/ 5/1932 - Modified AC Allce LT
/ /1971 - Scrapped R104
*L 579.VA - 9/ 9/1907 NWS Built new WH pipe
/ 3/1910 - Modified WHB
6/ 4/1932 NWS Into Workshops -
19/ 4/1932 NWS Out of Workshops (14 days)
/ 4/1932 - Modified AC Allce LT
*L 580.VA - 9/ 9/1907 NWS Built new WH pipe
/ 4/1910 - Modified WHB
10/ 5/1932 NWS Into Workshops -
/ 6/1932 - Modified AC Allce LT
15/ 6/1932 NWS To LB 580.VA (37 days)
LB 580.VA - circa 1954 - To L 580.VA -
*L 580.VA - 17/ 1/1961 NWS Scrapped -
*L 581.VA - 18/ 9/1907 NWS Built new WHB
10/ 5/1932 NWS Into Workshops -
/ 6/1932 - Modified AC Allce LT
23/ 6/1932 NWS To LB 581.VA (45 days)
*L 582.VA - 18/ 9/1907 NWS Built new WHB
30/ 3/1932 NWS Into Workshops -
19/ 4/1932 NWS Out of Workshops (21 days)
/ 4/1932 - Modified AC Allce LT
10/ 3/1960 NWS Scrapped -
*L 583.VA - 18/ 9/1907 NWS Built new WHB
/11/1919 - Modified 4 1/2" journals
6/ 4/1932 NWS Into Workshops -
19/ 4/1932 NWS Out of Workshops (14 days)
/ 4/1932 - Modified AC Allce LT
*L 584.VA - 18/ 9/1907 NWS Built new WHB
/10/1931 - Modified Trans hook
/ 5/1932 - Modified AC Allce LT
16/ 6/1970 SRD Scrapped -
*L 585.VA - 18/ 9/1907 NWS Built new WHB
30/ 1/1932 NWS Into Workshops -
/ 2/1932 - Modified AC Allce LT
22/ 2/1932 NWS Out of Workshops (24 days)
15/ 6/1983 - Off Register [CRS]
.
Vehicle.............SV # Date...... Loc History............SV Notes
*L 586.VA - 18/ 9/1907 NWS Built new WHB
27/ 2/1932 NWS Into Workshops -
11/ 3/1932 NWS Out of Workshops (14 days)
/ 3/1932 - Modified AC Allce LT
/ /1970 - Scrapped R104
*L 587.VA - 18/ 9/1907 NWS Built new WHB
21/ 4/1932 NWS Into Workshops -
5/ 5/1932 NWS Out of Workshops (15 days)
/ 5/1932 - Modified AC Allce LT
*L 588.VA - 23/ 9/1907 NWS Built new WHB
3/ 5/1932 NWS Into Workshops -
19/ 5/1932 NWS Out of Workshops (17 days)
/ 5/1932 - Modified AC Allce LT
/ /1971 - Scrapped R104
*L 589.VA - 23/ 9/1907 NWS Built new WHB
4/11/1930 NWS Into Workshops -
23/12/1930 NWS Out of Workshops (50 days)
10/ 5/1932 NWS Into Workshops -
/ 6/1932 - Modified AC Allce LT
15/ 6/1932 NWS To LB 589.VA (37 days)
*L 590.VA - 23/ 9/1907 NWS Built new WHB
6/ 1/1932 NWS Into Workshops -
18/ 1/1932 NWS Out of Workshops (13 days)
/ 1/1932 - Modified Trans hook
/ 5/1932 - Modified AC Allce LT
*L 591.VA - 23/ 9/1907 NWS Built new WHB
21/ 5/1932 NWS Into Workshops -
14/ 6/1932 NWS Out of Workshops (25 days)
/ 6/1932 - Modified AC Allce LT
*L 592.VA - 12/10/1907 NWS Built new WHB
22/ 3/1932 NWS Into Workshops -
11/ 4/1932 NWS Out of Workshops (21 days)
/ 4/1932 - Modified AC Allce LT
12/ 6/1936 NWS Into Workshops -
5/ 8/1936 NWS Out of Workshops (50 days)
22/ 6/1984 - Off Register [CRS]
*L 593.VA - 4/10/1907 NWS Built new WHB
/10/1931 - Modified Trans hook
1/12/1931 NWS Into Workshops -
21/ 3/1932 NWS Out of Workshops (50 days)
/ 5/1932 - Modified AC Allce LT
*L 594.VA - 4/10/1907 NWS Built new WHB
21/ 4/1932 NWS Into Workshops -
13/ 5/1932 NWS Out of Workshops (23 days)
/ 5/1932 - Modified AC Allce LT
*L 595.VA - 4/10/1907 NWS Built new WHB
/11/1931 - Modified Trans hook
/ 5/1932 - Modified AC Allce LT
.
Vehicle.............SV # Date...... Loc History............SV Notes
*L 596.VA - 4/10/1907 NWS Built new WHB
15/ 1/1932 NWS Into Workshops -
/ 1/1932 - Modified Trans hook
26/ 1/1932 NWS Out of Workshops (12 days)
16/ 2/1932 NWS Into Workshops -
3/ 3/1932 NWS Out of Workshops (17 days)
/ 5/1932 - Modified AC Allce LT
17/ 1/1961 NWS Scrapped -
*L 597.VA - 4/10/1907 NWS Built new WHB
9/ 1/1932 NWS Into Workshops -
17/ 2/1932 NWS Out of Workshops (40 days)
/ 2/1932 - Modified AC Allce LT
*L 598.VA - 4/10/1907 NWS Built new WHB
/ 8/1917 - Modified 4 1/2" journals
/10/1931 - Modified Trans hook
/ 4/1932 - Modified AC Allce LT
15/ 4/1979 ECH Photograph #1247.16
*L 599.VA - 4/10/1907 NWS Built new WHB
/ 9/1931 - Modified Trans hook
/ 5/1932 - Modified AC Allce LT
*L 600.VA - 4/10/1907 NWS Built new WHB
22/ 3/1932 NWS Into Workshops -
11/ 4/1932 NWS Out of Workshops (21 days)
/ 4/1932 - Modified AC Allce LT
*L 601.VA - 12/10/1907 NWS Built new WHB
circa 1907 - Photograph #611.13: VR Photo
19/ 4/1932 NWS Into Workshops -
4/ 5/1932 NWS Out of Workshops (16 days)
/ 5/1932 - Modified AC Allce LT
*L 602.VA - 12/10/1907 NWS Built new WHB
27/ 4/1932 NWS Into Workshops -
14/ 5/1932 NWS Out of Workshops (18 days)
/ 5/1932 - Modified AC Allce LT
20/ 3/1936 NWS Into Workshops -
28/ 7/1936 NWS Out of Workshops (50 days)
*L 603.VA - 3/12/1908 NWS Built new WHB
16/ 2/1932 NWS Into Workshops -
3/ 3/1932 NWS Out of Workshops (17 days)
/ 3/1932 - Modified AC Allce LT
21/ 9/1980 TOT Photo (partial view) #1631.9
22/ 6/1984 - Off Register [CRS]
*L 604.VA - 3/12/1908 NWS Built new WHB
1/ 3/1932 NWS Into Workshops -
17/ 3/1932 NWS Out of Workshops (17 days)
/ 3/1932 - Modified AC Allce LT
22/ 9/1936 NWS Into Workshops -
29/10/1936 NWS Out of Workshops (38 days)
12/ 1/1961 NWS Scrapped -
.
Vehicle.............SV # Date...... Loc History............SV Notes
*L 605.VA - 3/12/1908 NWS Built new WHB
26/ 4/1932 NWS Into Workshops -
10/ 5/1932 NWS Out of Workshops (15 days)
/ 5/1932 - Modified AC Allce LT
22/ 9/1981 - Off Register [CRS]
30/10/1981 BOW Scrapped [CRS]
*L 606.VA - 3/12/1908 NWS Built new WHB
3/ 5/1932 NWS Into Workshops -
/ 5/1932 - Modified AC Allce LT
20/ 5/1932 NWS Out of Workshops (18 days)
/ /1978 - Photograph #1020, #1047
*L 607.VA - 3/12/1908 NWS Built new WHB
3/ 5/1932 NWS Into Workshops -
/ 5/1932 - Modified AC Allce LT
21/ 5/1932 NWS Out of Workshops (19 days)
*L 608.VA - 3/12/1908 NWS Built new WHB
/11/1931 - Modified Trans hook
/ 5/1932 - Modified AC Allce LT
/ /1976 - Scrapped RSN10/76
*L 609.VA - 3/12/1908 NWS Built new WHB
14/ 5/1932 NWS Into Workshops -
30/ 5/1932 NWS Out of Workshops (17 days)
/ 6/1932 - Modified AC Allce LT
*L 610.VA - 3/12/1908 NWS Built new WHB
11/ 3/1932 NWS Into Workshops -
31/ 3/1932 NWS Out of Workshops (21 days)
/ 4/1932 - Modified AC Allce LT
*L 611.VA - 5/12/1908 NWS Built new WHB
8/ 3/1932 NWS Into Workshops -
/ 3/1932 - Modified AC Allce LT
22/ 3/1932 NWS Out of Workshops (15 days)
6/ 7/1959 NWS Scrapped -
*L 612.VA - 5/12/1908 NWS Built new WHB
15/ 4/1932 NWS Into Workshops -
3/ 5/1932 NWS Out of Workshops (19 days)
/ 5/1932 - Modified AC Allce LT
15/ 4/1979 ECH Photograph #1247.22
*L 613.VA - 5/12/1908 NWS Built new WHB
22/ 3/1932 NWS Into Workshops -
11/ 4/1932 NWS Out of Workshops (21 days)
/ 4/1932 - Modified AC Allce LT
*L 614.VA - 5/12/1908 NWS Built new WHB
/12/1931 - Modified Trans hook
/ 5/1932 - Modified AC Allce LT
.
Vehicle.............SV # Date...... Loc History............SV Notes
*L 615.VA - 5/12/1908 NWS Built new WHB
21/ 4/1932 NWS Into Workshops -
/ 5/1932 - Modified AC Allce LT
26/ 5/1932 NWS Out of Workshops (36 days)
/ /1971 - Scrapped R104
*L 616.VA - 7/12/1908 NWS Built new WHB
/12/1931 - Modified Trans hook
/ 5/1932 - Modified AC Allce LT
*L 617.VA - 7/12/1908 NWS Built new WHB
/ 7/1919 - Modified 4 1/2" journals
14/ 5/1932 NWS Into Workshops -
/ 6/1932 - Modified AC Allce LT
23/ 6/1932 NWS To LB 617.VA (41 days)
*L 618.VA - 7/12/1908 NWS Built new WHB
17/ 8/1931 NWS Into Workshops -
18/ 9/1931 NWS Out of Workshops (33 days)
/ 9/1931 - Modified Trans hook
/ 5/1932 - Modified AC Allce LT
*L 619.VA - 7/12/1908 NWS Built new WHB
/ 8/1925 - Modified 4 1/2" journals
28/ 1/1932 NWS Into Workshops -
/ 2/1932 - Modified AC Allce LT
22/ 2/1932 NWS Out of Workshops (26 days)
4/ 7/1933 NWS Into Workshops -
23/ 9/1933 NWS Out of Workshops (71 days)
*L 620.VA - 7/12/1908 NWS Built new WHB
9/12/1931 NWS Into Workshops -
18/12/1931 NWS Out of Workshops (10 days)
/12/1931 - Modified Trans hook
/ 5/1932 - Modified AC Allce LT
/ /1970 - Scrapped -
*L 621.VA - 28/ 5/1909 NWS Built new WHB
/10/1931 - Modified Trans hook
/ 4/1932 - Modified AC Allce LT
5/ 1/1961 NWS Scrapped -
*L 622.VA - 28/ 5/1909 NWS Built new WHB
/11/1931 - Modified Trans hook
/ 5/1932 - Modified AC Allce LT
/ /1970 - Scrapped R104
*L 623.VA - 28/ 5/1909 NWS Built new WHB
8/ 4/1932 NWS Into Workshops -
/ 4/1932 - Modified AC Allce LT
28/ 4/1932 NWS Out of Workshops (21 days)
/ /1969 - Scrapped -
.
Vehicle.............SV # Date...... Loc History............SV Notes
*L 624.VA - 28/ 5/1909 NWS Built new WHB
9/ 1/1932 NWS Into Workshops -
11/ 2/1932 NWS Out of Workshops (34 days)
/ 2/1932 - Modified AC Allce LT
18/ 6/1982 - Off Register [CRS]
15/10/1982 SRD Scrapped [CRS]: ex BOW
*L 625.VA - 19/ 6/1909 NWS Built new WHB
26/ 4/1932 NWS Into Workshops -
10/ 5/1932 NWS Out of Workshops (15 days)
/ 5/1932 - Modified AC Allce LT
11/ 6/1970 SRD Scrapped -
*L 626.VA - 19/ 6/1909 NWS Built new WHB
26/ 4/1932 NWS Into Workshops -
13/ 5/1932 NWS Out of Workshops (18 days)
/ 5/1932 - Modified AC Allce LT
*L 627.VA - 19/ 6/1909 NWS Built new WHB
11/12/1930 NWS Into Workshops -
/ 8/1931 - Modified Trans hook
26/ 8/1931 NWS Out of Workshops (50 days)
/ 5/1932 - Modified AC Allce LT
*L 628.VA - 19/ 6/1909 NWS Built new WHB
26/ 4/1932 NWS Into Workshops -
11/ 5/1932 NWS Out of Workshops (16 days)
/ 5/1932 - Modified AC Allce LT
17/ 1/1961 NWS Scrapped -
*L 629.VA - 19/ 6/1909 NWS Built new WHB
16/ 2/1932 NWS Into Workshops -
3/ 3/1932 NWS Out of Workshops (17 days)
/ 3/1932 - Modified AC Allce LT
17/ 1/1961 NWS Scrapped -
*L 630.VA - 25/ 6/1909 NWS Built new WHB
8/ 4/1932 NWS Into Workshops -
/ 4/1932 - Modified AC Allce LT
28/ 4/1932 NWS Out of Workshops (21 days)
/ /1971 - Scrapped R104
*L 631.VA - 25/ 6/1909 NWS Built new WHB
21/ 4/1932 NWS Into Workshops -
/ 5/1932 - Modified AC Allce LT
25/ 5/1932 NWS Out of Workshops (35 days)
/ /1970 - Scrapped R104
*L 632.VA - 25/ 6/1909 NWS Built new WHB
21/ 4/1932 NWS Into Workshops -
/ 5/1932 - Modified AC Allce LT
26/ 5/1932 NWS Out of Workshops (36 days)
22/ 9/1981 - Off Register [CRS]
6/11/1981 BOW Scrapped [CRS]
.
Vehicle.............SV # Date...... Loc History............SV Notes
*L 633.VA - 25/ 6/1909 NWS Built new WHB
17/ 5/1932 NWS Into Workshops -
30/ 5/1932 NWS Out of Workshops (14 days)
/ 6/1932 - Modified AC Allce LT
25/ 3/1982 - Off Register [CRS]
15/ 9/1982 BOW Scrapped [CRS]: body to SRD
*L 634.VA - 25/ 6/1909 NWS Built new WHB
/10/1931 - Modified Trans hook
/ 5/1932 - Modified AC Allce LT
*L 635.VA - 30/ 6/1909 NWS Built new WHB
28/ 1/1932 NWS Into Workshops -
/ 2/1932 - Modified AC Allce LT
25/ 2/1932 NWS Out of Workshops (29 days)
12/ 1/1961 NWS Scrapped -
*L 636.VA - 30/ 6/1909 NWS Built new WHB
24/ 5/1932 NWS Into Workshops -
/ 6/1932 - Modified AC Allce LT
16/ 6/1932 NWS To LB 636.VA (24 days)
*L 637.VA - 30/ 6/1909 NWS Built new WHB
/11/1931 - Modified Trans hook
/ 5/1932 - Modified AC Allce LT
13/ 5/1981 - Off Register [CRS]
17/ 7/1981 BOW Sold (to) [CRS]
*L 638.VA - 30/ 6/1909 NWS Built new WHB
10/ 5/1932 NWS Into Workshops -
/ 6/1932 - Modified AC Allce LT
23/ 6/1932 NWS To LB 638.VA (45 days)
LB 638.VA - 28/ 8/1954 - To L 638.VA -
*L 639.VA - 30/ 6/1909 NWS Built new WHB
9/12/1931 NWS Into Workshops -
/12/1931 - Modified Trans hook
22/12/1931 NWS Out of Workshops (14 days)
/ 5/1932 - Modified AC Allce LT
*L 640.VA - 30/ 6/1909 NWS Built new WHB
19/ 3/1932 NWS Into Workshops -
13/ 4/1932 NWS Out of Workshops (26 days)
/ 4/1932 - Modified AC Allce LT
*L 641.VA - 30/ 6/1909 NWS Built new WHB
/12/1931 - Modified Trans hook
/ 5/1932 - Modified AC Allce LT
*L 642.VA - 30/ 6/1909 NWS Built new WHB
14/ 5/1932 NWS Into Workshops -
/ 6/1932 - Modified AC Allce LT
23/ 6/1932 NWS To LB 642.VA (41 days)
.
Vehicle.............SV # Date...... Loc History............SV Notes
*L 643.VA - 30/ 6/1909 NWS Built new WHB
19/ 2/1932 NWS Into Workshops -
9/ 3/1932 NWS Out of Workshops (20 days)
/ 3/1932 - Modified AC Allce LT
17/ 1/1961 NWS Scrapped -
*L 644.VA - 30/ 6/1909 NWS Built new WHB
/10/1931 - Modified Trans hook
/ 5/1932 - Modified AC Allce LT
*L 645.VA - 30/ 6/1909 NWS Built new WHB
8/ 4/1932 NWS Into Workshops -
/ 4/1932 - Modified AC Allce LT
21/ 4/1932 NWS Out of Workshops (14 days)
*L 646.VA - 30/ 6/1909 NWS Built new WHB
8/ 4/1932 NWS Into Workshops -
/ 4/1932 - Modified AC Allce LT
22/ 4/1932 NWS Out of Workshops (15 days)
*L 647.VA - 30/ 6/1909 NWS Built new WHB
15/ 3/1932 NWS Into Workshops -
/ 3/1932 - Modified AC Allce LT
2/ 4/1932 NWS Out of Workshops (19 days)
*L 648.VA - 30/ 6/1909 NWS Built new WHB
5/ 3/1932 NWS Into Workshops -
/ 3/1932 - Modified AC Allce LT
21/ 3/1932 NWS Out of Workshops (17 days)
*L 649.VA - 10/ 7/1909 NWS Built new WHB
/11/1931 - Modified Trans hook
/ 5/1932 - Modified AC Allce LT
*L 650.VA - 10/ 7/1909 NWS Built new WHB
19/ 3/1932 NWS Into Workshops -
/ 3/1932 - Modified AC Allce LT
11/ 4/1932 NWS Out of Workshops (24 days)
12/ 1/1961 NWS Scrapped -
*L 651.VA - 10/ 7/1909 NWS Built new WHB
19/ 2/1932 NWS Into Workshops -
10/ 3/1932 NWS Out of Workshops (21 days)
/ 3/1932 - Modified AC Allce LT (R1: 3/31)
*L 652.VA - 10/ 7/1909 NWS Built new WHB
28/ 1/1932 NWS Into Workshops -
/ 2/1932 - Modified AC Allce LT
23/ 2/1932 NWS Out of Workshops (27 days)
12/ 1/1961 NWS Scrapped -
*L 653.VA - 10/ 7/1909 NWS Built new WHB
23/ 9/1930 NWS Into Workshops -
15/11/1930 NWS Out of Workshops (54 days)
21/ 4/1932 NWS Into Workshops -
11/ 5/1932 NWS Out of Workshops (21 days)
/ 5/1932 - Modified AC Allce LT
.
Vehicle.............SV # Date...... Loc History............SV Notes
*L 654.VA - 17/ 7/1909 NWS Built new WHB
18/ 1/1932 NWS Into Workshops -
6/ 2/1932 NWS Out of Workshops (20 days)
/ 2/1932 - Modified AC Allce LT
/ /1976 - Scrapped RSN3/76
*L 655.VA - 23/ 7/1909 NWS Built new WHB
9/ 2/1932 NWS Into Workshops -
1/ 3/1932 NWS Out of Workshops (22 days)
/ 3/1932 - Modified AC Allce LT
/ /1971 - Scrapped R104
*L 656.VA - 23/ 7/1909 NWS Built new WHB
23/ 2/1932 NWS Into Workshops -
9/ 3/1932 NWS Out of Workshops (16 days)
/ 3/1932 - Modified AC Allce LT
/ /1975 - Scrapped RSN5/75
*L 657.VA - 23/ 7/1909 NWS Built new WHB
/11/1931 - Modified Trans hook
/ 5/1932 - Modified AC Allce LT
*L 658.VA - 23/ 7/1909 NWS Built new WHB
22/ 3/1932 NWS Into Workshops -
11/ 4/1932 NWS Out of Workshops (21 days)
/ 4/1932 - Modified AC Allce LT
*L 659.VA - 23/ 7/1909 NWS Built new WHB
8/ 3/1932 NWS Into Workshops -
30/ 3/1932 NWS Out of Workshops (23 days)
/ 4/1932 - Modified AC Allce LT
8/ 9/1936 NWS Into Workshops -
29/10/1936 NWS Out of Workshops (50 days)
24/ 1/1957 - Scrapped -
*L 660.VA - 23/ 7/1909 NWS Built new WHB
/ 8/1931 - Modified Trans hook
/ 5/1932 - Modified AC Allce LT
6/ 4/1970 SRD Scrapped -
*L 661.VA - 31/ 7/1909 NWS Built new WHB
22/ 3/1932 NWS Into Workshops -
11/ 4/1932 NWS Out of Workshops (21 days)
/ 4/1932 - Modified AC Allce LT
17/ 1/1961 NWS Scrapped -
*L 662.VA - 31/ 7/1909 NWS Built new WHB
11/ 3/1932 NWS Into Workshops -
30/ 3/1932 NWS Out of Workshops (20 days)
/ 4/1932 - Modified AC Allce LT
*L 663.VA - 31/ 7/1909 NWS Built new WHB
8/ 1/1932 NWS Into Workshops -
10/ 2/1932 NWS Out of Workshops (34 days)
/ 2/1932 - Modified Trans hook
/ 5/1932 - Modified AC Allce LT
.
Vehicle.............SV # Date...... Loc History............SV Notes
*L 664.VA - 31/ 7/1909 NWS Built new WHB
2/ 4/1932 NWS Into Workshops -
/ 4/1932 - Modified AC Allce LT
22/ 4/1932 NWS Out of Workshops (21 days)
*L 665.VA - 31/ 7/1909 NWS Built new WHB
5/ 3/1932 NWS Into Workshops -
/ 3/1932 - Modified AC Allce LT
21/ 3/1932 NWS Out of Workshops (17 days)
*L 666.VA - 31/ 7/1909 NWS Built new WHB
23/ 2/1932 NWS Into Workshops -
9/ 3/1932 NWS Out of Workshops (16 days)
/ 3/1932 - Modified AC Allce LT
*L 667.VA - 31/ 7/1909 NWS Built new WHB
27/ 2/1932 NWS Into Workshops -
17/ 3/1932 NWS Out of Workshops (20 days)
/ 3/1932 - Modified AC Allce LT
*L 668.VA - 31/ 7/1909 NWS Built new WHB
21/ 4/1932 NWS Into Workshops -
/ 5/1932 - Modified AC Allce LT
26/ 5/1932 NWS Out of Workshops (36 days)
*L 669.VA - 31/ 7/1909 NWS Built new WHB
18/12/1931 NWS Into Workshops -
9/ 1/1932 NWS Out of Workshops (23 days)
/ 1/1932 - Modified Trans hook
/ 5/1932 - Modified AC Allce LT
*L 670.VA - 7/ 8/1909 NWS Built new WHB
/11/1931 - Modified Trans hook
/ 5/1932 - Modified AC Allce LT
17/ 4/1980 BOW Sold (to) [CRS]: SimsMetal
*L 671.VA - 7/ 8/1909 NWS Built new WHB
6/ 4/1932 NWS Into Workshops -
19/ 4/1932 NWS Out of Workshops (14 days)
/ 4/1932 - Modified AC Allce LT
*L 672.VA - 7/ 8/1909 NWS Built new WHB
3/ 5/1932 NWS Into Workshops -
19/ 5/1932 NWS Out of Workshops (17 days)
/ 5/1932 - Modified AC Allce LT
24/ 9/1976 NET Photograph #673.22
*L 673.VA - 7/ 8/1909 NWS Built new WHB
27/ 2/1932 NWS Into Workshops -
11/ 3/1932 NWS Out of Workshops (14 days)
/ 3/1932 - Modified AC Allce LT
*L 674.VA - 7/ 8/1909 NWS Built new WHB
5/ 3/1932 NWS Into Workshops -
/ 3/1932 - Modified AC Allce LT
9/ 4/1932 NWS Out of Workshops (36 days)
/ /1971 - Scrapped R104
.
Vehicle.............SV # Date...... Loc History............SV Notes
*L 675.VA - 14/ 8/1909 NWS Built new WHB
/12/1931 - Modified Trans hook
/ 5/1932 - Modified AC Allce LT
*L 676.VA - 14/ 8/1909 NWS Built new WHB
16/ 1/1932 NWS Into Workshops -
17/ 2/1932 NWS Out of Workshops (33 days)
/ 2/1932 - Modified AC Allce LT
*L 677.VA - 14/ 8/1909 NWS Built new WHB
20/ 5/1932 NWS To LB 677.VA (35 days)
20/ 5/1932 NWS Into Workshops -
/ 6/1932 - Modified AC Allce LT
LB 677.VA - 17/ 1/1961 NWS Scrapped -
*L 678.VA - 14/ 8/1909 NWS Built new WHB
19/ 4/1932 NWS Into Workshops -
2/ 5/1932 NWS Out of Workshops (14 days)
/ 5/1932 - Modified AC Allce LT
11/ 2/1936 NWS Into Workshops -
24/ 7/1936 NWS Out of Workshops (50 days)
/ /1971 - Scrapped R104
*L 679.VA - 14/ 8/1909 NWS Built new WHB
19/ 3/1932 NWS Into Workshops -
/ 3/1932 - Modified AC Allce LT
5/ 4/1932 NWS Out of Workshops (18 days)
*L 680.VA - 14/ 8/1909 NWS Built new WHB, Iron, 3'6" wheels
/ 4/1922 - Modified 3 1/2" jrnals; 4 x 3'0" whls
30/ 3/1932 NWS Into Workshops -
13/ 4/1932 NWS Out of Workshops (15 days)
/ 4/1932 - Modified AC Allce LT
*L 681.VA - 21/ 8/1909 NWS Built new WHB
10/ 5/1932 NWS Into Workshops -
/ 6/1932 - Modified AC Allce LT
23/ 6/1932 NWS To LB 681.VA (45 days)
LB 681.VA - circa 1959 - To L 681.VA -
*L 681.VA - / /1975 - Scrapped RSN8/75
*L 682.VA - 21/ 8/1909 NWS Built new WHB
18/ 2/1932 NWS Into Workshops -
5/ 3/1932 NWS Out of Workshops (17 days)
/ 3/1932 - Modified AC Allce LT
/ /1969 - Scrapped -
*L 683.VA - 21/ 8/1909 NWS Built new WHB
24/ 5/1932 NWS Into Workshops -
/ 6/1932 - Modified AC Allce LT
16/ 6/1932 NWS To LB 683.VA (24 days)
*L 684.VA - 21/ 8/1909 NWS Built new WHB
/10/1931 - Modified Trans hook
/ 5/1932 - Modified AC Allce LT
.
Vehicle.............SV # Date...... Loc History............SV Notes
*L 685.VA - 21/ 8/1909 NWS Built new WHB
17/ 8/1931 NWS Into Workshops -
18/ 9/1931 NWS Out of Workshops (33 days)
/ 9/1931 - Modified Trans hook
/ 5/1932 - Modified AC Allce LT
*L 686.VA - 28/ 8/1909 NWS Built new WHB
11/12/1931 NWS Into Workshops -
4/ 1/1932 NWS Out of Workshops (25 days)
/ 1/1932 - Modified Trans hook
/ 5/1932 - Modified AC Allce LT
15/ 9/1936 NWS Into Workshops -
24/10/1936 NWS Out of Workshops (40 days)
*L 687.VA - 28/ 8/1909 NWS Built new WHB
3/ 5/1932 NWS Into Workshops -
18/ 5/1932 NWS Out of Workshops (16 days)
/ 5/1932 - Modified AC Allce LT
*L 688.VA - 28/ 8/1909 NWS Built new WHB
/11/1923 - Modified 4 1/2" journals
15/ 1/1932 NWS Into Workshops -
/ 1/1932 - Modified Trans hook
26/ 1/1932 NWS Out of Workshops (12 days)
/ 5/1932 - Modified AC Allce LT
*L 689.VA - 28/ 8/1909 NWS Built new WHB
27/ 2/1932 NWS Into Workshops -
11/ 3/1932 NWS Out of Workshops (14 days)
/ 3/1932 - Modified AC Allce LT
17/ 1/1961 NWS Scrapped -
*L 690.VA - 28/ 8/1909 NWS Built new WHB
19/ 3/1932 NWS Into Workshops -
/ 3/1932 - Modified AC Allce LT
5/ 4/1932 NWS Out of Workshops (18 days)
*L 691.VA - 28/ 8/1909 NWS Built new WHB
18/ 1/1932 NWS Into Workshops -
11/ 2/1932 NWS Out of Workshops (25 days)
/ 2/1932 - Modified AC Allce LT
*L 692.VA - 1/ 9/1909 NWS Built new WHB
23/12/1931 NWS Into Workshops -
13/ 1/1932 NWS Out of Workshops (22 days)
/ 1/1932 - Modified Trans hook
/ 5/1932 - Modified AC Allce LT
12/ 1/1961 NWS Scrapped -
*L 693.VA - 1/ 9/1909 NWS Built new WHB
2/ 4/1932 NWS Into Workshops -
19/ 4/1932 NWS Out of Workshops (18 days)
/ 4/1932 - Modified AC Allce LT
/ /1970 - Scrapped R104
.
Vehicle.............SV # Date...... Loc History............SV Notes
*L 694.VA - 1/ 9/1909 NWS Built new WHB
22/ 6/1931 NWS Into Workshops -
5/ 8/1931 NWS Out of Workshops (45 days)
/ 8/1931 - Modified Trans hook
/ 5/1932 - Modified AC Allce LT
/ /1972 - Scrapped R104
*L 695.VA - 1/ 9/1909 NWS Built new WHB
19/ 4/1932 NWS Into Workshops -
3/ 5/1932 NWS Out of Workshops (15 days)
/ 5/1932 - Modified AC Allce LT
/ /1971 - Scrapped R104
*L 696.VA - 3/ 9/1909 NWS Built new WHB
30/ 1/1932 NWS Into Workshops -
17/ 2/1932 NWS Out of Workshops (19 days)
/ 2/1932 - Modified AC Allce LT
*L 697.VA - 3/ 9/1909 NWS Built new WHB
8/ 3/1932 NWS Into Workshops -
/ 3/1932 - Modified AC Allce LT
9/ 4/1932 NWS Out of Workshops (33 days)
/ /1971 - Scrapped R104
*L 698.VA - 3/ 9/1909 NWS Built new WHB
11/12/1931 NWS Into Workshops -
/12/1931 - Modified Trans hook
23/12/1931 NWS Out of Workshops (13 days)
/ 4/1932 - Modified AC Allce LT
*L 699.VA - 3/ 9/1909 NWS Built new WHB
/ 6/1917 - Modified 4 1/2" journals
22/ 1/1932 NWS Into Workshops -
17/ 2/1932 NWS Out of Workshops (27 days)
/ 2/1932 - Modified AC Allce LT
*L 700.VA - 3/ 9/1909 NWS Built new WHB
29/ 1/1932 NWS Into Workshops -
17/ 2/1932 NWS Out of Workshops (20 days)
/ 2/1932 - Modified AC Allce LT
circa 1978 - Off Register [v]
13/ 4/1978 RAA Sighting [RO]
*L 701.VA - 3/ 9/1909 NWS Built new WHB
3/ 5/1932 NWS Into Workshops -
17/ 5/1932 NWS Out of Workshops (15 days)
/ 5/1932 - Modified AC Allce LT
*L 702.VA - 3/ 9/1909 NWS Built new WHB
/ 8/1911 - Modified Spiral Sprg cplrs
3/ 8/1931 NWS Into Workshops -
16/ 9/1931 NWS Out of Workshops (45 days)
/ 9/1931 - Modified Trans hook
/ 6/1932 - Modified AC Allce LT
/ 5/1967 NWS Photograph #9.31: part view
.
Vehicle.............SV # Date...... Loc History............SV Notes
*L 703.VA - 17/ 7/1911 NWS Built new WHB
11/12/1931 NWS Into Workshops -
/12/1931 - Modified Trans hook
23/12/1931 NWS Out of Workshops (13 days)
/ 5/1932 - Modified AC Allce LT
*L 704.VA - 17/ 7/1911 NWS Built new WHB
19/ 2/1932 NWS Into Workshops -
9/ 3/1932 NWS Out of Workshops (20 days)
/ 3/1932 - Modified AC Allce LT
*L 705.VA - 17/ 7/1911 NWS Built new WHB
8/ 3/1932 NWS Into Workshops -
/ 3/1932 - Modified AC Allce LT
23/ 3/1932 NWS Out of Workshops (16 days)
12/ 1/1961 NWS Scrapped -
*L 706.VA - 17/ 7/1911 NWS Built new WHB
14/ 5/1932 NWS Into Workshops -
/ 5/1932 - Modified AC Allce LT
27/ 5/1932 NWS Out of Workshops (14 days)
/ /1975 - Scrapped RSN4/75
*L 707.VA - 17/ 7/1911 NWS Built new WHB
/11/1931 - Modified Trans hook
/ 5/1932 - Modified AC Allce LT
*L 708.VA - 17/ 7/1911 NWS Built new WHB
19/ 6/1931 NWS Into Workshops -
12/ 8/1931 NWS Out of Workshops (50 days)
/ 8/1931 - Modified Trans hook
/ 5/1932 - Modified AC Allce LT
17/ 1/1961 NWS Scrapped -
*L 709.VA - 17/ 7/1911 NWS Built new WHB
/11/1931 - Modified Trans hook
/ 5/1932 - Modified AC Allce LT
*L 710.VA - 17/ 7/1911 NWS Built new WHB
20/10/1930 NWS Into Workshops -
28/11/1930 NWS Out of Workshops (40 days)
2/ 4/1932 NWS Into Workshops -
15/ 4/1932 NWS Out of Workshops (14 days)
/ 4/1932 - Modified AC Allce LT
3/ 3/1980 SRD Scrapped [CRS]
*L 711.VA - 17/ 7/1911 NWS Built new WHB
8/ 4/1932 NWS Into Workshops -
/ 4/1932 - Modified AC Allce LT
22/ 4/1932 NWS Out of Workshops (15 days)
*L 712.VA - 3/ 8/1911 NWS Built new WHB
6/ 4/1932 NWS Into Workshops -
/ 4/1932 - Modified AC Allce LT
21/ 4/1932 NWS Out of Workshops (16 days)
/ /1971 - Scrapped R104
.
Vehicle.............SV # Date...... Loc History............SV Notes
*L 713.VA - 3/ 8/1911 NWS Built new WHB
15/ 1/1932 NWS Into Workshops -
25/ 1/1932 NWS Out of Workshops (11 days)
/ 4/1932 - Modified Trans hook
/ 5/1932 - Modified AC Allce LT
*L 714.VA - 3/ 8/1911 NWS Built new WHB
13/10/1930 NWS Into Workshops -
26/11/1930 NWS Out of Workshops (45 days)
27/ 2/1932 NWS Into Workshops -
/ 3/1932 - Modified AC Allce LT
9/ 4/1932 NWS Out of Workshops (43 days)
*L 715.VA - 3/ 8/1911 NWS Built new WHB
30/ 3/1932 NWS Into Workshops -
15/ 4/1932 NWS Out of Workshops (17 days)
/ 4/1932 - Modified AC Allce LT
15/ 5/1980 BOW Sold (to) [CRS]: SimsMetal
*L 716.VA - 3/ 8/1911 NWS Built new WHB
17/ 5/1932 NWS Into Workshops -
30/ 5/1932 NWS Out of Workshops (14 days)
/ 6/1932 - Modified AC Allce LT
17/ 1/1961 NWS Scrapped -
*L 717.VA - 3/ 8/1911 NWS Built new WHB
23/ 2/1932 NWS Into Workshops -
9/ 3/1932 NWS Out of Workshops (16 days)
/ 3/1932 - Modified AC Allce LT
*L 718.VA - 3/ 8/1911 NWS Built new WHB
15/ 4/1932 NWS Into Workshops -
13/ 5/1932 NWS Out of Workshops (29 days)
/ 5/1932 - Modified AC Allce LT
*L 719.VA - 3/ 8/1911 NWS Built new WHB
15/ 4/1932 NWS Into Workshops -
/ 4/1932 - Modified AC Allce LT
29/ 4/1932 NWS Out of Workshops (15 days)
*L 720.VA - 3/ 8/1911 NWS Built new WHB
15/ 1/1931 NWS Into Workshops -
13/ 6/1931 NWS Out of Workshops (50 days)
24/ 5/1932 NWS Into Workshops -
/ 6/1932 - Modified AC Allce LT
16/ 6/1932 NWS To LB 720.VA (24 days)
LB 720.VA - circa 1957 - To L 720.VA (v)
*L 720.VA - 15/ 1/1981 - Off Register [CRS]
20/ 2/1981 BOW Scrapped [CRS]
*L 721.VA - 18/ 8/1911 NWS Built new WHB
24/ 2/1931 NWS Into Workshops -
22/ 4/1931 NWS Out of Workshops (50 days)
19/ 3/1932 NWS Into Workshops -
19/ 4/1932 NWS Out of Workshops (32 days)
/ 4/1932 - Modified AC Allce LT
.
Vehicle.............SV # Date...... Loc History............SV Notes
*L 722.VA - 18/ 8/1911 NWS Built new WHB
10/ 5/1932 NWS Into Workshops -
/ 6/1932 - Modified AC Allce LT
16/ 6/1932 NWS To LB 722.VA (38 days)
*L 723.VA - 18/ 8/1911 NWS Built new WHB
8/ 4/1932 NWS Into Workshops -
/ 4/1932 - Modified AC Allce LT
21/ 4/1932 NWS Out of Workshops (14 days)
*L 724.VA - 18/ 8/1911 NWS Built new WHB
3/ 5/1932 NWS Into Workshops -
19/ 5/1932 NWS Out of Workshops (17 days)
/ 5/1932 - Modified AC Allce LT
*L 725.VA - 18/ 8/1911 NWS Built new WHB
18/ 9/1930 NWS Into Workshops -
20/11/1930 NWS Out of Workshops (64 days)
8/ 4/1932 NWS Into Workshops -
/ 4/1932 - Modified AC Allce LT
21/ 4/1932 NWS Out of Workshops (14 days)
15/ 5/1980 BOW Off Register [CRS]
*L 726.VA - 18/ 8/1911 NWS Built new WHB
26/ 4/1932 NWS Into Workshops -
13/ 5/1932 NWS Out of Workshops (18 days)
/ 5/1932 - Modified AC Allce LT
*L 727.VA - 18/ 8/1911 NWS Built new WHB
26/ 4/1932 NWS Into Workshops -
17/ 5/1932 NWS Out of Workshops (22 days)
/ 5/1932 - Modified AC Allce LT
15/ 1/1981 - Off Register [CRS]
12/ 2/1981 BOW Scrapped [CRS]
*L 728.VA - 18/ 8/1911 NWS Built new WHB
/11/1931 - Modified Trans hook
/ 5/1932 - Modified AC Allce LT
/ 3/1955 NWS Modified Fitted 1 3/4" plain gratings
15/ 4/1979 ECH Photograph #1247.21
*L 729.VA - 18/ 8/1911 NWS Built new WHB
23/ 2/1932 NWS Into Workshops -
9/ 3/1932 NWS Out of Workshops (16 days)
/ 3/1932 - Modified AC Allce LT
12/ 1/1961 NWS Scrapped -
*L 730.VA - 4/ 9/1911 NWS Built new WHB
30/ 1/1931 NWS Into Workshops -
15/ 8/1931 NWS Out of Workshops (50 days)
/ 8/1931 - Modified Trans hook
/ 5/1932 - Modified AC Allce LT
6/ 7/1959 NWS Scrapped -
.
Vehicle.............SV # Date...... Loc History............SV Notes
*L 731.VA - 4/ 9/1911 NWS Built new WHB
23/ 2/1932 NWS Into Workshops -
9/ 3/1932 NWS Out of Workshops (16 days)
/ 3/1932 - Modified AC Allce LT
17/ 1/1961 NWS Scrapped -
*L 732.VA - 4/ 9/1911 NWS Built new WHB
10/ 5/1932 NWS Into Workshops -
/ 5/1932 - Modified AC Allce LT
23/ 5/1932 NWS Out of Workshops (14 days)
/ /1975 - Scrapped RSN5/75
*L 733.VA - 4/ 9/1911 NWS Built new WHB
21/ 5/1932 NWS Into Workshops -
/ 6/1932 - Modified AC Allce LT
15/ 6/1932 NWS To LB 733.VA (26 days)
LB 733.VA - 28/ 8/1954 - To L 733.VA -
*L 733.VA - 4/ 2/1960 SEL Scrapped -
*L 734.VA - 4/ 9/1911 NWS Built new WHB
3/ 8/1931 NWS Into Workshops -
10/ 9/1931 NWS Out of Workshops (39 days)
/ 9/1931 - Modified Trans hook
/ 5/1932 - Modified AC Allce LT
*L 735.VA - 4/ 9/1911 NWS Built new WHB
12/ 4/1932 NWS Into Workshops -
/ 4/1932 - Modified AC Allce LT
28/ 4/1932 NWS Out of Workshops (17 days)
12/ 1/1961 NWS Scrapped -
*L 736.VA - 4/ 9/1911 NWS Built new WHB
14/ 1/1932 NWS Into Workshops -
/ 1/1932 - Modified Trans hook
30/ 1/1932 NWS Out of Workshops (17 days)
/ 5/1932 - Modified AC Allce LT
*L 737.VA - 4/ 9/1911 NWS Built new WHB
15/ 1/1931 NWS Into Workshops -
23/ 6/1931 NWS Out of Workshops (50 days)
/12/1931 - Modified Trans hook
/ 5/1932 - Modified AC Allce LT
*L 738.VA - 4/ 9/1911 NWS Built new WHB
8/ 1/1931 NWS Into Workshops -
4/ 6/1931 NWS Out of Workshops (50 days)
10/ 5/1932 NWS Into Workshops -
/ 5/1932 - Modified AC Allce LT
24/ 5/1932 NWS Out of Workshops (15 days)
/ /1971 - Scrapped R104
*L 739.VA - 4/ 9/1911 NWS Built new WHB
/11/1931 - Modified Trans hook
/ 5/1932 - Modified AC Allce LT
17/ 1/1961 - Scrapped -
.
Vehicle.............SV # Date...... Loc History............SV Notes
*L 740.VA - 8/ 9/1911 NWS Built new WHB
8/ 4/1932 NWS Into Workshops -
/ 4/1932 - Modified AC Allce LT
23/ 4/1932 NWS Out of Workshops (16 days)
*L 741.VA - 8/ 9/1911 NWS Built new WHB
27/10/1930 NWS Into Workshops -
18/12/1930 NWS Out of Workshops (53 days)
3/ 5/1932 NWS Into Workshops -
19/ 5/1932 NWS Out of Workshops (17 days)
/ 5/1932 - Modified AC Allce LT
*L 742.VA - 8/ 9/1911 NWS Built new WHB
28/ 1/1932 NWS Into Workshops -
/ 2/1932 - Modified AC Allce LT
24/ 2/1932 NWS Out of Workshops (28 days)
*L 743.VA - 8/ 9/1911 NWS Built new WHB
9/ 1/1932 NWS Into Workshops -
17/ 2/1932 NWS Out of Workshops (40 days)
/ 2/1932 - Modified AC Allce LT
*L 744.VA - 8/ 9/1911 NWS Built new WHB
14/11/1930 NWS Into Workshops -
/ 8/1931 - Modified Trans hook
20/ 8/1931 NWS Out of Workshops (50 days)
/ 5/1932 - Modified AC Allce LT
*L 745.VA - 8/ 9/1911 NWS Built new WHB
30/ 1/1932 NWS Into Workshops -
/ 2/1932 - Modified AC Allce LT
22/ 2/1932 NWS Out of Workshops (24 days)
*L 746.VA - 8/ 9/1911 NWS Built new WHB
30/ 1/1932 NWS Into Workshops -
19/ 2/1932 NWS Out of Workshops (21 days)
/ 2/1932 - Modified AC Allce LT
22/12/1964 NWS To KCC 48.VA -
*L 747.VA - 8/ 9/1911 NWS Built new WHB
28/ 1/1932 NWS Into Workshops -
/ 2/1932 - Modified AC Allce LT
22/ 2/1932 NWS Out of Workshops (26 days)
*L 748.VA - 8/ 9/1911 NWS Built new WHB
28/11/1930 NWS Into Workshops -
10/ 6/1931 NWS Out of Workshops (50 days)
30/ 1/1932 NWS Into Workshops -
17/ 2/1932 NWS Out of Workshops (19 days)
/ 2/1932 - Modified AC Allce LT
.
Vehicle.............SV # Date...... Loc History............SV Notes
*L 749.VA - 8/ 9/1911 NWS Built new WHB
4/ 5/1931 NWS Into Workshops -
23/ 6/1931 NWS Out of Workshops (50 days)
19/ 2/1932 NWS Into Workshops -
5/ 3/1932 NWS Out of Workshops (16 days)
/ 3/1932 - Modified AC Allce LT
16/ 6/1970 SRD Scrapped -
*L 750.VA - 15/ 9/1911 NWS Built new WHB
11/ 3/1932 NWS Into Workshops -
30/ 3/1932 NWS Out of Workshops (20 days)
/ 4/1932 - Modified AC Allce LT
*L 751.VA - 15/ 9/1911 NWS Built new WHB
8/ 4/1932 NWS Into Workshops -
/ 4/1932 - Modified AC Allce LT
22/ 4/1932 NWS Out of Workshops (15 days)
17/ 1/1961 NWS Scrapped -
*L 752.VA - 15/ 9/1911 NWS Built new WHB
27/ 2/1932 NWS Into Workshops -
11/ 3/1932 NWS Out of Workshops (14 days)
/ 3/1932 - Modified AC Allce LT
/ /1974 - Scrapped RSN11/74
*L 753.VA - 15/ 9/1911 NWS Built new WHB
9/ 2/1932 NWS Into Workshops -
3/ 3/1932 NWS Out of Workshops (24 days)
/ 3/1932 - Modified AC Allce LT
*L 754.VA - 15/ 9/1911 NWS Built new WHB
3/ 5/1932 NWS Into Workshops -
/ 5/1932 - Modified AC Allce LT
20/ 5/1932 NWS Out of Workshops (18 days)
*L 755.VA - 15/ 9/1911 NWS Built new WHB
2/12/1930 NWS Into Workshops -
12/ 6/1931 NWS Out of Workshops (50 days)
21/ 5/1932 NWS Into Workshops -
/ 6/1932 - Modified AC Allce LT
15/ 6/1932 NWS To LB 755.VA (26 days)
LB 755.VA - circa 1954 - To L 755.VA -
*L 755.VA - / /1971 - Scrapped R104
*L 756.VA - 15/ 9/1911 NWS Built new WHB
26/ 4/1932 NWS Into Workshops -
10/ 5/1932 NWS Out of Workshops (15 days)
/ 5/1932 - Modified AC Allce LT
/ /1969 - Scrapped -
*L 757.VA - 15/ 9/1911 NWS Built new WHB
28/ 1/1932 NWS Into Workshops -
/ 2/1932 - Modified AC Allce LT
23/ 2/1932 NWS Out of Workshops (27 days)
.
Vehicle.............SV # Date...... Loc History............SV Notes
*L 758.VA - 15/ 9/1911 NWS Built new WHB
/12/1931 - Modified Trans hook
/ 5/1932 - Modified AC Allce LT
/ /1971 - Scrapped R104
*L 759.VA - 15/ 9/1911 NWS Built new WHB
/11/1931 - Modified Trans hook
/ 4/1932 - Modified AC Allce LT
*L 760.VA - 23/ 9/1911 NWS Built new WHB
28/ 1/1932 NWS Into Workshops -
/ 2/1932 - Modified AC Allce LT
24/ 2/1932 NWS Out of Workshops (28 days)
*L 761.VA - 23/ 9/1911 NWS Built new WHB
19/ 5/1932 NWS Into Workshops -
/ 6/1932 - Modified AC Allce LT
23/ 6/1932 NWS To LB 761.VA (36 days)
*L 762.VA - 23/ 9/1911 NWS Built new WHB
1/ 3/1932 NWS Into Workshops -
17/ 3/1932 NWS Out of Workshops (17 days)
/ 3/1932 - Modified AC Allce LT
*L 763.VA - 23/ 9/1911 NWS Built new WHB
8/ 4/1932 NWS Into Workshops -
/ 4/1932 - Modified AC Allce LT
28/ 4/1932 NWS Out of Workshops (21 days)
*L 764.VA - 23/ 9/1911 NWS Built new WHB
30/ 3/1932 NWS Into Workshops -
13/ 4/1932 NWS Out of Workshops (15 days)
/ 4/1932 - Modified AC Allce LT
*L 765.VA - 23/ 9/1911 NWS Built new WHB
9/ 1/1932 NWS Into Workshops -
11/ 2/1932 NWS Out of Workshops (34 days)
/ 2/1932 - Modified AC Allce LT
*L 766.VA - 23/ 9/1911 NWS Built new WHB
/10/1931 - Modified Trans hook
/ 5/1932 - Modified AC Allce LT
*L 767.VA - 23/ 9/1911 NWS Built new WHB
27/ 5/1932 NWS Into Workshops -
/ 6/1932 - Modified AC Allce LT
20/ 6/1932 NWS Out of Workshops (25 days)
/ /1970 - Scrapped R104: and 1971
*L 768.VA - 23/ 9/1911 NWS Built new WHB
16/ 5/1932 NWS Into Workshops -
31/ 5/1932 NWS Out of Workshops (16 days)
/ 6/1932 - Modified AC Allce LT
17/ 1/1961 NWS Scrapped -
.
Vehicle.............SV # Date...... Loc History............SV Notes
*L 769.VA - 23/ 9/1911 NWS Built new WHB
10/ 5/1932 NWS Into Workshops -
13/ 6/1932 NWS Out of Workshops (35 days)
/ 6/1932 - Modified AC Allce LT
17/ 1/1961 NWS Scrapped -
*L 770.VA - 30/ 9/1911 NWS Built new WHB
11/11/1930 NWS Into Workshops -
29/ 6/1931 NWS Out of Workshops (50 days)
14/ 5/1932 NWS Into Workshops -
1/ 6/1932 NWS Out of Workshops (19 days)
/ 6/1932 - Modified AC Allce LT
*L 771.VA - 30/ 9/1911 NWS Built new WHB
28/ 1/1932 NWS Into Workshops -
/ 2/1932 - Modified AC Allce LT
24/ 2/1932 NWS Out of Workshops (28 days)
*L 772.VA - 30/ 9/1911 NWS Built new WHB
12/ 1/1931 NWS Into Workshops -
22/ 7/1931 NWS Out of Workshops (50 days)
/ 8/1931 - Modified Trans hook
/ 5/1932 - Modified AC Allce LT
*L 773.VA - 30/ 9/1911 NWS Built new WHB
29/ 5/1931 NWS Into Workshops -
15/ 7/1931 NWS Out of Workshops (49 days)
/ 8/1931 - Modified Trans hook
/ 6/1932 - Modified AC Allce LT
*L 774.VA - 30/ 9/1911 NWS Built new WHB
8/ 3/1931 NWS Into Workshops -
2/ 6/1931 NWS Out of Workshops (50 days)
31/ 5/1932 NWS Into Workshops -
/ 6/1932 - Modified AC Allce LT
23/ 6/1932 NWS To LB 774.VA (24 days)
LB 774.VA - 17/ 1/1961 NWS Scrapped -
*L 775.VA - 30/ 9/1911 NWS Built new WHB
10/ 5/1932 NWS Into Workshops -
/ 6/1932 - Modified AC Allce LT
15/ 6/1932 NWS To LB 775.VA (37 days)
*L 776.VA - 30/ 9/1911 NWS Built new WHB
15/ 3/1932 NWS Into Workshops -
31/ 3/1932 NWS Out of Workshops (17 days)
/ 4/1932 - Modified AC Allce LT
17/ 1/1961 NWS Scrapped -
*L 777.VA - 30/ 9/1911 NWS Built new WHB
1/ 3/1932 NWS Into Workshops -
17/ 3/1932 NWS Out of Workshops (17 days)
/ 3/1932 - Modified AC Allce LT
24/ 4/1936 NWS Into Workshops -
25/ 7/1936 NWS Out of Workshops (50 days)
.
Vehicle.............SV # Date...... Loc History............SV Notes
*L 778.VA - 30/ 9/1911 NWS Built new WHB
17/ 6/1931 NWS Into Workshops -
22/ 7/1931 NWS Out of Workshops (36 days)
/ 8/1931 - Modified Trans hook
/ 5/1932 - Modified AC Allce LT
*L 779.VA - 30/ 9/1911 NWS Built new WHB
18/ 2/1932 NWS Into Workshops -
/ 3/1932 - Modified AC Allce LT
22/ 3/1932 NWS Out of Workshops (34 days)
18/ 5/1955 NWS Scrapped -
*L 780.VA - 6/10/1911 NWS Built new WHB
28/ 1/1932 NWS Into Workshops -
/ 2/1932 - Modified AC Allce LT
23/ 2/1932 NWS Out of Workshops (27 days)
8/11/1956 - Scrapped -
*L 781.VA - 6/10/1911 NWS Built new WHB
22/ 1/1932 NWS Into Workshops -
6/ 2/1932 NWS Out of Workshops (16 days)
/ 2/1932 - Modified AC Allce LT
*L 782.VA - 6/10/1911 NWS Built new WHB
14/ 5/1932 NWS Into Workshops -
31/ 5/1932 NWS Out of Workshops (18 days)
/ 6/1932 - Modified AC Allce LT
25/ 6/1981 - Off Register [CRS]
7/ 8/1981 BOW Scrapped [CRS]
*L 783.VA - 6/10/1911 NWS Built new WHB
30/ 3/1932 NWS Into Workshops -
13/ 4/1932 NWS Out of Workshops (15 days)
/ 4/1932 - Modified AC Allce LT
/ /1971 - Scrapped R104
*L 784.VA - 6/10/1911 NWS Built new WHB
26/11/1930 NWS Into Workshops -
/ 8/1931 - Modified Trans hook
21/ 8/1931 NWS Out of Workshops (50 days)
/ 5/1932 - Modified AC Allce LT
17/ 7/1980 TOT Off Register [CRS]: sighted 7/8/80
12/ 8/1980 - Scrapped [CRS]
*L 785.VA - 6/10/1911 NWS Built new WHB
/11/1931 - Modified Trans hook
/ 4/1932 - Modified AC Allce LT
*L 786.VA - 6/10/1911 NWS Built new WHB
10/ 5/1932 NWS Into Workshops -
/ 5/1932 - Modified AC Allce LT
21/ 5/1932 NWS Out of Workshops (12 days)
/ /1970 - Scrapped R104
.
Vehicle.............SV # Date...... Loc History............SV Notes
*L 787.VA - 6/10/1911 NWS Built new WHB
6/ 4/1932 NWS Into Workshops -
19/ 4/1932 NWS Out of Workshops (14 days)
/ 4/1932 - Modified AC Allce LT
25/ 9/1936 NWS Into Workshops -
12/11/1936 NWS Out of Workshops (49 days)
/ /1969 - Scrapped -
*L 788.VA - 6/10/1911 NWS Built new WHB
14/ 5/1932 NWS Into Workshops -
1/ 6/1932 NWS Out of Workshops (19 days)
/ 6/1932 - Modified AC Allce LT
*L 789.VA - 6/10/1911 NWS Built new WHB
7/ 4/1931 NWS Into Workshops -
3/ 6/1931 NWS Out of Workshops (50 days)
6/ 4/1932 NWS Into Workshops -
15/ 4/1932 NWS Out of Workshops (10 days)
/ 4/1932 - Modified AC Allce LT
/ /1971 - Scrapped R104
*L 790.VA - 17/10/1911 NWS Built new WHB
27/ 2/1932 NWS Into Workshops -
/ 3/1932 - Modified AC Allce LT
9/ 4/1932 NWS Out of Workshops (43 days)
*L 791.VA - 17/10/1911 NWS Built new WHB
/11/1931 - Modified Trans hook
/ 4/1932 - Modified AC Allce LT
5/ 6/1980 NWS Sold (to) [CRS]: to Sims
17/ 7/1980 - Off Register [CRS]
*L 792.VA - 17/10/1911 NWS Built new WHB
19/ 4/1932 NWS Into Workshops -
3/ 5/1932 NWS Out of Workshops (15 days)
/ 5/1932 - Modified AC Allce LT
28/ 4/1960 NWS Scrapped -
*L 793.VA - 17/10/1911 NWS Built new WHB
/11/1931 - Modified Trans hook
/ 5/1932 - Modified AC Allce LT
*L 794.VA - 17/10/1911 NWS Built new WHB
6/ 1/1932 NWS Into Workshops -
15/ 1/1932 NWS Out of Workshops (10 days)
/ 1/1932 - Modified Trans hook
/ 5/1932 - Modified AC Allce LT
*L 795.VA - 17/10/1911 NWS Built new WHB
/10/1931 - Modified Trans hook
/ 5/1932 - Modified AC Allce LT
8/ 6/1960 NWS Scrapped "late report 7/60"
*L 796.VA - 17/10/1911 NWS Built new WHB
22/ 3/1932 NWS Into Workshops -
11/ 4/1932 NWS Out of Workshops (21 days)
/ 4/1932 - Modified AC Allce LT
.
Vehicle.............SV # Date...... Loc History............SV Notes
*L 797.VA - 17/10/1911 NWS Built new WHB
14/ 1/1932 NWS Into Workshops -
/ 1/1932 - Modified Trans hook
29/ 1/1932 NWS Out of Workshops (16 days)
/ 5/1932 - Modified AC Allce LT
22/ 6/1984 - Off Register [CRS]
*L 798.VA - 17/10/1911 NWS Built new WHB
1/ 3/1932 NWS Into Workshops -
17/ 3/1932 NWS Out of Workshops (17 days)
/ 3/1932 - Modified AC Allce LT
*L 799.VA - 17/10/1911 NWS Built new WHB
29/ 3/1932 NWS Into Workshops -
11/ 4/1932 NWS Out of Workshops (14 days)
/ 4/1932 - Modified AC Allce LT
*L 800.VA - 17/10/1911 NWS Built new WHB
8/ 1/1932 NWS Into Workshops -
19/ 1/1932 NWS Out of Workshops (12 days)
/ 1/1932 - Modified Trans hook
/ 5/1932 - Modified AC Allce LT
/ /1970 - Scrapped R104
*L 801.VA - 17/10/1911 NWS Built new WHB
2/ 4/1932 NWS Into Workshops -
/ 4/1932 - Modified AC Allce LT
22/ 4/1932 NWS Out of Workshops (21 days)
17/ 1/1961 NWS Scrapped -
*L 802.VA - 17/10/1911 NWS Built new WHB
8/ 1/1932 NWS Into Workshops -
/ 1/1932 - Modified Trans hook
30/ 1/1932 NWS Out of Workshops (23 days)
/ 4/1932 - Modified AC Allce LT
/ /1970 - Scrapped R104
*L 803.VA - 24/ 8/1912 NWS Built new WHB
5/ 8/1931 NWS Into Workshops -
8/ 9/1931 NWS Out of Workshops (35 days)
/ 9/1931 - Modified Trans hook
/ 4/1932 - Modified AC Allce LT
*L 804.VA - 24/ 8/1912 NWS Built new WHB
27/ 2/1932 NWS Into Workshops -
17/ 3/1932 NWS Out of Workshops (20 days)
/ 3/1932 - Modified AC Allce LT
*L 805.VA - 24/ 8/1912 NWS Built new WHB
15/12/1931 NWS Into Workshops -
16/ 1/1932 NWS Out of Workshops (33 days)
/ 1/1932 - Modified Trans hook
/ 4/1932 - Modified AC Allce LT
3/ 3/1960 SER Scrapped -
.
Vehicle.............SV # Date...... Loc History............SV Notes
*L 806.VA - 24/ 8/1912 NWS Built new WHB
15/ 1/1932 NWS Into Workshops -
/ 1/1932 - Modified Trans hook
25/ 1/1932 NWS Out of Workshops (11 days)
/ 5/1932 - Modified AC Allce LT
*L 807.VA - 24/ 8/1912 NWS Built new WHB
3/ 5/1932 NWS Into Workshops -
/ 5/1932 - Modified AC Allce LT
25/ 5/1932 NWS Out of Workshops (23 days)
*L 808.VA - 24/ 8/1912 NWS Built new WHB
/10/1931 - Modified Trans hook
/ 5/1932 - Modified AC Allce LT
15/ 5/1980 BOW Off Register [CRS]
*L 809.VA - 24/ 8/1912 NWS Built new WHB
8/12/1931 NWS Into Workshops -
12/ 1/1932 NWS Out of Workshops (36 days)
/ 1/1932 - Modified Trans hook
/ 5/1932 - Modified AC Allce LT
*L 810.VA - 24/ 8/1912 NWS Built new WHB
1/ 3/1932 NWS Into Workshops -
/ 3/1932 - Modified AC Allce LT
23/ 3/1932 NWS Out of Workshops (23 days)
*L 811.VA - 24/ 8/1912 NWS Built new WHB
10/ 5/1932 NWS Into Workshops -
/ 6/1932 - Modified AC Allce LT
15/ 6/1932 NWS To LB 811.VA (37 days)
*L 812.VA - 29/ 8/1912 NWS Built new WHB
8/ 1/1932 NWS Into Workshops -
28/ 1/1932 NWS Out of Workshops (21 days)
/ 5/1932 - Modified Auto cpled R1: TH (X'd)
*L 813.VA - 29/ 8/1912 NWS Built new WHB
/10/1931 - Modified Trans hook
/ 5/1932 - Modified AC Allce LT
*L 814.VA - 29/ 8/1912 NWS Built new WHB
22/ 6/1931 NWS Into Workshops -
5/ 8/1931 NWS Out of Workshops (45 days)
/ 8/1931 - Modified Trans hook
/ 5/1932 - Modified AC Allce LT
*L 815.VA - 29/ 8/1912 NWS Built new WHB
27/ 2/1932 NWS Into Workshops -
11/ 3/1932 NWS Out of Workshops (14 days)
/ 3/1932 - Modified AC Allce LT
/ /1971 - Scrapped R104
*L 816.VA - 29/ 8/1912 NWS Built new WHB
/10/1931 - Modified Trans hook
/ 4/1932 - Modified AC Allce LT
.
Vehicle.............SV # Date...... Loc History............SV Notes
*L 817.VA - 29/ 8/1912 NWS Built new WHB
5/ 1/1931 NWS Into Workshops -
20/ 4/1931 NWS Out of Workshops (50 days)
15/ 4/1932 NWS Into Workshops -
/ 4/1932 - Modified AC Allce LT
30/ 4/1932 NWS Out of Workshops (16 days)
*L 818.VA - 29/ 8/1912 NWS Built new WHB
/12/1931 - Modified Trans hook
/ 5/1932 - Modified AC Allce LT
3/ 3/1960 SER Scrapped -
*L 819.VA - 29/ 8/1912 NWS Built new WHB
30/ 3/1931 NWS Into Workshops -
1/ 6/1931 NWS Out of Workshops (50 days)
28/ 1/1932 NWS Into Workshops -
11/ 3/1932 NWS Out of Workshops (44 days)
/ 3/1932 - Modified Trans hook
/ 5/1932 - Modified AC Allce LT
/ /1970 - Scrapped R104
*L 820.VA - 4/ 9/1912 NWS Built new WHB
26/ 4/1932 NWS Into Workshops -
10/ 5/1932 NWS Out of Workshops (15 days)
/ 5/1932 - Modified AC Allce LT
22/ 6/1984 - Off Register [CRS]
*L 821.VA - 4/ 9/1912 NWS Built new WHB
8/ 1/1932 NWS Into Workshops -
9/ 2/1932 NWS Out of Workshops (33 days)
/ 2/1932 - Modified Trans hook
/ 5/1932 - Modified AC Allce LT
*L 822.VA - 4/ 9/1912 NWS Built new WHB
5/ 3/1932 NWS Into Workshops -
/ 3/1932 - Modified AC Allce LT
21/ 3/1932 NWS Out of Workshops (17 days)
*L 823.VA - 4/ 9/1912 NWS Built new WHB
13/ 3/1931 NWS Into Workshops -
15/ 5/1931 NWS Out of Workshops (50 days)
12/ 4/1932 NWS Into Workshops -
/ 4/1932 - Modified AC Allce LT
28/ 4/1932 NWS Out of Workshops (17 days)
*L 824.VA - 4/ 9/1912 NWS Built new WHB
30/ 3/1932 NWS Into Workshops -
15/ 4/1932 NWS Out of Workshops (17 days)
/ 4/1932 - Modified AC Allce LT
17/ 1/1961 NWS Scrapped -
*L 825.VA - 4/ 9/1912 NWS Built new WHB
30/ 4/1932 NWS Into Workshops -
18/ 5/1932 NWS Out of Workshops (19 days)
/ 5/1932 - Modified AC Allce LT
.
Vehicle.............SV # Date...... Loc History............SV Notes
*L 826.VA - 4/ 9/1912 NWS Built new WHB
4/11/1930 NWS Into Workshops -
23/12/1930 NWS Out of Workshops (50 days)
/11/1931 - Modified Trans hook
/ 4/1932 - Modified AC Allce LT
*L 827.VA - 4/ 9/1912 NWS Built new WHB
27/ 3/1931 NWS Into Workshops -
4/ 6/1931 NWS Out of Workshops (50 days)
19/ 3/1932 NWS Into Workshops -
11/ 4/1932 NWS Out of Workshops (24 days)
/ 4/1932 - Modified AC Allce LT
*L 828.VA - 4/ 9/1912 NWS Built new WHB
19/ 2/1932 NWS Into Workshops -
5/ 3/1932 NWS Out of Workshops (16 days)
/ 3/1932 - Modified AC Allce LT
13/ 2/1985 - Off Register [CRS]
*L 829.VA - 4/ 9/1912 NWS Built new WHB
22/ 1/1932 NWS Into Workshops -
6/ 2/1932 NWS Out of Workshops (16 days)
/ 2/1932 - Modified AC Allce LT
circa 1978 - Off Register [v]
13/ 4/1978 RAA Sighting [RO]
*L 830.VA - 10/ 9/1912 NWS Built new WHB
20/10/1930 NWS Into Workshops -
9/12/1930 NWS Out of Workshops (51 days)
26/ 4/1932 NWS Into Workshops -
9/ 5/1932 NWS Out of Workshops (14 days)
/ 5/1932 - Modified AC Allce LT
/ /1971 - Scrapped R104
*L 831.VA - 10/ 9/1912 NWS Built new WHB
29/ 1/1932 NWS Into Workshops -
17/ 2/1932 NWS Out of Workshops (20 days)
/ 2/1932 - Modified AC Allce LT
*L 832.VA - 10/ 9/1912 NWS Built new WHB
15/ 3/1932 NWS Into Workshops -
/ 3/1932 - Modified AC Allce LT
2/ 4/1932 NWS Out of Workshops (19 days)
*L 833.VA - 10/ 9/1912 NWS Built new WHB
14/ 5/1932 NWS Into Workshops -
/ 5/1932 - Modified AC Allce LT
27/ 5/1932 NWS Out of Workshops (14 days)
*L 834.VA - 10/ 9/1912 NWS Built new WHB
24/11/1931 NWS Into Workshops -
18/12/1931 NWS Out of Workshops (25 days)
/12/1931 - Modified Trans hook
/ 4/1932 - Modified AC Allce LT
/ /1972 - Scrapped R104
.
Vehicle.............SV # Date...... Loc History............SV Notes
*L 835.VA - 10/ 9/1912 NWS Built new WHB
/ 8/1932 - Modified AC Allce LT
/ /1971 - Scrapped R104
*L 836.VA - 10/ 9/1912 NWS Built new WHB
3/ 5/1932 NWS Into Workshops -
/ 7/1932 - Modified AC Allce LT
7/ 7/1932 NWS To LB 836.VA (50 days)
*L 837.VA - 10/ 9/1912 NWS Built new WHB
21/ 5/1932 NWS Into Workshops -
/ 7/1932 - Modified AC Allce LT
22/ 7/1932 NWS Out of Workshops (50 days)
/ /1970 - Scrapped R104
*L 838.VA - 10/ 9/1912 NWS Built new WHB
29/ 1/1932 NWS Into Workshops -
/ 2/1932 - Modified AC Allce LT
22/ 2/1932 NWS Out of Workshops (25 days)
*L 839.VA - 10/ 9/1912 NWS Built new WHB
10/ 5/1932 NWS Into Workshops -
/ 5/1932 - Modified AC Allce LT
23/ 5/1932 NWS Out of Workshops (14 days)
*L 840.VA - 10/ 9/1912 NWS Built new WHB
8/ 4/1932 NWS Into Workshops -
/ 4/1932 - Modified AC Allce LT
28/ 4/1932 NWS Out of Workshops (21 days)
14/ 1/1936 NWS Into Workshops -
1/ 4/1936 NWS Out of Workshops (50 days)
17/ 1/1961 NWS Scrapped -
*L 841.VA - 10/ 9/1912 NWS Built new WHB
1/ 7/1931 NWS Into Workshops -
19/ 8/1931 NWS Out of Workshops (50 days)
/ 8/1931 - Modified Trans hook
/ 5/1932 - Modified AC Allce LT
30/ 5/1984 - Off Register [CRS]
*L 842.VA - 17/ 9/1912 NWS Built new WHB
29/ 3/1932 NWS Into Workshops -
13/ 4/1932 NWS Out of Workshops (16 days)
/ 4/1932 - Modified AC Allce LT
*L 843.VA - 17/ 9/1912 NWS Built new WHB
4/12/1931 NWS Into Workshops -
9/ 1/1932 NWS Out of Workshops (37 days)
/ 1/1932 - Modified Trans hook
/ 4/1932 - Modified AC Allce LT
13/ 5/1981 - Off Register [CRS]
10/ 7/1981 BOW Sold (to) [CRS]
.
Vehicle.............SV # Date...... Loc History............SV Notes
*L 844.VA - 17/ 9/1912 NWS Built new WHB
21/ 5/1932 NWS Into Workshops -
/ 6/1932 - Modified AC Allce LT
16/ 6/1932 NWS To LB 844.VA (27 days)
LB 844.VA - 11/ 9/1954 NMW To L 844.VA (W/E)
*L 845.VA - 17/ 9/1912 NWS Built new WHB
24/11/1931 NWS Into Workshops -
/12/1931 - Modified Trans hook
22/12/1931 NWS Out of Workshops (29 days)
/ 5/1932 - Modified AC Allce LT
*L 846.VA - 17/ 9/1912 NWS Built new WHB
3/ 5/1932 NWS Into Workshops -
/ 5/1932 - Modified AC Allce LT
21/ 5/1932 NWS Out of Workshops (19 days)
/ /1969 - Scrapped -
*L 847.VA - 17/ 9/1912 NWS Built new WHB
2/12/1930 NWS Into Workshops -
/ 8/1931 - Modified Trans hook
27/ 8/1931 NWS Out of Workshops (50 days)
/ 5/1932 - Modified AC Allce LT
*L 848.VA - 17/ 9/1912 NWS Built new WHB
/ 9/1931 - Modified Trans hook
/ 5/1932 - Modified AC Allce LT
*L 849.VA - 17/ 9/1912 NWS Built new WHB
24/ 5/1932 NWS Into Workshops -
/ 6/1932 - Modified AC Allce LT
16/ 6/1932 NWS To LB 849.VA (24 days)
LB 849.VA - 7/ 8/1936 NWS Into Workshops (with LB 126)
29/ 9/1936 NWS Out of Workshops (50 days)
*L 850.VA - 17/ 9/1912 NWS Built new WHB
1/ 3/1932 NWS Into Workshops -
17/ 3/1932 NWS Out of Workshops (17 days)
/ 3/1932 - Modified AC Allce LT
*L 851.VA - 17/ 9/1912 NWS Built new WHB
24/ 2/1931 NWS Into Workshops -
17/ 4/1931 NWS Out of Workshops (50 days)
3/ 5/1932 NWS Into Workshops -
18/ 5/1932 NWS Out of Workshops (16 days)
/ 5/1932 - Modified AC Allce LT
*L 852.VA - 17/ 9/1912 NWS Built new WHB
17/ 3/1932 NWS Into Workshops -
/ 3/1932 - Modified AC Allce LT
7/ 4/1932 NWS Out of Workshops (22 days)
12/ 4/1933 NWS Into Workshops -
1/11/1933 NWS Out of Workshops (50 days)
/ /1970 - Scrapped R104
*L 853.VA - 21/ 9/1912 NWS Built new WHB
/ 8/1932 - Modified AC Allce LT
.
Vehicle.............SV # Date...... Loc History............SV Notes
*L 854.VA - 21/ 9/1912 NWS Built new WHB
19/ 4/1932 NWS Into Workshops -
3/ 5/1932 NWS Out of Workshops (15 days)
/ 5/1932 - Modified AC Allce LT
*L 855.VA - 21/ 9/1912 NWS Built new WHB
17/ 3/1932 NWS Into Workshops -
/ 3/1932 - Modified AC Allce LT
5/ 4/1932 NWS Out of Workshops (20 days)
*L 856.VA - 21/ 9/1912 NWS Built new WHB
6/10/1930 NWS Into Workshops -
20/11/1930 NWS Out of Workshops (46 days)
23/ 4/1932 NWS Into Workshops -
5/ 5/1932 NWS Out of Workshops (13 days)
/ 5/1932 - Modified AC Allce LT
/ /1970 - Scrapped R104
*L 857.VA - 21/ 9/1912 NWS Built new WHB
2/12/1930 NWS Into Workshops -
/ 8/1931 - Modified Trans hook
28/ 8/1931 NWS Out of Workshops (50 days)
/ 5/1932 - Modified AC Allce LT
*L 858.VA - 26/ 9/1912 NWS Built new WHB
/10/1931 - Modified Trans hook
/ 5/1932 - Modified AC Allce LT
*L 859.VA - 26/ 9/1912 NWS Built new WHB
1/ 3/1932 NWS Into Workshops -
17/ 3/1932 NWS Out of Workshops (17 days)
/ 3/1932 - Modified AC Allce LT
17/ 2/1933 NWS Into Workshops -
31/10/1933 NWS Out of Workshops (50 days)
6/ 7/1959 NWS Scrapped -
*L 860.VA - 26/ 9/1912 NWS Built new WHB
11/ 3/1931 NWS Into Workshops -
13/ 5/1931 NWS Out of Workshops (50 days)
30/ 3/1932 NWS Into Workshops -
13/ 4/1932 NWS Out of Workshops (15 days)
/ 4/1932 - Modified AC Allce LT
20/ 7/1981 - Off Register [CRS]
28/ 8/1981 BOW Scrapped [CRS]
*L 861.VA - 26/ 9/1912 NWS Built new WHB
/12/1931 - Modified Trans hook
/ 4/1932 - Modified AC Allce LT
/ /1970 - Scrapped R104
*L 862.VA - 26/ 9/1912 NWS Built new WHB
3/ 5/1932 NWS Into Workshops -
19/ 5/1932 NWS Out of Workshops (17 days)
/ 5/1932 - Modified AC Allce LT
.
Vehicle.............SV # Date...... Loc History............SV Notes
*L 863.VA - 28/ 9/1912 NWS Built new WHB
23/12/1931 NWS Into Workshops -
/ 1/1932 - Modified Trans hook
26/ 1/1932 NWS Out of Workshops (35 days)
/ 5/1932 - Modified AC Allce LT
3/ 3/1960 SER Scrapped -
*L 864.VA - 28/ 9/1912 NWS Built new WHB
29/ 3/1932 NWS Into Workshops -
11/ 4/1932 NWS Out of Workshops (14 days)
/ 4/1932 - Modified AC Allce LT
*L 865.VA - 28/ 9/1912 NWS Built new WHB
22/ 1/1931 NWS Into Workshops -
19/ 6/1931 NWS Out of Workshops (50 days)
9/12/1931 NWS Into Workshops -
18/12/1931 NWS Out of Workshops (10 days)
/12/1931 - Modified Trans hook
/ 5/1932 - Modified AC Allce LT
*L 866.VA - 28/ 9/1912 NWS Built new WHB
23/ 2/1931 NWS Into Workshops -
30/ 4/1931 NWS Out of Workshops (50 days)
19/ 3/1932 NWS Into Workshops -
/ 3/1932 - Modified AC Allce LT
11/ 4/1932 NWS Out of Workshops (24 days)
*L 867.VA - 28/ 9/1912 NWS Built new WHB
5/ 3/1931 NWS Into Workshops -
2/ 5/1931 NWS Out of Workshops (50 days)
23/12/1931 NWS Into Workshops -
12/ 1/1932 NWS Out of Workshops (21 days)
/ 1/1932 - Modified Trans hook
/ 5/1932 - Modified AC Allce LT
17/ 1/1961 NWS Scrapped -
*L 868.VA - 28/ 9/1912 NWS Built new WHB
/10/1931 - Modified Trans hook
/ 5/1932 - Modified AC Allce LT
20/ 7/1981 - Off Register [CRS]
28/ 8/1981 BOW Scrapped [CRS]
*L 869.VA - 28/ 9/1912 NWS Built new WHB
9/ 2/1932 NWS Into Workshops -
1/ 3/1932 NWS Out of Workshops (22 days)
/ 3/1932 - Modified AC Allce LT
6/ 7/1959 NWS Scrapped -
*L 870.VA - 28/ 9/1912 NWS Built new WHB
3/ 7/1931 NWS Into Workshops -
/ 8/1931 - Modified Trans hook
21/ 8/1931 NWS Out of Workshops (50 days)
/ 5/1932 - Modified AC Allce LT
*L 871.VA - 28/ 9/1912 NWS Built new WHB
/ 3/1932 - Modified AC Allce LT
.
Vehicle.............SV # Date...... Loc History............SV Notes
*L 872.VA - 28/ 9/1912 NWS Built new WHB
18/12/1931 NWS Into Workshops -
/ 1/1932 - Modified Trans hook
21/ 1/1932 NWS Out of Workshops (35 days)
/ 5/1932 - Modified AC Allce LT
*L 873.VA - 28/ 9/1912 NWS Built new WHB
5/ 3/1932 NWS Into Workshops -
/ 3/1932 - Modified AC Allce LT
22/ 3/1932 NWS Out of Workshops (18 days)
22/ 9/1936 NWS Into Workshops -
13/11/1936 NWS Out of Workshops (50 days)
12/ 1/1961 NWS Scrapped -
*L 874.VA - 3/10/1912 NWS Built new WHB
/ 3/1932 - Modified AC Allce LT (R15: 4/32)
30/ 3/1932 NWS Into Workshops -
13/ 4/1932 NWS Out of Workshops (15 days)
*L 875.VA - 3/10/1912 NWS Built new WHB
22/12/1930 NWS Into Workshops -
19/ 8/1931 NWS Out of Workshops (50 days)
/ 8/1931 - Modified Trans hook
27/ 2/1932 NWS Into Workshops -
11/ 3/1932 NWS Out of Workshops (14 days)
/ 5/1932 - Modified AC Allce LT
7/ 4/1936 NWS Into Workshops -
25/ 8/1936 NWS Out of Workshops (50 days)
6/ 7/1959 NWS Scrapped -
*L 876.VA - 3/10/1912 NWS Built new WHB
28/ 1/1932 NWS Into Workshops -
/ 2/1932 - Modified AC Allce LT
22/ 2/1932 NWS Out of Workshops (26 days)
*L 877.VA - 3/10/1912 NWS Built new WHB
/11/1931 - Modified Trans hook
/ 5/1932 - Modified AC Allce LT
*L 878.VA - 3/10/1912 NWS Built new WHB
12/ 4/1932 NWS Into Workshops -
/ 4/1932 - Modified AC Allce LT
28/ 4/1932 NWS Out of Workshops (17 days)
*L 879.VA - 3/10/1912 NWS Built new WHB
19/ 2/1932 NWS Into Workshops -
5/ 3/1932 NWS Out of Workshops (16 days)
/ 3/1932 - Modified AC Allce LT
1/11/1935 NWS Into Workshops -
17/ 2/1936 NWS Out of Workshops (50 days)
*L 880.VA - 3/10/1912 NWS Built new WHB
8/ 4/1932 NWS Into Workshops -
/ 4/1932 - Modified AC Allce LT
23/ 4/1932 NWS Out of Workshops (16 days)
.
Vehicle.............SV # Date...... Loc History............SV Notes
*L 881.VA - 3/10/1912 NWS Built new WHB
12/ 4/1932 NWS Into Workshops -
/ 4/1932 - Modified AC Allce LT
27/ 4/1932 NWS Out of Workshops (16 days)
*L 882.VA - 3/10/1912 NWS Built new WHB
28/ 1/1932 NWS Into Workshops -
/ 2/1932 - Modified AC Allce LT
22/ 2/1932 NWS Out of Workshops (26 days)
13/ 3/1934 NWS Into Workshops -
20/10/1934 NWS Out of Workshops (50 days)
*L 883.VA - 3/10/1912 NWS Built new WHB
17/ 5/1932 NWS Into Workshops -
/ 7/1932 - Modified AC Allce LT
20/ 7/1932 NWS Out of Workshops (50 days)
*L 884.VA - 3/10/1912 NWS Built new WHB
15/ 8/1931 NWS Into Workshops -
11/ 9/1931 NWS Out of Workshops (38 days)
/ 9/1931 - Modified Trans hook
/ 5/1932 - Modified AC Allce LT
*L 885.VA - 3/10/1912 NWS Built new WHB
/11/1931 - Modified Trans hook
/ 5/1932 - Modified AC Allce LT
17/ 1/1961 NWS Scrapped -
*L 886.VA - 3/10/1912 NWS Built new WHB
1/ 3/1932 NWS Into Workshops -
1/ 4/1932 NWS Out of Workshops (32 days)
/ 4/1932 - Modified AC Allce LT
5/ 3/1937 NWS Into Workshops -
19/ 7/1937 NWS Out of Workshops (50 days)
17/ 1/1961 NWS Scrapped -
*L 887.VA - 3/10/1912 NWS Built new WHB
14/11/1930 NWS Into Workshops -
/ 8/1931 - Modified -
26/ 8/1931 NWS Out of Workshops (50 days)
/ 4/1932 - Modified AC Allce LT
15/ 5/1980 BOW Off Register [CRS]
19/ 9/1980 BOW Scrapped [CRS]
*L 888.VA - 8/10/1912 NWS Built new WHB
22/ 3/1932 NWS Into Workshops -
11/ 4/1932 NWS Out of Workshops (21 days)
/ 4/1932 - Modified AC Allce LT
*L 889.VA - 8/10/1912 NWS Built new WHB
15/ 4/1932 NWS Into Workshops -
/ 7/1932 - Modified AC Allce LT
7/ 7/1932 NWS To LB 889.VA (50 days)
LB 889.VA - 3/ 4/1936 NWS Into Workshops -
28/ 7/1936 NWS Out of Workshops (50 days)
circa 1959 - To L 889.VA -
*L 889.VA - / /1976 - Scrapped RSN4/76
.
Vehicle.............SV # Date...... Loc History............SV Notes
*L 890.VA - 8/10/1912 NWS Built new WHB
22/ 1/1932 NWS Into Workshops -
/ 4/1932 - Modified AC Allce LT
28/ 4/1932 NWS Out of Workshops (50 days)
6/ 6/1957 ING Destroyed 57/7147
*L 891.VA - 8/10/1912 NWS Built new WHB
4/ 5/1931 NWS Into Workshops -
23/ 6/1931 NWS Out of Workshops (50 days)
15/ 3/1932 NWS Into Workshops -
31/ 3/1932 NWS Out of Workshops (17 days)
/ 4/1932 - Modified AC Allce LT
*L 892.VA - 8/10/1912 NWS Built new WHB
21/ 5/1932 NWS Into Workshops -
/ 7/1932 - Modified AC Allce LT
7/ 7/1932 NWS To LB 892.VA (48 days)
*L 893.VA - 8/10/1912 NWS Built new WHB
/ 9/1919 - Modified 4 1/2" journals
15/ 3/1932 NWS Into Workshops -
31/ 3/1932 NWS Out of Workshops (17 days)
/ 4/1932 - Modified AC Allce LT
20/ 3/1936 NWS Into Workshops -
5/ 8/1936 NWS Out of Workshops (50 days)
13/ 5/1981 - Off Register [CRS]
10/ 7/1981 BOW Sold (to) [CRS]
*L 894.VA - 8/10/1912 NWS Built new WHB
27/ 1/1931 NWS Into Workshops -
25/ 5/1931 NWS Out of Workshops (50 days)
/11/1931 - Modified Trans hook
/ 5/1932 - Modified AC Allce LT
*L 895.VA - 8/10/1912 NWS Built new WHB
24/ 2/1931 NWS Into Workshops -
20/ 4/1931 NWS Out of Workshops (50 days)
6/ 4/1932 NWS Into Workshops -
19/ 4/1932 NWS Out of Workshops (14 days)
/ 4/1932 - Modified AC Allce LT
*L 896.VA - 11/10/1912 NWS Built new WHB
16/ 2/1932 NWS Into Workshops -
3/ 3/1932 NWS Out of Workshops (17 days)
/ 3/1932 - Modified AC Allce LT
19/ 1/1934 NWS Into Workshops -
19/10/1934 NWS Out of Workshops (50 days)
/ /1976 - Scrapped RSN10/76
*L 897.VA - 11/10/1912 NWS Built new WHB
6/ 4/1932 NWS Into Workshops -
19/ 4/1932 NWS Out of Workshops (14 days)
/ 4/1932 - Modified AC Allce LT
20/ 1/1933 NWS Into Workshops -
31/10/1933 NWS Out of Workshops (50 days)
17/ 1/1961 NWS Scrapped -
.
Vehicle.............SV # Date...... Loc History............SV Notes
*L 898.VA - 11/10/1912 NWS Built new WHB
24/ 7/1931 NWS Into Workshops -
/ 8/1931 - Modified Trans hook
27/ 8/1931 NWS Out of Workshops (35 days)
/ 4/1932 - Modified AC Allce LT
12/ 7/1935 NWS Into Workshops -
5/10/1935 NWS Out of Workshops (50 days)
*L 899.VA - 11/10/1912 NWS Built new WHB
6/ 4/1932 NWS Into Workshops -
19/ 4/1932 NWS Out of Workshops (14 days)
/ 4/1932 - Modified AC Allce LT
24/ 3/1933 NWS Into Workshops -
23/ 9/1933 NWS Out of Workshops (158 days)
*L 900.VA - 11/10/1912 NWS Built new WHB
8/ 3/1932 NWS Into Workshops -
/ 3/1932 - Modified AC Allce LT
23/ 3/1932 NWS Out of Workshops (16 days)
23/ 4/1935 NWS Into Workshops -
16/ 7/1935 NWS Out of Workshops (50 days)
*L 901.VA - 11/10/1912 NWS Built new WHB, Iron
22/12/1930 NWS Into Workshops -
/ 8/1931 - Modified Trans hook
20/ 8/1931 NWS Out of Workshops (50 days)
/ 5/1932 - Modified AC Allce LT
*L 902.VA - 11/10/1912 NWS Built new WHB, Iron
5/ 3/1932 NWS Into Workshops -
18/ 3/1932 NWS Out of Workshops (14 days)
/ 3/1932 - Modified Auto cpled
17/ 1/1961 NWS Scrapped -
*L 903.VA - 15/ 8/1914 NWS Built new WHB, Iron
22/ 1/1932 NWS Into Workshops -
11/ 2/1932 NWS Out of Workshops (21 days)
/ 2/1932 - Modified AC Allce LT
*L 904.VA - 15/ 8/1914 NWS Built new WHB, Iron
12/ 4/1932 NWS Into Workshops -
/ 4/1932 - Modified AC Allce LT
28/ 4/1932 NWS Out of Workshops (17 days)
*L 905.VA - 15/ 8/1914 NWS Built new WHB, Iron
30/ 3/1932 NWS Into Workshops -
13/ 4/1932 NWS Out of Workshops (15 days)
/ 4/1932 - Modified AC Allce LT
8/11/1935 NWS Into Workshops -
21/ 2/1936 NWS Out of Workshops (50 days)
13/ 8/1980 - Off Register [CRS]
29/ 8/1980 NWS Scrapped [CRS]
*L 906.VA - 15/ 8/1914 NWS Built new WHB, Iron
5/ 3/1932 NWS Into Workshops -
18/ 3/1932 NWS Out of Workshops (14 days)
/ 3/1932 - Modified AC Allce LT
.
Vehicle.............SV # Date...... Loc History............SV Notes
*L 907.VA - 15/ 8/1914 NWS Built new WHB, Iron
8/ 1/1932 NWS Into Workshops -
5/ 2/1932 NWS Out of Workshops (29 days)
/ 2/1932 - Modified Trans hook
/ 5/1932 - Modified AC Allce LT
*L 908.VA - 15/ 8/1914 NWS Built new WHB, Iron
18/ 2/1932 NWS Into Workshops -
/ 3/1932 - Modified AC Allce LT
22/ 3/1932 NWS Out of Workshops (34 days)
*L 909.VA - 15/ 8/1914 NWS Built new WHB, Iron
28/11/1930 NWS Into Workshops -
16/ 4/1931 NWS Out of Workshops (50 days)
14/ 1/1932 NWS Into Workshops -
/ 1/1932 - Modified Trans hook
26/ 1/1932 NWS Out of Workshops (13 days)
/ 5/1932 - Modified AC Allce LT
*L 910.VA - 22/ 8/1914 NWS Built new WHB, Iron
23/ 2/1932 NWS Into Workshops -
15/ 3/1932 NWS Out of Workshops (22 days)
/ 3/1932 - Modified AC Allce LT
/ /1976 - Scrapped RSN10/76
*L 911.VA - 22/ 8/1914 NWS Built new WHB, Iron
27/ 2/1932 NWS Into Workshops -
11/ 3/1932 NWS Out of Workshops (14 days)
/ 3/1932 - Modified AC Allce LT
*L 912.VA - 22/ 8/1914 NWS Built new WHB, Iron
26/ 4/1932 NWS Into Workshops -
14/ 7/1932 NWS Out of Workshops (50 days)
/ 7/1932 - Modified AC Allce LT
6/ 7/1955 - Scrapped -
*L 913.VA - 22/ 8/1914 NWS Built new WHB, Iron
22/ 1/1932 NWS Into Workshops -
6/ 2/1932 NWS Out of Workshops (16 days)
/ 2/1932 - Modified AC Allce LT
8/ 1/1936 NWS Into Workshops -
12/ 3/1936 NWS Out of Workshops (50 days)
17/ 1/1961 NWS Scrapped -
*L 914.VA - 22/ 8/1914 NWS Built new WHB, Iron
/10/1931 - Modified Trans hook
/ 5/1932 - Modified AC Allce LT
circa 1978 - Off Register [v]
13/ 4/1978 RAA Sighting [RO]
*L 915.VA - 22/ 8/1914 NWS Built new WHB, Iron
13/10/1930 NWS Into Workshops -
27/11/1930 NWS Out of Workshops (46 days)
21/ 5/1932 NWS Into Workshops -
10/ 6/1932 NWS Out of Workshops (21 days)
/ 6/1932 - Modified AC Allce LT
30/ 4/1970 SRD Scrapped -
.
Vehicle.............SV # Date...... Loc History............SV Notes
*L 916.VA - 22/ 8/1914 NWS Built new WHB, Iron
18/ 2/1932 NWS Into Workshops -
5/ 3/1932 NWS Out of Workshops (17 days)
/ 3/1932 - Modified AC Allce LT
*L 917.VA - 22/ 8/1914 NWS Built new WHB, Iron
/10/1931 - Modified Trans hook
/ 4/1932 - Modified AC Allce LT
*L 918.VA - 25/ 8/1914 NWS Built new WHB, Iron
3/ 8/1931 NWS Into Workshops -
3/ 9/1931 NWS Out of Workshops (32 days)
/ 9/1931 - Modified Trans hook
/ 5/1932 - Modified AC Allce LT
*L 919.VA - 25/ 8/1914 NWS Built new WHB, Iron
10/ 5/1932 NWS Into Workshops -
/ 6/1932 - Modified Auto cpled
23/ 6/1932 NWS To LB 919.VA (45 days)
*L 920.VA - 29/ 8/1914 NWS Built new WHB, Iron
8/ 4/1932 NWS Into Workshops -
/ 4/1932 - Modified AC Allce LT
23/ 4/1932 NWS Out of Workshops (16 days)
*L 921.VA - 29/ 8/1914 NWS Built new WHB, Iron
22/ 1/1932 NWS Into Workshops -
6/ 2/1932 NWS Out of Workshops (16 days)
/ 2/1932 - Modified AC Allce LT
12/ 1/1961 NWS Scrapped -
*L 922.VA - 29/ 8/1914 NWS Built new WHB, Iron
/ 9/1931 - Modified Trans hook
/ 5/1932 - Modified AC Allce LT
/ /1970 - Scrapped R104
*L 923.VA - 29/ 8/1914 NWS Built new WHB, Iron
/12/1931 - Modified Trans hook
/ 5/1932 - Modified AC Allce LT
3/ 3/1960 SER Scrapped -
*L 924.VA - 29/ 8/1914 NWS Built new WHB, Iron
6/ 4/1932 NWS Into Workshops -
/ 4/1932 - Modified AC Allce LT
22/ 4/1932 NWS Out of Workshops (17 days)
*L 925.VA - 29/ 8/1914 NWS Built new WHB, iron
6/10/1930 NWS Into Workshops -
5/12/1930 NWS Out of Workshops (61 days)
19/ 2/1932 NWS Into Workshops -
5/ 3/1932 NWS Out of Workshops (16 days)
/ 3/1932 - Modified AC Allce LT
.
Vehicle.............SV # Date...... Loc History............SV Notes
*L 926.VA - 29/ 8/1914 NWS Built new WHB, Iron
20/ 2/1931 NWS Into Workshops -
11/ 5/1931 NWS Out of Workshops (50 days)
16/ 2/1932 NWS Into Workshops -
3/ 3/1932 NWS Out of Workshops (17 days)
/ 3/1932 - Modified AC Allce LT
1/ 7/1947 RID Destroyed In collision ...
5/ 8/1947 - Off Register -
*L 927.VA - 29/ 8/1914 NWS Built new WHB, Iron
6/10/1930 NWS Into Workshops -
15/11/1930 NWS Out of Workshops (41 days)
11/ 3/1932 NWS Into Workshops -
/ 3/1932 - Modified AC Allce LT
23/ 3/1932 NWS Out of Workshops (13 days)
circa 1978 - Off Register [v]
13/ 4/1978 RAA Sighting [RO]
*L 928.VA - 8/ 9/1914 NWS Built new WHB, Iron
/10/1931 - Modified Trans hook
/ 5/1932 - Modified AC Allce LT
22/ 6/1984 - Off Register [CRS]
*L 929.VA - 8/ 9/1914 NWS Built new WHB, Iron
26/ 4/1932 NWS Into Workshops -
7/ 5/1932 NWS Out of Workshops (12 days)
/ 5/1932 - Modified AC Allce LT
/ /1971 - Scrapped R104
*L 930.VA - 8/ 9/1914 NWS Built new WHB, Iron
6/ 5/1931 NWS Into Workshops -
7/ 7/1931 NWS Out of Workshops (50 days)
/ 8/1931 - Modified Trans hook
/ 4/1932 - Modified AC Allce LT
*L 931.VA - 8/ 9/1914 NWS Built new WHB, Iron
/11/1931 - Modified Trans hook
/ 5/1932 - Modified AC Allce LT
17/ 1/1961 NWS Scrapped -
*L 932.VA - 8/ 9/1914 NWS Built new WHB, Iron
29/ 3/1932 NWS Into Workshops -
15/ 4/1932 NWS Out of Workshops (18 days)
/ 4/1932 - Modified AC Allce LT
2/ 8/1934 NWS Into Workshops -
20/10/1934 NWS Out of Workshops (50 days)
*L 933.VA - 8/ 9/1914 NWS Built new WHB, Iron
19/ 3/1931 NWS Into Workshops -
13/ 5/1931 NWS Out of Workshops (50 days)
19/ 4/1932 NWS Into Workshops -
4/ 5/1932 NWS Out of Workshops (16 days)
/ 5/1932 - Modified AC Allce LT
23/ 8/1983 - Off Register [CRS]
.
Vehicle.............SV # Date...... Loc History............SV Notes
*L 934.VA - 8/ 9/1914 NWS Built new WHB, Iron
19/ 2/1932 NWS Into Workshops -
5/ 3/1932 NWS Out of Workshops (16 days)
/ 3/1932 - Modified AC Allce LT
*L 935.VA - 8/ 9/1914 NWS Built new WHB, Iron
17/ 6/1931 NWS Into Workshops -
12/ 8/1931 NWS Out of Workshops (50 days)
/ 8/1931 - Modified Trans hook
/ 5/1932 - Modified AC Allce LT
/ /1970 - Scrapped R104
*L 936.VA - 8/ 9/1914 NWS Built new WHB, Iron
15/ 4/1932 NWS Into Workshops -
/ 4/1932 - Modified AC Allce LT
29/ 4/1932 NWS Out of Workshops (15 days)
*L 937.VA - 8/ 9/1914 NWS Built new WHB, Iron
/ 7/1932 - Modified AC Allce LT
*L 938.VA - 14/ 9/1914 NWS Built new WHB, Iron
15/ 3/1932 NWS Into Workshops -
30/ 3/1932 NWS Out of Workshops (16 days)
/ 4/1932 - Modified AC Allce LT
*L 939.VA - 14/ 9/1914 NWS Built new WHB, Iron
1/ 5/1931 NWS Into Workshops -
23/ 6/1931 NWS Out of Workshops (50 days)
12/ 4/1932 NWS Into Workshops -
/ 4/1932 - Modified AC Allce LT
27/ 4/1932 NWS Out of Workshops (16 days)
17/ 1/1961 NWS Scrapped -
*L 940.VA - 14/ 9/1914 NWS Built new WHB, Iron
5/ 1/1931 NWS Into Workshops -
12/ 6/1931 NWS Out of Workshops (50 days)
19/ 2/1932 NWS Into Workshops -
5/ 3/1932 NWS Out of Workshops (16 days)
/ 3/1932 - Modified AC Allce LT
*L 941.VA - 14/ 9/1914 NWS Built new WHB, Iron
12/ 3/1931 NWS Into Workshops -
25/ 5/1931 NWS Out of Workshops (50 days)
12/ 4/1932 NWS Into Workshops -
/ 4/1932 - Modified AC Allce
27/ 4/1932 NWS Out of Workshops (16 days)
*L 942.VA - 14/ 9/1914 NWS Built new WHB, Iron
28/ 1/1932 NWS Into Workshops -
/ 2/1932 - Modified AC Allce
24/ 2/1932 NWS Out of Workshops (28 days)
15/ 1/1981 - Off Register [CRS]
20/ 2/1981 BOW Scrapped [CRS]
.
Vehicle.............SV # Date...... Loc History............SV Notes
*L 943.VA - 14/ 9/1914 NWS Built new WHB, Iron
13/ 2/1931 NWS Into Workshops -
29/ 6/1931 NWS Out of Workshops (50 days)
22/ 1/1932 NWS Into Workshops -
11/ 2/1932 NWS Out of Workshops (21 days)
/ 2/1932 - Modified AC Allce
*L 944.VA - 19/ 9/1914 NWS Built new WHB, Iron
/11/1931 - Modified Trans hook
/ 5/1932 - Modified Auto cpled
*L 945.VA - 19/ 9/1914 NWS Built new WHB, Iron
/11/1931 - Modified Trans hook
/ 5/1932 - Modified Auto cpled
*L 946.VA - 24/ 9/1914 NWS Built new WHB, Iron
10/ 5/1932 NWS Into Workshops -
/ 5/1932 - Modified AC Allce
23/ 5/1932 NWS Out of Workshops (14 days)
circa 1978 - Off Register [v]
13/ 4/1978 RAA Sighting [RO]
*L 947.VA - 24/ 9/1914 NWS Built new WHB, Iron
18/12/1931 NWS Into Workshops -
/ 1/1932 - Modified Trans hook
22/ 1/1932 NWS Out of Workshops (36 days)
/ 5/1932 - Modified Auto cpled
*L 948.VA - 24/ 9/1914 NWS Built new WHB, Iron
29/ 3/1932 NWS Into Workshops -
13/ 4/1932 NWS Out of Workshops (16 days)
/ 4/1932 - Modified AC Allce
/ /1974 - Scrapped RSN11/74
*L 949.VA - 24/ 9/1914 NWS Built new WHB, Iron
13/ 1/1931 NWS Into Workshops -
12/ 8/1931 NWS Out of Workshops (50 days)
/ 8/1931 - Modified Trans hook
/ 5/1932 - Modified Auto cpled
*L 950.VA - 24/ 9/1914 NWS Built new WHB, Iron
28/ 1/1932 NWS Into Workshops -
/ 2/1932 - Modified AC Allce
23/ 2/1932 NWS Out of Workshops (27 days)
6/ 4/1934 NWS Into Workshops -
13/10/1934 NWS Out of Workshops (50 days)
14/ 2/1955 - Scrapped -
*L 951.VA - 24/ 9/1914 NWS Built new WHB, Iron
10/ 3/1931 NWS Into Workshops -
11/ 5/1931 NWS Out of Workshops (50 days)
28/ 1/1932 NWS Into Workshops -
/ 6/1932 - Modified AC Allce
15/ 6/1932 NWS To LB 951.VA (50 days)
.
Vehicle.............SV # Date...... Loc History............SV Notes
*L 952.VA - 24/ 9/1914 NWS Built new WHB, Iron
18/ 1/1932 NWS Into Workshops -
19/ 2/1932 NWS Out of Workshops (33 days)
/ 2/1932 - Modified AC Allce
14/ 6/1935 NWS Into Workshops -
26/ 9/1935 NWS Out of Workshops (50 days)
*L 953.VA - 24/ 9/1914 NWS Built new WHB, Iron
14/ 6/1930 NWS Into Workshops and stored
31/ 1/1931 NWS Out of Workshops (50 days)
3/ 5/1932 NWS Into Workshops -
/ 5/1932 - Modified AC Allce
25/ 5/1932 NWS Out of Workshops (23 days)
*L 954.VA - 24/ 9/1914 NWS Built new WHB, Iron
/12/1931 - Modified Trans hook
/ 5/1932 - Modified Auto cpled
22/ 9/1981 - Off Register [CRS]
10/11/1981 BOW Scrapped [CRS]
*L 955.VA - / /1914 NWS Built new -
28/ 1/1932 NWS Into Workshops -
11/ 3/1932 NWS Out of Workshops (44 days)
/ 3/1932 - Modified Trans hook
/ 5/1932 - Modified Auto cpled
/ /1969 - Scrapped -
*L 956.VA - 2/10/1914 NWS Built new WHB, Iron
15/ 4/1932 NWS Into Workshops -
/ 4/1932 - Modified AC Allce
30/ 4/1932 NWS Out of Workshops (16 days)
*L 957.VA - 2/10/1914 NWS Built new WHB, Iron
29/ 3/1932 NWS Into Workshops -
13/ 4/1932 NWS Out of Workshops (16 days)
/ 4/1932 - Modified AC Allce
8/10/1934 NWS Into Workshops -
26/ 9/1935 NWS Out of Workshops (50 days)
*L 958.VA - 2/10/1914 NWS Built new WHB, Iron
24/ 5/1932 NWS Into Workshops -
/ 6/1932 - Modified AC Allce
16/ 6/1932 NWS To LB 958.VA (24 days)
*L 959.VA - 2/10/1914 NWS Built new WHB, Iron
8/ 3/1932 NWS Into Workshops -
/ 3/1932 - Modified AC Allce
22/ 3/1932 NWS Out of Workshops (15 days)
*L 960.VA - 2/10/1914 NWS Built new WHB, Iron
15/ 1/1931 NWS Into Workshops -
19/ 6/1931 NWS Out of Workshops (50 days)
14/ 1/1932 NWS Into Workshops -
9/ 2/1932 NWS Out of Workshops (27 days)
/ 2/1932 - Modified Trans hook
/ 5/1932 - Modified Auto cpled
8/ 1/1960 NWS Scrapped -
.
Vehicle.............SV # Date...... Loc History............SV Notes
*L 961.VA - 2/10/1914 NWS Built new WHB, Iron
/11/1931 - Modified Trans hook
/ 5/1932 - Modified Auto cpled
*L 962.VA - 2/10/1914 NWS Built new WHB, Iron
6/ 1/1931 NWS Into Workshops -
16/ 4/1931 NWS Out of Workshops (50 days)
15/ 4/1932 NWS Into Workshops -
/ 4/1932 - Modified AC Allce
27/ 4/1932 NWS Out of Workshops (13 days)
/ /1974 - Scrapped RSN11/74
*L 963.VA - 2/10/1914 NWS Built new WHB, Iron
18/ 1/1932 NWS Into Workshops -
/ 2/1932 - Modified AC Allce
23/ 2/1932 NWS Out of Workshops (37 days)
19/ 6/1935 NWS Into Workshops -
13/ 9/1935 NWS Out of Workshops (50 days)
18/ 7/1980 BOW Sold (to) [CRS]: to Sims
13/ 8/1980 - Off Register [CRS]
*L 964.VA - 13/10/1914 NWS Built new WHB, Iron
1/ 3/1932 NWS Into Workshops -
17/ 3/1932 NWS Out of Workshops (17 days)
/ 3/1932 - Modified AC Allce
*L 965.VA - 13/10/1914 NWS Built new WHB, Iron
8/ 1/1932 NWS Into Workshops -
6/ 2/1932 NWS Out of Workshops (30 days)
/ 2/1932 - Modified Trans hook
/ 5/1932 - Modified Auto cpled
22/ 9/1981 - Off Register [CRS]
6/11/1981 BOW Scrapped [CRS]
*L 966.VA - 13/10/1914 NWS Built new WHB, Iron
5/ 8/1931 NWS Into Workshops -
8/ 9/1931 NWS Out of Workshops (35 days)
/ 9/1931 - Modified Trans hook
/ 5/1932 - Modified Auto cpled
12/ 1/1961 NWS Scrapped -
*L 967.VA - 13/10/1914 NWS Built new WHB, Iron
24/ 2/1931 NWS Into Workshops -
25/ 5/1931 NWS Out of Workshops (50 days)
1/ 3/1932 NWS Into Workshops -
11/ 3/1932 NWS Out of Workshops (11 days)
/ 3/1932 - Modified AC Allce
*L 968.VA - 13/10/1914 NWS Built new WHB, Iron
1/ 3/1932 NWS Into Workshops -
11/ 3/1932 NWS Out of Workshops (11 days)
/ 3/1932 - Modified AC Allce
18/ 5/1982 - Off Register [CRS]
20/ 9/1982 SRD Scrapped [CRS]: ex BOW
.
Vehicle.............SV # Date...... Loc History............SV Notes
*L 969.VA - 13/10/1914 NWS Built new WHB, Iron
17/ 7/1931 NWS Into Workshops -
/ 8/1931 - Modified Trans hook
21/ 8/1931 NWS Out of Workshops (36 days)
/ 5/1932 - Modified Auto cpled
*L 970.VA - 13/10/1914 NWS Built new WHB, Iron
/ 9/1931 - Modified Trans hook
/ 5/1932 - Modified Auto cpled
/ /1971 - Scrapped R104
*L 971.VA - 13/10/1914 NWS Built new WHB, Iron
9/ 2/1932 NWS Into Workshops -
1/ 3/1932 NWS Out of Workshops (22 days)
/ 3/1932 - Modified AC Allce
*L 972.VA - 15/10/1914 NWS Built new WHB, Iron
26/ 5/1932 NWS Into Workshops -
/ 7/1932 - Modified Auto cpled
7/ 7/1932 NWS To LB 972.VA (43 days)
*L 973.VA - 15/10/1914 NWS Built new WHB, Iron
1/10/1930 NWS Into Workshops -
26/11/1930 NWS Out of Workshops (57 days)
/12/1931 - Modified Trans hook
/ 5/1932 - Modified Auto cpled
26/ 8/1980 - Off Register [CRS]
19/ 9/1980 BOW Scrapped [CRS]
*L 974.VA - 15/10/1914 NWS Built new WHB, Iron
22/ 3/1932 NWS Into Workshops -
11/ 4/1932 NWS Out of Workshops (21 days)
/ 4/1932 - Modified AC Allce
4/ 2/1936 NWS Into Workshops -
24/ 4/1936 NWS Out of Workshops (50 days)
*L 975.VA - 15/10/1914 NWS Built new WHB, Iron
24/11/1931 NWS Into Workshops -
19/12/1931 NWS Out of Workshops (26 days)
/12/1931 - Modified Trans hook
/ 5/1932 - Modified Auto cpled
*L 976.VA - 15/10/1914 NWS Built new WHB, Iron
9/ 2/1932 NWS Into Workshops -
/ 2/1932 - Modified AC Allce
25/ 2/1932 NWS Out of Workshops (17 days)
25/ 9/1936 NWS Into Workshops -
19/11/1936 NWS Out of Workshops (50 days)
*L 977.VA - 15/10/1914 NWS Built new WHB, Iron
6/ 1/1932 NWS Into Workshops -
/ 1/1932 - Modified Trans hook
27/ 1/1932 NWS Out of Workshops (22 days)
/ 4/1932 - Modified Auto cpled
.
Vehicle.............SV # Date...... Loc History............SV Notes
*L 978.VA - 25/ 8/1916 NWS Built new WHB, Iron
18/12/1931 NWS Into Workshops -
/ 1/1932 - Modified Trans hook
21/ 1/1932 NWS Out of Workshops (35 days)
/ 6/1932 - Modified Auto cpled
11/ 5/1983 - Off Register [CRS]
27/ 8/1983 BOW Scrapped [CRS]
*L 979.VA - 25/ 8/1916 NWS Built new WHB, Iron
10/ 5/1932 NWS Into Workshops -
/ 7/1932 - Modified AC Allce
7/ 7/1932 NWS To LB 979.VA (50 days)
LB 979.VA - circa 1957 - To L 979.VA (v)
*L 979.VA - 3/ 3/1980 SRD Scrapped [CRS]
*L 980.VA - 25/ 8/1916 NWS Built new WHB, Iron
/ 7/1932 - Modified AC Allce
*L 981.VA - 25/ 8/1916 NWS Built new WHB, Iron
18/ 1/1932 NWS Into Workshops -
/ 2/1932 - Modified AC Allce
23/ 2/1932 NWS Out of Workshops (37 days)
circa 1978 - Off Register [v]
13/ 4/1978 RAA Sighting [RO]
*L 982.VA - 25/ 8/1916 NWS Built new WHB, Iron
26/ 4/1932 NWS Into Workshops -
/ 7/1932 - Modified AC Allce
7/ 7/1932 NWS To LB 982.VA (50 days)
LB 982.VA - 11/ 9/1954 NMW To L 982.VA (W/E)
*L 982.VA - 23/ 1/1981 - Off Register [CRS]
*L 983.VA - 25/ 8/1916 NWS Built new WHB, Iron
8/ 3/1932 NWS Into Workshops -
/ 3/1932 - Modified AC Allce
22/ 3/1932 NWS Out of Workshops (15 days)
5/11/1959 NWS Scrapped -
*L 984.VA - 31/ 8/1916 NWS Built new WHB, Iron
4/12/1931 NWS Into Workshops -
7/ 1/1932 NWS Out of Workshops (35 days)
/ 1/1932 - Modified Trans hook
/ 5/1932 - Modified Auto cpled
*L 985.VA - 31/ 8/1916 NWS Built new WHB, Iron
12/ 4/1932 NWS Into Workshops -
/ 4/1932 - Modified AC Allce
28/ 4/1932 NWS Out of Workshops (17 days)
12/ 1/1961 NWS Scrapped -
*L 986.VA - 31/ 8/1916 NWS Built new WHB, Iron
9/ 2/1932 NWS Into Workshops -
/ 2/1932 - Modified AC Allce
25/ 2/1932 NWS Out of Workshops (17 days)
.
Vehicle.............SV # Date...... Loc History............SV Notes
*L 987.VA - 31/ 8/1916 NWS Built new WHB, Iron
16/ 1/1932 NWS Into Workshops -
13/ 2/1932 NWS Out of Workshops (29 days)
/ 2/1932 - Modified Trans hook
/ 5/1932 - Modified Auto cpled
*L 988.VA - 31/ 8/1916 NWS Built new WHB, Iron
15/ 4/1932 NWS Into Workshops -
/ 4/1932 - Modified AC Allce
28/ 4/1932 NWS Out of Workshops (14 days)
*L 989.VA - 31/ 8/1916 NWS Built new WHB, Iron
10/ 5/1932 NWS Into Workshops -
/ 7/1932 - Modified AC Allce
7/ 7/1932 NWS To LB 989.VA (50 days)
LB 989.VA - 11/ 9/1954 NMW To L 989.VA (W/E)
*L 990.VA - 31/ 8/1916 NWS Built new WHB, Iron
28/ 1/1932 NWS Into Workshops -
/ 2/1932 - Modified AC Allce
24/ 2/1932 NWS Out of Workshops (28 days)
7/ 1/1937 NWS Into Workshops -
8/ 7/1937 NWS Out of Workshops (50 days)
12/ 1/1961 NWS Scrapped -
*L 991.VA - 31/ 8/1916 NWS Built new WHB, Iron
1/12/1931 NWS Into Workshops -
/12/1931 - Modified Trans hook
23/12/1931 NWS Out of Workshops (23 days)
/ 5/1932 - Modified Auto cpled
*L 992.VA - 31/ 8/1916 NWS Built new WHB, Iron
21/ 4/1932 NWS Into Workshops -
14/ 7/1932 NWS Out of Workshops (50 days)
/ 7/1932 - Modified AC Allce
*L 993.VA - 31/ 8/1916 NWS Built new WHB, Iron
23/ 4/1932 NWS Into Workshops -
15/ 7/1932 NWS Out of Workshops (50 days)
/ 7/1932 - Modified AC Allce
10/ 2/1981 - Off Register [CRS]
5/ 8/1981 NWS Scrapped [CRS]
*L 994.VA - 31/ 8/1916 NWS Built new WHB, Iron
/10/1931 - Modified Trans hook
/ 6/1932 - Modified Auto cpled
*L 995.VA - 27/ 9/1916 NWS Built new WHB, Iron
/12/1931 - Modified Trans hook
/ 5/1932 - Modified Auto cpled
13/ 2/1934 NWS Into Workshops -
10/10/1934 NWS Out of Workshops (50 days)
.
Vehicle.............SV # Date...... Loc History............SV Notes
*L 996.VA - 27/ 9/1916 NWS Built new WHB, Iron
6/11/1931 NWS Into Workshops -
1/12/1931 NWS Out of Workshops (26 days)
/12/1931 - Modified Trans hook
/ 5/1932 - Modified Auto cpled
*L 997.VA - 27/ 9/1916 NWS Built new WHB, Iron
16/ 2/1932 NWS Into Workshops -
3/ 3/1932 NWS Out of Workshops (17 days)
/ 3/1932 - Modified AC Allce
*L 998.VA - 27/ 9/1916 NWS Built new WHB, Iron
24/ 2/1931 NWS Into Workshops -
17/ 4/1931 NWS Out of Workshops (50 days)
1/ 4/1932 NWS Into Workshops -
15/ 4/1932 NWS Out of Workshops (15 days)
/ 4/1932 - Modified AC Allce
17/ 1/1961 NWS Scrapped -
*L 999.VA - 27/ 9/1916 NWS Built new WHB, Iron
9/ 1/1932 NWS Into Workshops -
17/ 2/1932 NWS Out of Workshops (40 days)
/ 2/1932 - Modified AC Allce
*L 1000.VA - 27/ 9/1916 NWS Built new WHB, Iron
5/ 3/1932 NWS Into Workshops -
18/ 3/1932 NWS Out of Workshops (14 days)
/ 3/1932 - Modified AC Allce
*L 1001.VA - 27/ 9/1916 NWS Built new WHB, Iron
21/ 4/1932 NWS Into Workshops -
5/ 5/1932 NWS Out of Workshops (15 days)
/ 5/1932 - Modified AC Allce
19/ 6/1936 NWS Into Workshops -
28/ 8/1936 NWS Out of Workshops (50 days)
6/ 7/1959 NWS Scrapped -
*L 1002.VA - 25/ 9/1916 NWS Built new WHB, Iron
3/ 3/1931 NWS Into Workshops -
2/ 5/1931 NWS Out of Workshops (50 days)
12/ 4/1932 NWS Into Workshops -
/ 4/1932 - Modified AC Allce
27/ 4/1932 NWS Out of Workshops (16 days)
*L 1003.VA - 25/ 9/1916 NWS Built new WHB, Iron
/ 7/1932 - Modified AC Allce
7/ 5/1985 - Off Register -
*L 1004.VA - 25/ 9/1916 NWS Built new WHB, Iron
10/ 5/1932 NWS Into Workshops -
/ 7/1932 - Modified AC Allce
7/ 7/1932 NWS To LB 1004.VA (50 days)
*L 1005.VA - 25/ 9/1916 NWS Built new WHB, Iron
/ 8/1932 - Modified AC Allce
/ /1969 - Scrapped -
.
Vehicle.............SV # Date...... Loc History............SV Notes
*L 1006.VA - 25/ 9/1916 NWS Built new WHB, Iron
4/12/1931 NWS Into Workshops -
17/12/1931 NWS Out of Workshops (14 days)
/12/1931 - Modified Trans hook
/ 5/1932 - Modified AC Allce
22/ 9/1936 NWS Into Workshops -
29/10/1936 NWS Out of Workshops (38 days)
*L 1007.VA - 25/ 9/1916 NWS Built new WHB, Iron
21/ 4/1932 NWS Into Workshops -
15/ 7/1932 NWS Out of Workshops (50 days)
/ 7/1932 - Modified AC Allce
*L 1008.VA - 25/ 9/1916 NWS Built new WHB, Iron
21/ 4/1932 NWS Into Workshops -
14/ 7/1932 NWS Out of Workshops (50 days)
/ 7/1932 - Modified AC Allce
23/ 8/1983 - Off Register [CRS]
*L 1009.VA - 25/ 9/1916 NWS Built new WHB, Iron
3/ 5/1932 NWS Into Workshops -
11/ 7/1932 NWS Out of Workshops (50 days)
/ 7/1932 - Modified AC Allce
*L 1010.VA - 6/10/1916 NWS Built new WHB, Iron
3/ 2/1931 NWS Into Workshops -
22/ 4/1931 NWS Out of Workshops (50 days)
15/ 3/1932 NWS Into Workshops -
/ 3/1932 - Modified AC Allce
31/ 3/1932 NWS Out of Workshops (17 days)
21/ 1/1936 NWS Into Workshops -
17/ 4/1936 NWS Out of Workshops (50 days)
/ /1971 - Scrapped R104
*L 1011.VA - 6/10/1916 NWS Built new WHB, Iron
1/ 4/1932 NWS Into Workshops -
15/ 4/1932 NWS Out of Workshops (15 days)
/ 4/1932 - Modified AC Allce
*L 1012.VA - 6/10/1916 NWS Built new WHB, Iron
9/ 2/1932 NWS Into Workshops -
1/ 3/1932 NWS Out of Workshops (22 days)
/ 3/1932 - Modified AC Allce
5/ 3/1937 NWS Into Workshops -
13/ 7/1937 NWS Out of Workshops (50 days)
*L 1013.VA - 6/10/1916 NWS Built new WHB, Iron
/11/1931 - Modified Trans hook
/ 4/1932 - Modified AC Allce
7/ 5/1985 - Off Register -
.
Vehicle.............SV # Date...... Loc History............SV Notes
*L 1014.VA - 6/10/1916 NWS Built new WHB, Iron
6/11/1931 NWS Into Workshops -
2/12/1931 NWS Out of Workshops (27 days)
/12/1931 - Modified Trans hook
/ 5/1932 - Modified AC Allce
25/ 3/1982 - Off Register [CRS]
24/ 8/1982 BOW Scrapped [CRS]: body to SRD
*L 1015.VA - 6/10/1916 NWS Built new WHB, Iron
/ 7/1932 - Modified AC Allce
*L 1016.VA - 6/10/1916 NWS Built new WHB, Iron
9/12/1931 NWS Into Workshops -
14/ 1/1932 NWS Out of Workshops (37 days)
/ 1/1932 - Modified Trans hook
/ 5/1932 - Modified AC Allce
*L 1017.VA - 6/10/1916 NWS Built new WHB, Iron
18/ 1/1932 NWS Into Workshops -
17/ 3/1932 NWS Out of Workshops (50 days)
/ 3/1932 - Modified AC Allce
/ /1971 - Scrapped R104
*L 1018.VA - 6/10/1916 NWS Built new WHB, Iron
/11/1931 - Modified Trans hook
/ 5/1932 - Modified AC Allce
10/ 3/1960 NWS Scrapped -
*L 1019.VA - 6/10/1916 NWS Built new WHB, Iron
8/12/1931 NWS Into Workshops -
17/12/1931 NWS Out of Workshops (10 days)
/12/1931 - Modified Trans hook
/ 5/1932 - Modified AC Allce
17/ 4/1936 NWS Into Workshops -
20/ 8/1936 NWS Out of Workshops (50 days)
21/10/1967 BDE Photograph #13.1: VO, L3
*L 1020.VA - 6/10/1916 NWS Built new WHB, Iron
9/ 2/1931 NWS Into Workshops -
29/ 5/1931 NWS Out of Workshops (50 days)
26/ 4/1932 NWS Into Workshops -
7/ 5/1932 NWS Out of Workshops (12 days)
/ 5/1932 - Modified AC Allce
6/ 6/1957 ING Destroyed 57/7147
*L 1021.VA - 6/10/1916 NWS Built new WHB, Iron
4/12/1931 NWS Into Workshops -
13/ 1/1932 NWS Out of Workshops (41 days)
/ 1/1932 - Modified Trans hook
/ 4/1932 - Modified AC Allce
*L 1022.VA - 6/10/1916 NWS Built new WHB, Iron
/11/1931 - Modified Trans hook
/ 5/1932 - Modified AC Allce
.
Vehicle.............SV # Date...... Loc History............SV Notes
*L 1023.VA - 6/10/1916 NWS Built new WHB, Iron
15/ 4/1932 NWS Into Workshops -
18/ 7/1932 NWS Out of Workshops (50 days)
/ 7/1932 - Modified AC Allce
/ 8/1955 - Modified FFA-1 axleboxes
/ /1976 - Scrapped RSN8/76
*L 1024.VA - 6/10/1916 NWS Built new WHB, Iron
8/ 3/1932 NWS Into Workshops -
/ 3/1932 - Modified AC Allce
23/ 3/1932 NWS Out of Workshops (16 days)
6/ 3/1937 NWS Into Workshops -
1/ 7/1937 NWS Out of Workshops (50 days)
6/ 7/1959 NWS Scrapped -
*L 1025.VA - 6/10/1916 NWS Built new WHB, Iron
/11/1931 - Modified Trans hook
/ 5/1932 - Modified AC Allce
circa 1978 - Off Register [v]
13/ 4/1978 RAA Sighting [RO]
*L 1026.VA - 11/10/1916 NWS Built new WHB, Iron
3/ 5/1932 NWS Into Workshops -
11/ 7/1932 NWS Out of Workshops (50 days)
/ 7/1932 - Modified AC Allce
circa 1978 - Off Register [v]
13/ 4/1978 RAA Sighting [RO]
*L 1027.VA - 11/10/1916 NWS Built new WHB, Iron
18/ 2/1932 NWS Into Workshops -
5/ 3/1932 NWS Out of Workshops (17 days)
/ 3/1932 - Modified AC Allce
1/ 9/1936 NWS Into Workshops -
27/10/1936 NWS Out of Workshops (50 days)
12/ 1/1961 NWS Scrapped -
*L 1028.VA - 11/10/1916 NWS Built new WHB, Iron
30/ 3/1932 NWS Into Workshops -
15/ 4/1932 NWS Out of Workshops (17 days)
/ 4/1932 - Modified AC Allce
*L 1029.VA - 11/10/1916 NWS Built new WHB, Iron
20/ 1/1931 NWS Into Workshops -
23/ 6/1931 NWS Out of Workshops (50 days)
21/ 5/1932 NWS Into Workshops -
/ 6/1932 - Modified AC Allce
15/ 6/1932 NWS To LB 1029.VA (26 days)
*L 1030.VA - 11/10/1916 NWS Built new WHB, Iron
10/ 5/1932 NWS Into Workshops -
/ 7/1932 - Modified AC Allce
22/ 7/1932 NWS Out of Workshops (50 days)
circa 1978 - Off Register [v]
13/ 4/1978 RAA Sighting [RO]
.
Vehicle.............SV # Date...... Loc History............SV Notes
*L 1031.VA - 11/10/1916 NWS Built new WHB, Iron
15/ 4/1932 NWS Into Workshops -
/ 4/1932 - Modified AC Allce
30/ 4/1932 NWS Out of Workshops (16 days)
*L 1032.VA - 14/10/1916 NWS Built new WHB, Iron
8/ 4/1932 NWS Into Workshops -
/ 4/1932 - Modified AC Allce
23/ 4/1932 NWS Out of Workshops (16 days)
7/ 7/1936 NWS Into Workshops -
7/ 9/1936 NWS Out of Workshops (50 days)
*L 1033.VA - 14/10/1916 NWS Built new WHB, Iron
/ 3/1932 - Modified AC Allce
22/ 3/1932 NWS Into Workshops -
9/ 4/1932 NWS Out of Workshops (19 days)
3/ 3/1936 NWS Into Workshops -
16/ 7/1936 NWS Out of Workshops (50 days)
*L 1034.VA - 14/10/1916 NWS Built new WHB, Iron
22/ 3/1932 NWS Into Workshops -
11/ 4/1932 NWS Out of Workshops (21 days)
/ 4/1932 - Modified AC Allce
15/ 6/1983 - Off Register [CRS]
*L 1035.VA - 14/10/1916 NWS Built new WHB, Iron
5/ 3/1932 NWS Into Workshops -
/ 3/1932 - Modified AC Allce
21/ 3/1932 NWS Out of Workshops (17 days)
3/ 1/1936 NWS Into Workshops -
19/ 2/1936 NWS Out of Workshops (48 days)
*L 1036.VA - 14/10/1916 NWS Built new WHB, Iron
29/ 1/1932 NWS Into Workshops -
/ 2/1932 - Modified AC Allce
23/ 2/1932 NWS Out of Workshops (26 days)
*L 1037.VA - 18/10/1916 NWS Built new WHB, Iron
/11/1931 - Modified Trans hook
/ 5/1932 - Modified AC Allce
*L 1038.VA - 18/10/1916 NWS Built new WHB, Iron
9/12/1931 NWS Into Workshops -
15/ 1/1932 NWS Out of Workshops (38 days)
/ 1/1932 - Modified Trans hook
/ 5/1932 - Modified AC Allce
*L 1039.VA - 18/10/1916 NWS Built new WHB, Iron
/10/1931 - Modified Trans hook
/ 5/1932 - Modified AC Allce
16/ 9/1980 - Off Register [CRS]
7/ 4/1981 SRD Scrapped [CRS]
.
Vehicle.............SV # Date...... Loc History............SV Notes
*L 1040.VA - 18/10/1916 NWS Built new WHB, Iron
8/ 4/1932 NWS Into Workshops -
/ 4/1932 - Modified AC Allce
21/ 4/1932 NWS Out of Workshops (14 days)
22/ 9/1936 NWS Into Workshops -
10/11/1936 NWS Out of Workshops (50 days)
*L 1041.VA - 18/10/1916 NWS Built new WHB, Iron
23/ 2/1932 NWS Into Workshops -
15/ 3/1932 NWS Out of Workshops (22 days)
/ 3/1932 - Modified AC Allce LT
14/ 3/1936 NWS Into Workshops -
28/ 7/1936 NWS Out of Workshops (50 days)
*L 1042.VA - 18/10/1916 NWS Built new WHB, Iron
/12/1931 - Modified Trans hook
/ 4/1932 - Modified AC Allce LT
/ /1976 - Scrapped RSN6/76
*L 1043.VA - 24/11/1916 NWS Built new WHB, Iron
15/ 3/1932 NWS Into Workshops -
/ 3/1932 - Modified AC Allce LT
2/ 4/1932 NWS Out of Workshops (19 days)
27/ 5/1970 SRD Scrapped -
*L 1044.VA - 24/11/1916 NWS Built new WHB, Iron
15/ 3/1932 NWS Into Workshops -
/ 3/1932 - Modified AC Allce LT
2/ 4/1932 NWS Out of Workshops (19 days)
11/ 9/1936 NWS Into Workshops -
23/10/1936 NWS Out of Workshops (43 days)
*L 1045.VA - 24/11/1916 NWS Built new WHB, Iron
26/ 4/1932 NWS Into Workshops -
15/ 7/1932 NWS Out of Workshops (50 days)
/ 7/1932 - Modified AC Allce LT
*L 1046.VA - 24/11/1916 NWS Built new WHB, Iron
3/ 5/1932 NWS Into Workshops -
/ 7/1932 - Modified AC Allce LT
7/ 7/1932 NWS To LB 1046.VA (50 days)
LB 1046.VA - circa 1961 - To L 1046.VA (v)
*L 1046.VA - 18/ 5/1982 - Off Register [CRS]
*L 1047.VA - 24/11/1916 NWS Built new WHB, Iron
14/ 1/1932 NWS Into Workshops -
19/ 2/1932 NWS Out of Workshops (37 days)
/ 2/1932 - Modified AC Allce LT
*L 1048.VA - 24/11/1916 NWS Built new WHB, Iron
22/ 3/1932 NWS Into Workshops -
13/ 4/1932 NWS Out of Workshops (23 days)
/ 4/1932 - Modified AC Allce LT
18/ 6/1935 NWS Into Workshops -
20/ 9/1935 NWS Out of Workshops (50 days)
16/ 6/1970 SRD Scrapped -
.
Vehicle.............SV # Date...... Loc History............SV Notes
*L 1049.VA - 24/11/1916 NWS Built new WHB, Iron
18/12/1931 NWS Into Workshops -
11/ 1/1932 NWS Out of Workshops (25 days)
/ 1/1932 - Modified Trans hook
/ 5/1932 - Modified AC Allce LT
*L 1050.VA - 24/11/1916 NWS Built new WHB, Iron
3/ 5/1932 NWS Into Workshops -
11/ 7/1932 NWS Out of Workshops (50 days)
/ 7/1932 - Modified AC Allce LT
15/10/1959 NWS Scrapped -
*L 1051.VA - 28/11/1916 NWS Built new WHB, Iron
22/ 3/1932 NWS Into Workshops -
11/ 4/1932 NWS Out of Workshops (21 days)
/ 4/1932 - Modified AC Allce LT
21/ 5/1935 NWS Into Workshops -
13/ 9/1935 NWS Out of Workshops (50 days)
/ /1970 - Scrapped R104
*L 1052.VA - 28/11/1916 NWS Built new WHB, Iron
17/ 5/1932 NWS Into Workshops -
15/ 7/1932 NWS Out of Workshops (50 days)
/ 7/1932 - Modified AC Allce LT
*L 1053.VA - 4/ 6/1917 NWS Built new WHB, Iron
/11/1931 - Modified Trans hook
/ 5/1932 - Modified AC Allce LT
/ /1977 - Scrapped NR1077
*L 1054.VA - 4/ 6/1917 NWS Built new WHB, Iron
10/ 5/1932 NWS Into Workshops -
/ 6/1932 - Modified AC Allce LT
16/ 6/1932 NWS To LB 1054.VA (38 days)
LB 1054.VA - 6/10/1936 NWS Into Workshops (with LB 300)
3/11/1936 NWS Out of Workshops (29 days)
*L 1055.VA - 4/ 6/1917 NWS Built new WHB, Iron
12/ 3/1931 NWS Into Workshops -
15/ 5/1931 NWS Out of Workshops (50 days)
/ 8/1931 - Modified Trans hook
/ 4/1932 - Modified AC Allce LT
*L 1056.VA - 4/ 6/1917 NWS Built new WHB, Iron
20/ 2/1931 NWS Into Workshops -
20/ 5/1931 NWS Out of Workshops (50 days)
11/ 3/1932 NWS Into Workshops -
30/ 3/1932 NWS Out of Workshops (20 days)
/ 4/1932 - Modified AC Allce LT
/ /1971 - Scrapped R104
.
Vehicle.............SV # Date...... Loc History............SV Notes
*L 1057.VA - 4/ 6/1917 NWS Built new WHB, Iron
15/ 4/1932 NWS Into Workshops -
3/ 5/1932 NWS Out of Workshops (19 days)
/ 5/1932 - Modified AC Allce LT
/ /1976 - Note RSN10/76 ( scrapped)
20/ 7/1981 - Off Register [CRS]
28/ 8/1981 BOW Scrapped [CRS]
*L 1058.VA - 4/ 6/1917 NWS Built new WHB, Iron
12/ 4/1932 NWS Into Workshops -
/ 4/1932 - Modified AC Allce LT
27/ 4/1932 NWS Out of Workshops (16 days)
6/10/1936 NWS Into Workshops -
9/11/1936 NWS Out of Workshops (35 days)
*L 1059.VA - 4/ 6/1917 NWS Built new WHB, Iron
12/ 1/1931 NWS Into Workshops -
15/ 7/1931 NWS Out of Workshops (50 days)
/ 8/1931 - Modified Trans hook
/ 5/1932 - Modified AC Allce LT
10/ 4/1970 SRD Scrapped -
*L 1060.VA - 12/ 6/1917 NWS Built new WHB, Iron
/ 7/1932 - Modified AC Allce LT
10/ 4/1970 SRD Scrapped -
*L 1061.VA - 12/ 6/1917 NWS Built new WHB, Iron
23/ 2/1931 NWS Into Workshops -
7/ 8/1931 NWS Out of Workshops (50 days)
/ 8/1931 - Modified Trans hook
/ 5/1932 - Modified AC Allce LT
24/ 7/1936 NWS Into Workshops -
18/ 9/1936 NWS Out of Workshops (50 days)
*L 1062.VA - 12/ 6/1917 NWS Built new WHB, Iron
21/ 5/1932 NWS Into Workshops -
/ 7/1932 - Modified AC Allce LT
7/ 7/1932 NWS To LB 1062.VA (48 days)
LB 1062.VA - 5/ 5/1936 NWS Into Workshops -
19/ 8/1936 NWS Out of Workshops (50 days)
circa 1957 - To L 1062.VA (v)
*L 1062.VA - 13/ 5/1981 - Off Register [CRS]
10/ 7/1981 BOW Sold (to) [CRS]
*L 1063.VA - 12/ 6/1917 NWS Built new WHB, Iron
31/ 7/1931 NWS Into Workshops -
2/ 9/1931 NWS Out of Workshops (34 days)
/ 9/1931 - Modified Trans hook
/ 5/1932 - Modified AC Allce LT
*L 1064.VA - 12/ 6/1917 NWS Built new WHB, Iron
/10/1931 - Modified Trans hook
/ 4/1932 - Modified AC Allce LT
12/ 1/1961 NWS Scrapped -
.
Vehicle.............SV # Date...... Loc History............SV Notes
*L 1065.VA - 12/ 6/1917 NWS Built new WHB, Iron
12/ 4/1932 NWS Into Workshops -
/ 4/1932 - Modified AC Allce LT
27/ 4/1932 NWS Out of Workshops (16 days)
*L 1066.VA - 12/ 6/1917 NWS Built new WHB, Iron
/11/1931 - Modified Trans hook
/ 5/1932 - Modified AC Allce LT
*L 1067.VA - 12/ 6/1917 NWS Built new WHB, Iron
6/ 5/1931 NWS Into Workshops -
4/ 7/1931 NWS Out of Workshops (50 days)
17/11/1931 NWS Into Workshops -
18/12/1931 NWS Out of Workshops (32 days)
/12/1931 - Modified Trans hook
/ 4/1932 - Modified AC Allce LT
*L 1068.VA - 12/ 6/1917 NWS Built new WHB, Iron
12/ 1/1931 NWS Into Workshops -
15/ 7/1931 NWS Out of Workshops (50 days)
/ 8/1931 - Modified Trans hook
/ 4/1932 - Modified AC Allce LT
*L 1069.VA - 12/ 6/1917 NWS Built new WHB, Iron
18/ 2/1932 NWS Into Workshops -
/ 3/1932 - Modified AC Allce LT
22/ 3/1932 NWS Out of Workshops (34 days)
13/ 3/1937 NWS Into Workshops -
9/ 7/1937 NWS Out of Workshops (50 days)
*L 1070.VA - 12/ 6/1917 NWS Built new WHB, Iron
25/ 2/1931 NWS Into Workshops -
30/ 4/1931 NWS Out of Workshops (50 days)
8/ 4/1932 NWS Into Workshops -
/ 4/1932 - Modified AC Allce LT
23/ 4/1932 NWS Out of Workshops (16 days)
*L 1071.VA - 12/ 6/1917 NWS Built new WHB, Iron
17/ 5/1932 NWS Into Workshops -
30/ 5/1932 NWS Out of Workshops (14 days)
/ 6/1932 - Modified AC Allce LT
24/ 3/1933 NWS Into Workshops -
15/ 9/1933 NWS Out of Workshops (50 days)
*L 1072.VA - 1/ 8/1917 NWS Built new WHB, Iron
19/ 3/1932 NWS Into Workshops -
31/ 3/1932 NWS Out of Workshops (13 days)
/ 4/1932 - Modified AC Allce LT
24/ 9/1976 NET Photograph #673.14
*L 1073.VA - 1/ 8/1917 NWS Built new WHB, Iron
29/ 1/1932 NWS Into Workshops -
17/ 2/1932 NWS Out of Workshops (20 days)
/ 2/1932 - Modified AC Allce LT
6/ 7/1959 NWS Scrapped -
.
Vehicle.............SV # Date...... Loc History............SV Notes
*L 1074.VA - 1/ 8/1917 NWS Built new WHB, Iron
/12/1931 - Modified Trans hook
/ 5/1932 - Modified AC Allce LT
*L 1075.VA - 1/ 8/1917 NWS Built new WHB, Iron
/12/1931 - Modified Trans hook
/ 5/1932 - Modified AC Allce LT
*L 1076.VA - 1/ 8/1917 NWS Built new WHB, Iron
6/ 4/1932 NWS Into Workshops -
19/ 4/1932 NWS Out of Workshops (14 days)
/ 4/1932 - Modified AC Allce LT
*L 1077.VA - 1/ 8/1917 NWS Built new WHB, Iron
12/ 4/1932 NWS Into Workshops -
/ 4/1932 - Modified AC Allce LT
30/ 4/1932 NWS Out of Workshops (19 days)
/ /1971 - Scrapped R104
*L 1078.VA - 1/ 8/1917 NWS Built new WHB, Iron
29/ 7/1931 NWS Into Workshops -
/ 8/1931 - Modified Trans hook
28/ 8/1931 NWS Out of Workshops (31 days)
/ 5/1932 - Modified AC Allce LT
12/ 1/1961 NWS Scrapped -
*L 1079.VA - 1/ 8/1917 NWS Built new WHB, Iron
1/ 4/1932 NWS Into Workshops -
15/ 4/1932 NWS Out of Workshops (15 days)
/ 4/1932 - Modified AC Allce LT
9/ 6/1936 NWS Into Workshops -
21/ 8/1936 NWS Out of Workshops (50 days)
28/10/1959 NWS Scrapped "late report 3/60"
*L 1080.VA - 9/ 8/1917 NWS Built new WHB, Iron
21/ 4/1932 NWS Into Workshops -
12/ 5/1932 NWS Out of Workshops (22 days)
/ 5/1932 - Modified AC Allce LT
18/ 9/1936 NWS Into Workshops -
16/11/1936 NWS Out of Workshops (50 days)
12/ 1/1961 NWS Scrapped -
*L 1081.VA - 9/ 8/1917 NWS Built new WHB, Iron
14/ 1/1932 NWS Into Workshops -
12/ 2/1932 NWS Out of Workshops (30 days)
/ 2/1932 - Modified Trans hook
/ 4/1932 - Modified AC Allce LT
*L 1082.VA - 9/ 8/1917 NWS Built new WHB, Iron
15/ 3/1932 NWS Into Workshops -
31/ 3/1932 NWS Out of Workshops (17 days)
/ 4/1932 - Modified AC Allce LT
/ /1974 - Scrapped NR9/74
.
Vehicle.............SV # Date...... Loc History............SV Notes
*L 1083.VA - 9/ 8/1917 NWS Built new WHB, Iron
21/ 5/1932 NWS Into Workshops -
/ 7/1932 - Modified AC Allce LT
7/ 7/1932 NWS To LB 1083.VA (48 days)
LB 1083.VA - circa 1956 - To L 1083.VA (v)
*L 1083.VA - / /1977 - Photograph #790
/ /1978 - Photograph #1132
*L 1084.VA - 9/ 8/1917 NWS Built new WHB, Iron
19/ 2/1932 NWS Into Workshops -
10/ 3/1932 NWS Out of Workshops (21 days)
/ 3/1932 - Modified AC Allce LT
circa 1978 - Off Register [v]
13/ 4/1978 RAA Sighting [RO]
*L 1085.VA - 9/ 8/1917 NWS Built new WHB, Iron
12/ 1/1931 NWS Into Workshops -
31/ 7/1931 NWS Out of Workshops (50 days)
/11/1931 - Modified Trans hook
/ 4/1932 - Modified AC Allce LT
*L 1086.VA - 14/ 8/1917 NWS Built new WHB, Iron
6/ 4/1932 NWS Into Workshops -
/ 4/1932 - Modified AC Allce LT
21/ 4/1932 NWS Out of Workshops (16 days)
*L 1087.VA - 14/ 8/1917 NWS Built new WHB, Iron
21/ 4/1932 NWS Into Workshops -
14/ 7/1932 NWS Out of Workshops (50 days)
/ 7/1932 - Modified AC Allce LT
/ /1970 - Scrapped R104
*L 1088.VA - 14/ 8/1917 NWS Built new WHB, Iron
8/ 3/1932 NWS Into Workshops -
/ 3/1932 - Modified AC Allce LT
1/ 4/1932 NWS Out of Workshops (25 days)
*L 1089.VA - 14/ 8/1917 NWS Built new WHB, Iron
3/ 5/1932 NWS Into Workshops -
/ 5/1932 - Modified AC Allce LT
24/ 5/1932 NWS Out of Workshops (22 days)
17/ 1/1961 NWS Scrapped -
*L 1090.VA - 14/ 8/1917 NWS Built new WHB, Iron
/12/1931 - Modified Trans hook
/ 5/1932 - Modified AC Allce LT
*L 1091.VA - 14/ 8/1917 NWS Built new WHB, Iron
/ 8/1931 - Modified Trans hook
/ 5/1932 - Modified AC Allce LT
/ /1975 - Scrapped RSN4/75
*L 1092.VA - 22/ 8/1917 NWS Built new WHB, Iron
14/ 5/1932 NWS Into Workshops -
/ 7/1932 - Modified AC Allce LT
7/ 7/1932 NWS To LB 1092.VA (50 days)
.
Vehicle.............SV # Date...... Loc History............SV Notes
*L 1093.VA - 22/ 8/1917 NWS Built new WHB, Iron
15/ 1/1931 NWS Into Workshops -
19/ 6/1931 NWS Out of Workshops (50 days)
23/ 2/1932 NWS Into Workshops -
9/ 3/1932 NWS Out of Workshops (16 days)
/ 3/1932 - Modified AC Allce LT
17/11/1981 SRD Scrapped [CRS], again 20/11/81, BOW
6/ 1/1982 - Off Register [CRS], again 3/12/81
*L 1094.VA - 22/ 8/1917 NWS Built new WHB, Iron
14/ 3/1931 NWS Into Workshops -
23/ 6/1931 NWS Out of Workshops (50 days)
18/ 1/1932 NWS Into Workshops -
17/ 2/1932 NWS Out of Workshops (31 days)
/ 2/1932 - Modified AC Allce LT
*L 1095.VA - 22/ 8/1917 NWS Built new WHB, Iron
21/ 5/1932 NWS Into Workshops -
/ 7/1932 - Modified AC Allce LT
7/ 7/1932 NWS To LB 1095.VA (48 days)
LB 1095.VA - circa 1958 - To L 1095.VA (v)
*L 1095.VA - 7/11/1980 - Off Register [CRS]
2/ 2/1981 BOW Scrapped [CRS]
*L 1096.VA - 22/ 8/1917 NWS Built new WHB, Iron
17/ 5/1932 NWS Into Workshops -
30/ 5/1932 NWS Out of Workshops (14 days)
/ 6/1932 - Modified AC Allce LT
*L 1097.VA - 22/ 8/1917 NWS Built new WHB, Iron
14/11/1930 NWS Into Workshops -
/ 8/1931 - Modified Trans hook
20/ 8/1931 NWS Out of Workshops (50 days)
/ 5/1932 - Modified AC Allce LT (6/32)
/ /1975 - Scrapped RSN3/75
*L 1098.VA - 22/ 8/1917 NWS Built new WHB, Iron
22/ 3/1932 NWS Into Workshops -
11/ 4/1932 NWS Out of Workshops (21 days)
/ 4/1932 - Modified AC Allce LT
*L 1099.VA - 29/ 8/1917 NWS Built new WHB, Iron
14/ 5/1932 NWS Into Workshops -
/ 6/1932 - Modified AC Allce LT
23/ 6/1932 NWS To LB 1099.VA (41 days)
LB 1099.VA - 28/ 8/1954 - To L 1099.VA -
*L 1100.VA - 29/ 8/1917 NWS Built new WHB, Iron
6/ 5/1931 NWS Into Workshops -
10/ 7/1931 NWS Out of Workshops (50 days)
/ 5/1932 - Modified AC Allce LT
13/ 8/1980 - Off Register [CRS]
30/ 1/1981 NWS Scrapped [CRS]
.
Vehicle.............SV # Date...... Loc History............SV Notes
*L 1101.VA - 29/ 8/1917 NWS Built new WHB, Iron
21/ 5/1932 NWS Into Workshops -
/ 6/1932 - Modified AC Allce LT
16/ 6/1932 NWS To LB 1101.VA (27 days)
*L 1102.VA - 29/ 8/1917 NWS Built new WHB, Iron
19/ 2/1932 NWS Into Workshops -
5/ 3/1932 NWS Out of Workshops (16 days)
/ 3/1932 - Modified AC Allce LT
5/ 3/1937 NWS Into Workshops -
19/ 7/1937 NWS Out of Workshops (50 days)
*L 1103.VA - 26/10/1918 NDP Built new WHB, Iron
/ 9/1931 - Modified Trans hook
/ 4/1932 - Modified AC Allce LT
/ /1974 - Scrapped RSN10/74
*L 1104.VA - 26/10/1918 NJU Built new WHB, Iron
4/12/1931 NWS Into Workshops -
15/12/1931 NWS Out of Workshops (12 days)
/12/1931 - Modified Trans hook
/ 5/1932 - Modified AC Allce LT
*L 1105.VA - 26/10/1918 NDO Built new WHB, Iron
8/ 1/1932 NWS Into Workshops -
/ 1/1932 - Modified Trans hook
9/ 2/1932 NWS Out of Workshops (33 days)
/ 5/1932 - Modified AC Allce LT
*L 1106.VA - 26/10/1918 NDO Built new WHB, Iron
31/ 7/1931 NWS Into Workshops -
9/ 9/1931 NWS Out of Workshops (41 days)
/ 9/1931 - Modified Trans hook
/ 5/1932 - Modified AC Allce LT
6/10/1936 NWS Into Workshops -
30/10/1936 NWS Out of Workshops (25 days)
*L 1107.VA - 26/10/1918 NDP Built new WHB, Iron
/11/1931 - Modified Trans hook
/ 5/1932 - Modified AC Allce LT
3/ 3/1980 SRD Scrapped [CRS]
*L 1108.VA - 26/10/1918 NJU Built new WHB, Iron
/11/1931 - Modified Trans hook
/ 5/1932 - Modified AC Allce LT
15/ 5/1980 BOW Off Register [CRS]
12/ 9/1980 BOW Scrapped [CRS]
*L 1109.VA - 2/11/1918 NDO Built new WHB, Iron
/11/1931 - Modified Trans hook
/ 5/1932 - Modified AC Allce LT
*L 1110.VA - 2/11/1918 NJU Built new WHB, Iron
14/ 5/1932 NWS Into Workshops -
/ 7/1932 - Modified AC Allce LT
21/ 7/1932 NWS Out of Workshops (50 days)
.
Vehicle.............SV # Date...... Loc History............SV Notes
*L 1111.VA - 2/11/1918 NDP Built new WHB, Iron
14/ 5/1932 NWS Into Workshops -
/ 6/1932 - Modified AC Allce LT
15/ 6/1932 NWS To LB 1111.VA (33 days)
LB 1111.VA - 14/ 4/1936 NWS Into Workshops -
28/ 8/1936 NWS Out of Workshops (50 days)
*L 1112.VA - 16/11/1918 NSM Built new WHB, Iron
11/ 3/1932 NWS Into Workshops -
30/ 3/1932 NWS Out of Workshops (20 days)
/ 4/1932 - Modified AC Allce LT
17/ 1/1961 NWS Scrapped -
*L 1113.VA - 16/11/1918 NSM Built new WHB, Iron
5/ 3/1932 NWS Into Workshops -
/ 3/1932 - Modified AC Allce LT
22/ 3/1932 NWS Out of Workshops (18 days)
6/10/1936 NWS Into Workshops -
19/11/1936 NWS Out of Workshops (45 days)
17/ 1/1961 NWS Scrapped -
*L 1114.VA - 16/11/1918 NJU Built new WHB, Iron
/11/1931 - Modified Trans hook
/ 5/1932 - Modified AC Allce LT
*L 1115.VA - 16/11/1918 NDP Built new WHB, Iron
4/12/1931 NWS Into Workshops -
8/ 1/1932 NWS Out of Workshops (36 days)
/ 1/1932 - Modified Trans hook
/ 5/1932 - Modified AC Allce LT
*L 1116.VA - 16/11/1918 NDO Built new WHB, Iron
3/ 6/1932 NWS Into Workshops -
15/ 7/1932 NWS Out of Workshops (43 days)
/ 7/1932 - Modified AC Allce LT
/ /1977 - Scrapped NR0977
*L 1117.VA - 16/11/1918 NSM Built new WHB, Iron
8/ 3/1932 NWS Into Workshops -
/ 3/1932 - Modified AC Allce LT
23/ 3/1932 NWS Out of Workshops (16 days)
14/ 3/1936 NWS Into Workshops -
16/ 7/1936 NWS Out of Workshops (50 days)
*L 1118.VA - 22/11/1918 NDO Built new WHB, Iron
16/ 2/1932 NWS Into Workshops -
3/ 3/1932 NWS Out of Workshops (17 days)
/ 3/1932 - Modified AC Allce LT
16/ 6/1936 NWS Into Workshops -
18/ 8/1936 NWS Out of Workshops (50 days)
/ 3/1955 NWS Modified Fitted 1 3/4" plain gratings
/ /1971 - Scrapped R104
.
Vehicle.............SV # Date...... Loc History............SV Notes
*L 1119.VA - 22/11/1918 NDP Built new WHB, Iron
21/ 5/1932 NWS Into Workshops -
/ 6/1932 - Modified AC Allce LT
15/ 6/1932 NWS To LB 1119.VA (26 days)
LB 1119.VA - 1/ 5/1936 NWS Into Workshops (as L, with 1163)
8/ 8/1936 NWS Out of Workshops (50 days)
circa 1956 - To L 1119.VA (v)
*L 1119.VA - 14/ 1/1983 - Off Register [CRS]
24/ 5/1983 BOW Scrapped [CRS]
*L 1120.VA - 22/11/1918 NJU Built new WHB, Iron
20/ 4/1932 NWS Into Workshops -
7/ 5/1932 NWS Out of Workshops (18 days)
/ 5/1932 - Modified AC Allce LT
17/ 1/1961 NWS Scrapped -
*L 1121.VA - 22/11/1918 NDO Built new WHB, Iron
28/ 1/1932 NWS Into Workshops -
/ 2/1932 - Modified AC Allce LT
22/ 2/1932 NWS Out of Workshops (26 days)
12/ 1/1961 NWS Scrapped -
*L 1122.VA - 27/11/1918 NJU Built new WHB, Iron
23/ 2/1932 NWS Into Workshops -
15/ 3/1932 NWS Out of Workshops (22 days)
/ 3/1932 - Modified AC Allce LT
17/ 1/1961 NWS Scrapped -
*L 1123.VA - 27/11/1918 NDP Built new WHB, Iron
8/ 3/1932 NWS Into Workshops -
/ 3/1932 - Modified AC Allce LT
23/ 3/1932 NWS Out of Workshops (16 days)
6/ 3/1936 NWS Into Workshops -
28/ 7/1936 NWS Out of Workshops (50 days)
*L 1124.VA - 29/11/1918 NSM Built new WHB, Iron
21/ 4/1932 NWS Into Workshops -
4/ 5/1932 NWS Out of Workshops (14 days)
/ 5/1932 - Modified AC Allce LT
/ /1970 - Scrapped R104
*L 1125.VA - 6/12/1918 NSM Built new WHB, Iron
/10/1931 - Modified Trans hook
/ 4/1932 - Modified AC Allce LT
*L 1126.VA - 6/12/1918 NDP Built new WHB, Iron
/10/1931 - Modified Trans hook
/ 5/1932 - Modified AC Allce LT
18/ 5/1982 - Off Register [CRS]
*L 1127.VA - 6/12/1918 NSM Built new WHB, Iron
6/ 1/1932 NWS Into Workshops -
/ 1/1932 - Modified Trans hook
26/ 1/1932 NWS Out of Workshops (21 days)
/ 5/1932 - Modified AC Allce LT
.
Vehicle.............SV # Date...... Loc History............SV Notes
*L 1128.VA - 6/12/1918 NDO Built new WHB, Iron
/ 8/1931 - Modified Trans hook
/ 4/1932 - Modified AC Allce LT
*L 1129.VA - 14/12/1918 NJU Built new WHB, Iron
/11/1931 - Modified Trans hook
/ 5/1932 - Modified AC Allce LT
*L 1130.VA - 14/12/1918 NDO Built new WHB, Iron
21/ 5/1932 NWS Into Workshops -
/ 6/1932 - Modified AC Allce LT
15/ 6/1932 NWS To LB 1130.VA (26 days)
LB 1130.VA - 30/11/1936 NWS Into Workshops -
30/ 6/1937 NWS Out of Workshops (50 days)
circa 1959 - To L 1130.VA -
*L 1130.VA - / /1976 - Scrapped RSN6/76
*L 1131.VA - 16/12/1918 NJU Built new WHB, Iron
/10/1931 - Modified Trans hook
/ 5/1932 - Modified AC Allce LT
*L 1132.VA - 16/12/1918 NDP Built new WHB, Iron
28/ 1/1932 NWS Into Workshops -
/ 2/1932 - Modified AC Allce LT
22/ 2/1932 NWS Out of Workshops (26 days)
8/ 9/1936 NWS Into Workshops -
24/10/1936 NWS Out of Workshops (47 days)
12/ 1/1961 NWS Scrapped -
*L 1133.VA - 20/12/1918 NJU Built new WHB, Iron
/10/1931 - Modified Trans hook
/ 5/1932 - Modified AC Allce LT
*L 1134.VA - 20/12/1918 NDP Built new WHB, Iron
11/ 3/1932 NWS Into Workshops -
/ 3/1932 - Modified AC Allce LT
23/ 3/1932 NWS Out of Workshops (13 days)
9/ 3/1937 NWS Into Workshops -
17/ 7/1937 NWS Out of Workshops (50 days)
*L 1135.VA - 20/12/1918 NDO Built new WHB, Iron
/ 8/1931 - Modified Trans hook
/ 5/1932 - Modified AC Allce LT
20/ 3/1937 NWS Into Workshops -
5/ 7/1937 NWS Out of Workshops (50 days)
*L 1136.VA - 20/12/1918 NSM Built new WHB, Iron
11/ 3/1932 NWS Into Workshops -
30/ 3/1932 NWS Out of Workshops (20 days)
/ 4/1932 - Modified AC Allce LT
.
Vehicle.............SV # Date...... Loc History............SV Notes
*L 1137.VA - 14/ 1/1919 NSM Built new WHB, Iron
/11/1931 - Modified Trans hook
/ 5/1932 - Modified AC Allce LT
5/ 3/1937 NWS Into Workshops -
13/ 7/1937 NWS Out of Workshops (50 days)
7/11/1980 - Off Register [CRS]
29/ 1/1981 BOW Scrapped [CRS]
*L 1138.VA - 14/ 1/1919 NDP Built new WHB, Iron
11/ 3/1932 NWS Into Workshops -
/ 3/1932 - Modified AC Allce LT
23/ 3/1932 NWS Out of Workshops (13 days)
17/ 3/1937 NWS Into Workshops -
13/ 7/1937 NWS Out of Workshops (50 days)
*L 1139.VA - 14/ 1/1919 NDO Built new WHB, Iron
/ 7/1932 - Modified AC Allce LT
*L 1140.VA - 14/ 1/1919 NDO Built new WHB, Iron
3/ 5/1932 NWS Into Workshops -
/ 5/1932 - Modified AC Allce LT
20/ 5/1932 NWS Out of Workshops (18 days)
15/ 5/1936 NWS Into Workshops -
21/ 7/1936 NWS Out of Workshops (50 days)
17/ 1/1961 NWS Scrapped -
*L 1141.VA - 14/ 1/1919 NSM Built new WHB, Iron
/ 8/1932 - Modified AC Allce LT
*L 1142.VA - 18/ 1/1919 NDP Built new WHB, Iron
10/ 5/1932 NWS Into Workshops -
/ 6/1932 - Modified AC Allce LT
23/ 6/1932 NWS To LB 1142.VA (45 days)
*L 1143.VA - 18/ 1/1919 NDO Built new WHB, Iron
21/ 5/1932 NWS Into Workshops -
/ 6/1932 - Modified AC Allce LT
16/ 6/1932 NWS To LB 1143.VA (27 days)
LB 1143.VA - 28/ 8/1954 - To L 1143.VA -
*L 1144.VA - 18/ 1/1919 NDP Built new WHB, Iron
/12/1931 - Modified Trans hook
/ 5/1932 - Modified AC Allce LT
8/ 9/1936 NWS Into Workshops -
23/10/1936 NWS Out of Workshops (46 days)
*L 1145.VA - 25/ 1/1919 NWS Built new WHB, Iron
14/ 5/1932 NWS Into Workshops -
/ 7/1932 - Modified AC Allce LT
7/ 7/1932 NWS To LB 1145.VA (50 days)
LB 1145.VA - circa 1959 - To L 1145.VA -
*L 1145.VA - / /1969 - Scrapped -
.
Vehicle.............SV # Date...... Loc History............SV Notes
*L 1146.VA - 25/ 1/1919 NWS Built new WHB, Iron
11/ 3/1932 NWS Into Workshops -
/ 3/1932 - Modified AC Allce LT
23/ 3/1932 NWS Out of Workshops (13 days)
2/ 3/1937 NWS Into Workshops -
5/ 7/1937 NWS Out of Workshops (50 days)
11/ 6/1970 SRD Scrapped -
*L 1147.VA - 25/ 1/1919 NWS Built new WHB, Iron
22/ 3/1932 NWS Into Workshops -
11/ 4/1932 NWS Out of Workshops (21 days)
/ 4/1932 - Modified AC Allce LT
6/10/1936 NWS Into Workshops -
19/11/1936 NWS Out of Workshops (45 days)
*L 1148.VA - 6/ 2/1919 NWS Built new WHB, Iron
23/ 2/1932 NWS Into Workshops -
9/ 3/1932 NWS Out of Workshops (16 days)
/ 3/1932 - Modified AC Allce LT
*L 1149.VA - 6/ 2/1919 NWS Built new WHB, Iron
15/ 4/1932 NWS Into Workshops -
/ 4/1932 - Modified AC Allce LT
30/ 4/1932 NWS Out of Workshops (16 days)
*L 1150.VA - 6/ 2/1919 NWS Built new WHB, Iron
9/ 2/1932 NWS Into Workshops -
/ 2/1932 - Modified AC Allce LT
25/ 2/1932 NWS Out of Workshops (17 days)
30/ 6/1936 NWS Into Workshops -
18/ 9/1936 NWS Out of Workshops (50 days)
17/ 1/1961 NWS Scrapped -
*L 1151.VA - 7/ 2/1919 NWS Built new WHB, Iron
9/ 2/1932 NWS Into Workshops -
1/ 3/1932 NWS Out of Workshops (22 days)
/ 3/1932 - Modified AC Allce LT
*L 1152.VA - 7/ 2/1919 NWS Built new WHB, Iron
/ 7/1932 - Modified AC Allce LT
*L 1153.VA - 30/ 6/1920 NWS Built new WHB, Iron
9/12/1931 NWS Into Workshops -
/12/1931 - Modified Trans hook
22/12/1931 NWS Out of Workshops (14 days)
/ 6/1932 - Modified AC Allce LT
/ /1970 - Scrapped R104
*L 1154.VA - 30/ 6/1920 NWS Built new WHB, Iron
21/ 4/1932 NWS Into Workshops -
11/ 5/1932 NWS Out of Workshops (21 days)
/ 5/1932 - Modified AC Allce LT
/ /1973 - Scrapped NR8/73
.
Vehicle.............SV # Date...... Loc History............SV Notes
*L 1155.VA - 30/ 6/1920 NWS Built new WHB, Iron
24/11/1931 NWS Into Workshops -
17/12/1931 NWS Out of Workshops (24 days)
/12/1931 - Modified Trans hook
/ 5/1932 - Modified AC Allce LT
/ /1976 - Scrapped RSN10/76
*L 1156.VA - 30/ 6/1920 NWS Built new WHB, Iron
19/ 2/1932 NWS Into Workshops -
10/ 3/1932 NWS Out of Workshops (21 days)
/ 3/1932 - Modified AC Allce LT
*L 1157.VA - 30/ 6/1920 NWS Built new WHB, Iron
14/ 5/1932 NWS Into Workshops -
/ 7/1932 - Modified AC Allce LT
7/ 7/1932 NWS To LB 1157.VA (50 days)
*L 1158.VA - 30/ 6/1920 NWS Built new WHB, Iron
6/ 4/1932 NWS Into Workshops -
19/ 4/1932 NWS Out of Workshops (14 days)
/ 4/1932 - Modified AC Allce LT
20/ 3/1936 NWS Into Workshops -
31/ 7/1936 NWS Out of Workshops (50 days)
17/ 1/1961 NWS Scrapped -
*L 1159.VA - 30/ 6/1920 NWS Built new WHB, Iron
3/ 5/1932 NWS Into Workshops -
/ 5/1932 - Modified AC Allce LT
21/ 5/1932 NWS Out of Workshops (19 days)
*L 1160.VA - 30/ 6/1920 NWS Built new WHB, Iron
3/ 8/1931 NWS Into Workshops -
4/ 9/1931 NWS Out of Workshops (33 days)
/ 9/1931 - Modified Trans hook
/ 5/1932 - Modified AC Allce LT
23/ 8/1982 - Off Register [CRS]
8/12/1982 SRD Scrapped [CRS]: ex BOW
*L 1161.VA - 7/ 7/1920 NWS Built new WHB, Iron
10/ 5/1932 NWS Into Workshops -
/ 5/1932 - Modified AC Allce LT
25/ 5/1932 NWS Out of Workshops (16 days)
/ /1971 - Scrapped R104
*L 1162.VA - 7/ 7/1920 NWS Built new WHB, Iron
21/ 4/1932 NWS Into Workshops -
5/ 5/1932 NWS Out of Workshops (15 days)
/ 5/1932 - Modified AC Allce LT
6/ 7/1959 NWS Scrapped -
*L 1163.VA - 7/ 7/1920 NWS Built new WHB, Iron
21/ 4/1932 NWS Into Workshops -
/ 6/1932 - Modified AC Allce LT
15/ 6/1932 NWS To LB 1163.VA (50 days)
LB 1163.VA - 1/ 5/1936 NWS Into Workshops (as L, with 1119)
8/ 8/1936 NWS Out of Workshops (50 days)
.
Vehicle.............SV # Date...... Loc History............SV Notes
*L 1164.VA - 7/ 7/1920 NWS Built new WHB, Iron
3/ 5/1932 NWS Into Workshops -
/ 5/1932 - Modified AC Allce LT
25/ 5/1932 NWS Out of Workshops (23 days)
16/12/1964 NWS To KCC 15.VA -
KCC 15.VA 2nd circa 1967 - To IK 15.VA [NIO]
*L 1165.VA - 3/ 8/1920 NWS Built new WHB, Iron
5/ 3/1932 NWS Into Workshops -
/ 3/1932 - Modified AC Allce LT
22/ 3/1932 NWS Out of Workshops (18 days)
/ /1975 - Scrapped RSN5/75
*L 1166.VA - 3/ 8/1920 NWS Built new WHB, Iron
16/ 2/1932 NWS Into Workshops -
3/ 3/1932 NWS Out of Workshops (17 days)
/ 3/1932 - Modified AC Allce LT
27/ 3/1936 NWS Into Workshops -
7/ 9/1936 NWS Out of Workshops (50 days)
17/ 1/1961 NWS Scrapped -
*L 1167.VA - 3/ 8/1920 NWS Built new WHB, Iron
8/ 4/1932 NWS Into Workshops -
/ 4/1932 - Modified AC Allce LT
23/ 4/1932 NWS Out of Workshops (16 days)
*L 1168.VA - 3/ 8/1920 NWS Built new WHB, Iron
/11/1931 - Modified Trans hook
/ 4/1932 - Modified AC Allce LT
1/ 5/1936 NWS Into Workshops -
5/ 8/1936 NWS Out of Workshops (50 days)
*L 1169.VA - 3/ 8/1920 NWS Built new WHB, Iron
8/ 3/1932 NWS Into Workshops -
/ 3/1932 - Modified AC Allce LT
23/ 3/1932 NWS Out of Workshops (16 days)
*L 1170.VA - 3/ 8/1920 NWS Built new WHB, Iron
14/ 5/1932 NWS Into Workshops -
1/ 6/1932 NWS Out of Workshops (19 days)
/ 6/1932 - Modified AC Allce LT
17/ 4/1936 NWS Into Workshops -
20/ 8/1936 NWS Out of Workshops (50 days)
12/ 1/1961 NWS Scrapped -
*L 1171.VA - 12/ 8/1920 NWS Built new WHB, Iron
9/ 2/1932 NWS Into Workshops -
/ 2/1932 - Modified AC Allce LT
25/ 2/1932 NWS Out of Workshops (17 days)
17/11/1936 NWS Into Workshops -
8/ 7/1937 NWS Out of Workshops (50 days)
.
Vehicle.............SV # Date...... Loc History............SV Notes
*L 1172.VA - 12/ 8/1920 NWS Built new WHB, Iron
19/ 3/1932 NWS Into Workshops -
/ 3/1932 - Modified AC Allce LT
5/ 4/1932 NWS Out of Workshops (18 days)
9/ 6/1936 NWS Into Workshops -
1/ 8/1936 NWS Out of Workshops (50 days)
*L 1173.VA - 12/ 8/1920 NWS Built new WHB, Iron
/11/1931 - Modified Trans hook
/ 5/1932 - Modified AC Allce LT
*L 1174.VA - 7/ 9/1920 NWS Built new WHB, Iron
19/ 2/1932 NWS Into Workshops -
15/ 3/1932 NWS Out of Workshops (26 days)
/ 3/1932 - Modified AC Allce LT
3/ 4/1936 NWS Into Workshops -
16/ 7/1936 NWS Out of Workshops (50 days)
*L 1175.VA - 7/ 9/1920 NWS Built new WHB, Iron
21/ 5/1932 NWS Into Workshops -
/ 6/1932 - Modified AC Allce LT
16/ 6/1932 NWS To LB 1175.VA (27 days)
*L 1176.VA - 7/ 9/1920 NWS Built new WHB, Iron
17/ 5/1932 NWS Into Workshops -
30/ 5/1932 NWS Out of Workshops (14 days)
/ 6/1932 - Modified AC Allce LT
24/ 9/1976 NET Photograph #673.21
circa 1978 - Off Register [v]
13/ 4/1978 RAA Sighting [RO]
*L 1177.VA - 30/ 9/1920 NWS Built new WHB, Iron
28/ 1/1932 NWS Into Workshops -
/ 2/1932 - Modified AC Allce LT
22/ 2/1932 NWS Out of Workshops (26 days)
28/ 2/1980 NWS Scrapped [CRS]
*L 1178.VA - 30/ 9/1920 NWS Built new WHB, Iron
21/ 5/1932 NWS Into Workshops -
/ 6/1932 - Modified AC Allce LT
15/ 6/1932 NWS To LB 1178.VA (26 days)
*L 1179.VA - 30/ 9/1920 NWS Built new WHB, Iron
25/ 5/1932 NWS Into Workshops -
/ 6/1932 - Modified AC Allce LT
16/ 6/1932 NWS To LB 1179.VA (23 days)
LB 1179.VA - 17/ 1/1961 NWS Scrapped -
*L 1180.VA - 21/10/1920 NWS Built new WHB, Iron
6/ 4/1932 NWS Into Workshops -
/ 4/1932 - Modified AC Allce LT
21/ 4/1932 NWS Out of Workshops (16 days)
circa 1978 - Off Register [v]
13/ 4/1978 RAA Sighting [RO]
.
Vehicle.............SV # Date...... Loc History............SV Notes
*L 1181.VA - 21/10/1920 NWS Built new WHB, Iron
21/ 4/1932 NWS Into Workshops -
/ 5/1932 - Modified AC Allce LT
27/ 5/1932 NWS Out of Workshops (37 days)
*L 1182.VA - 21/10/1920 NWS Built new WHB, Iron
3/ 5/1932 NWS Into Workshops -
/ 5/1932 - Modified AC Allce LT
20/ 5/1932 NWS Out of Workshops (18 days)
*L 1183.VA - 17/12/1920 NWS Built new WHB, Iron
1/ 3/1932 NWS Into Workshops -
17/ 3/1932 NWS Out of Workshops (17 days)
/ 3/1932 - Modified AC Allce LT
14/ 3/1936 NWS Into Workshops -
25/ 7/1936 NWS Out of Workshops (50 days)
*L 1184.VA - 8/12/1920 NWS Built new WHB, Iron
19/ 3/1932 NWS Into Workshops -
/ 3/1932 - Modified AC Allce LT, (3/34)
5/ 4/1932 NWS Out of Workshops (18 days)
/ /1976 - Scrapped RSN11/76
*L 1185.VA - 8/12/1920 NWS Built new WHB, Iron
18/ 2/1932 NWS Into Workshops -
/ 3/1932 - Modified AC Allce LT
22/ 3/1932 NWS Out of Workshops (34 days)
10/12/1935 NWS Into Workshops -
11/ 2/1936 NWS Out of Workshops (50 days)
*L 1186.VA - 8/12/1920 NWS Built new WHB, Iron
/ 8/1931 - Modified Trans hook
/ 5/1932 - Modified AC Allce LT
28/ 4/1936 NWS Into Workshops -
28/ 8/1936 NWS Out of Workshops (50 days)
17/ 1/1961 NWS Scrapped -
*L 1187.VA - 8/12/1920 NWS Built new WHB, Iron
23/ 2/1932 NWS Into Workshops -
15/ 3/1932 NWS Out of Workshops (22 days)
/ 3/1932 - Modified AC Allce LT
/ /1970 - Scrapped R104
*L 1188.VA - 8/12/1920 NWS Built new WHB, Iron
8/ 1/1932 NWS Into Workshops -
/ 1/1932 - Modified Trans hook
25/ 1/1932 NWS Out of Workshops (18 days)
/ 5/1932 - Modified AC Allce LT
26/ 3/1965 - To KCC 166.VA -
KCC 166.VA - circa 1969 - To IK 166.VA (v)
IK 166.VA - / /1976 - Photograph #525
/ /1979 - Photograph #1319
16/12/1980 NMW Off Register [CRS]
*L 1189.VA - 8/12/1920 NWS Built new WHB, Iron
10/ 5/1932 NWS Into Workshops -
/ 6/1932 - Modified AC Allce LT
23/ 6/1932 NWS To LB 1189.VA (45 days)
.
Vehicle.............SV # Date...... Loc History............SV Notes
*L 1190.VA - 17/12/1920 NWS Built new WHB, Iron
22/ 1/1932 NWS Into Workshops -
11/ 2/1932 NWS Out of Workshops (21 days)
/ 2/1932 - Modified AC Allce LT
22/ 9/1936 NWS Into Workshops -
2/11/1936 NWS Out of Workshops (42 days)
*L 1191.VA - 17/12/1920 NWS Built new WHB, Iron
9/ 2/1932 NWS Into Workshops -
/ 2/1932 - Modified AC Allce LT
25/ 2/1932 NWS Out of Workshops (17 days)
28/ 8/1936 NWS Into Workshops -
27/10/1936 NWS Out of Workshops (50 days)
*L 1192.VA - 17/12/1920 NWS Built new WHB, Iron
/11/1931 - Modified Trans hook
/ 4/1932 - Modified AC Allce LT
24/ 3/1936 NWS Into Workshops -
19/ 8/1936 NWS Out of Workshops (50 days)
12/ 1/1961 NWS Scrapped -
*L 1193.VA - 17/12/1920 NWS Built new WHB, Iron
11/ 3/1932 NWS Into Workshops -
31/ 3/1932 NWS Out of Workshops (21 days)
/ 4/1932 - Modified AC Allce LT
6/ 7/1959 NWS Scrapped -
*L 1194.VA - 17/12/1920 NWS Built new WHB, Iron
/ 8/1932 - Modified AC Allce LT
17/ 1/1961 NWS Scrapped -
*L 1195.VA - 21/12/1920 NWS Built new WHB, Iron
5/ 3/1932 NWS Into Workshops -
/ 3/1932 - Modified AC Allce LT
21/ 3/1932 NWS Out of Workshops (17 days)
*L 1196.VA - 21/12/1920 NWS Built new WHB, Iron
/11/1931 - Modified Trans hook
/ 4/1932 - Modified AC Allce LT
*L 1197.VA - 21/12/1920 NWS Built new WHB, Iron
/10/1931 - Modified Trans hook
/ 5/1932 - Modified AC Allce LT
22/11/1935 NWS Into Workshops -
10/ 2/1936 NWS Out of Workshops (50 days)
*L 1198.VA - 21/12/1920 NWS Built new WHB, Iron
11/ 3/1932 NWS Into Workshops -
31/ 3/1932 NWS Out of Workshops (21 days)
/ 4/1932 - Modified AC Allce LT
20/ 3/1936 NWS Into Workshops -
29/ 6/1937 NWS Out of Workshops (50 days)
*L 1199.VA - 21/12/1920 NWS Built new WHB, Iron
10/ 5/1932 NWS Into Workshops -
/ 6/1932 - Modified AC Allce LT
16/ 6/1932 NWS To LB 1199.VA (38 days)
.
Vehicle.............SV # Date...... Loc History............SV Notes
*L 1200.VA - 21/12/1920 NWS Built new WHB, Iron
24/ 5/1932 NWS Into Workshops -
/ 6/1932 - Modified AC Allce LT
16/ 6/1932 NWS To LB 1200.VA (24 days); R1:No reference
LB 1200.VA - circa 1959 - To L 1200.VA (v)
*L 1200.VA - 14/ 1/1974 WOD Photograph #156.0A,.1,.2: VO,LM, roofline, end, side, door
15/ 1/1981 - Off Register [CRS]
12/ 2/1981 BOW Scrapped [CRS]
*L 1201.VA - 21/12/1920 NWS Built new WHB, Iron
19/ 4/1932 NWS Into Workshops -
4/ 5/1932 NWS Out of Workshops (16 days)
/ 5/1932 - Modified AC Allce LT
1/ 4/1981 BOW Off Register -
*L 1202.VA - 21/12/1920 NWS Built new WHB, Iron
23/ 4/1932 NWS Into Workshops -
7/ 5/1932 NWS Out of Workshops (15 days)
/ 5/1932 - Modified AC Allce LT
17/ 1/1961 NWS Scrapped -
*L 1203.VA - 26/11/1924 NWS Built new WHB, Iron
15/ 3/1932 NWS Into Workshops -
31/ 3/1932 NWS Out of Workshops (17 days)
/ 4/1932 - Modified AC Allce LT
*L 1204.VA - 26/11/1924 NWS Built new WHB, Iron
22/ 1/1932 NWS Into Workshops -
11/ 2/1932 NWS Out of Workshops (21 days)
/ 2/1932 - Modified AC Allce LT
1/ 7/1947 RID Damaged In collision
5/ 8/1947 - Off Register -
/ 8/1947 - Scrapped -
*L 1205.VA - 26/11/1924 NWS Built new WHB, Iron
29/ 3/1932 NWS Into Workshops -
15/ 4/1932 NWS Out of Workshops (18 days)
/ 4/1932 - Modified AC Allce LT
/ /1971 - Scrapped R104
*L 1206.VA - 26/11/1924 NWS Built new WHB, Iron
19/ 2/1932 NWS Into Workshops -
5/ 3/1932 NWS Out of Workshops (16 days)
/ 3/1932 - Modified AC Allce LT
*L 1207.VA - 26/11/1924 NWS Built new WHB, Iron
14/ 2/1931 NWS Into Workshops -
1/ 7/1931 NWS Out of Workshops (50 days)
10/ 5/1932 NWS Into Workshops -
2/ 6/1932 NWS Out of Workshops (24 days)
/ 6/1932 - Modified AC Allce LT
/ /1970 - Scrapped R104
*L 1208.VA - 26/11/1924 NWS Built new WHB, Iron
8/ 4/1932 NWS Into Workshops -
/ 4/1932 - Modified AC Allce LT
22/ 4/1932 NWS Out of Workshops (15 days)
.
Vehicle.............SV # Date...... Loc History............SV Notes
*L 1209.VA - 26/11/1924 NWS Built new WHB, Iron
19/ 2/1932 NWS Into Workshops -
10/ 3/1932 NWS Out of Workshops (21 days)
/ 3/1932 - Modified AC Allce LT
*L 1210.VA - 26/11/1924 NWS Built new WHB, Iron
11/ 3/1932 NWS Into Workshops -
/ 3/1932 - Modified AC Allce LT
23/ 3/1932 NWS Out of Workshops (13 days)
/ /1971 - Scrapped R104
*L 1211.VA - 26/11/1924 NWS Built new WHB, Iron
/ 3/1932 - Modified AC Allce LT
22/ 3/1932 NWS Into Workshops -
9/ 4/1932 NWS Out of Workshops (19 days)
17/ 1/1961 NWS Scrapped -
*L 1212.VA - 26/11/1924 NWS Built new WHB, Iron
6/ 4/1932 NWS Into Workshops -
19/ 4/1932 NWS Out of Workshops (14 days)
/ 4/1932 - Modified AC Allce LT
*L 1213.VA - 3/12/1924 NWS Built new WHB, Iron
19/ 5/1932 NWS Into Workshops -
/ 6/1932 - Modified AC Allce LT
23/ 6/1932 NWS To LB 1213.VA (36 days)
LB 1213.VA - 17/ 1/1961 NWS Scrapped -
*L 1214.VA - 3/12/1924 NWS Built new WHB, Iron
10/ 5/1932 NWS Into Workshops -
/ 6/1932 - Modified AC Allce LT
15/ 6/1932 NWS To LB 1214.VA (37 days)
LB 1214.VA - circa 1957 - To L 1214.VA (v)
*L 1214.VA - 7/11/1980 - Off Register [CRS]: Melb Yard Car Sidings
*L 1215.VA - 3/12/1924 NWS Built new WHB, Iron
23/ 4/1932 NWS Into Workshops -
5/ 5/1932 NWS Out of Workshops (13 days)
/ 5/1932 - Modified AC Allce LT
17/ 1/1961 NWS Scrapped -
*L 1216.VA - 3/12/1924 NWS Built new WHB, Iron
/10/1931 - Modified Trans hook
/ 5/1932 - Modified AC Allce LT
*L 1217.VA - 3/12/1924 NWS Built new WHB, Iron
/ 9/1931 - Modified Trans hook
/ 5/1932 - Modified AC Allce LT
*L 1218.VA - 3/12/1924 NWS Built new WHB, Iron
21/ 4/1932 NWS Into Workshops -
4/ 5/1932 NWS Out of Workshops (14 days)
/ 5/1932 - Modified AC Allce LT
16/12/1980 NMW Off Register [CRS]
.
Vehicle.............SV # Date...... Loc History............SV Notes
*L 1219.VA - 8/12/1924 NWS Built new WHB, Iron
9/12/1931 NWS Into Workshops -
19/12/1931 NWS Out of Workshops (11 days)
/12/1931 - Modified Trans hook
/ 5/1932 - Modified AC Allce LT
*L 1220.VA - 8/12/1924 NWS Built new WHB, Iron
9/ 2/1932 NWS Into Workshops -
1/ 3/1932 NWS Out of Workshops (22 days)
/ 3/1932 - Modified AC Allce LT
/ /1970 - Scrapped -
*L 1221.VA - 8/12/1924 NWS Built new WHB, Iron
16/ 2/1932 NWS Into Workshops -
/ 3/1932 - Modified AC Allce LT
22/ 3/1932 NWS Out of Workshops (36 days)
/ /1973 - Scrapped NR8/73
*L 1222.VA - 8/12/1924 NWS Built new WHB, Iron
27/ 2/1932 NWS Into Workshops -
11/ 3/1932 NWS Out of Workshops (14 days)
/ 3/1932 - Modified AC Allce LT
*L 1223.VA - 8/12/1924 NWS Built new WHB, Iron
26/ 4/1932 NWS Into Workshops -
9/ 5/1932 NWS Out of Workshops (14 days)
/ 5/1932 - Modified AC Allce LT
*L 1224.VA - 8/12/1924 NWS Built new WHB, Iron
19/ 4/1932 NWS Into Workshops -
3/ 5/1932 NWS Out of Workshops (15 days)
/ 5/1932 - Modified AC Allce LT
*L 1225.VA - 8/12/1924 NWS Built new WHB, Iron
21/ 5/1932 NWS Into Workshops -
/ 6/1932 - Modified AC Allce LT
16/ 6/1932 NWS To LB 1225.VA (27 days)
*L 1226.VA - 8/12/1924 NWS Built new WHB, Iron
11/ 3/1932 NWS Into Workshops -
/ 3/1932 - Modified AC Allce LT
23/ 3/1932 NWS Out of Workshops (13 days)
15/10/1959 NWS Scrapped -
*L 1227.VA - 8/12/1924 NWS Built new WHB, Iron
21/ 4/1932 NWS Into Workshops -
/ 5/1932 - Modified AC Allce LT
26/ 5/1932 NWS Out of Workshops (36 days)
*L 1228.VA - 8/12/1924 NWS Built new WHB, Iron
6/ 1/1932 NWS Into Workshops -
14/ 1/1932 NWS Out of Workshops (9 days)
/ 1/1932 - Modified Trans hook
/ 5/1932 - Modified AC Allce LT
.
Vehicle.............SV # Date...... Loc History............SV Notes
*L 1229.VA - 11/12/1924 NWS Built new WHB, Iron
8/ 1/1932 NWS Into Workshops -
/ 1/1932 - Modified Trans hook
23/ 1/1932 NWS Out of Workshops (16 days)
/ 5/1932 - Modified AC Allce LT
/ /1969 - Scrapped -
*L 1230.VA - 11/12/1924 NWS Built new WHB, Iron
29/ 1/1932 NWS Into Workshops -
17/ 2/1932 NWS Out of Workshops (20 days)
/ 2/1932 - Modified AC Allce LT
*L 1231.VA - 11/12/1924 NWS Built new WHB, Iron
/ 8/1931 - Modified Trans hook
/ 5/1932 - Modified AC Allce LT
*L 1232.VA - 11/12/1924 NWS Built new WHB, Iron
26/ 4/1932 NWS Into Workshops -
17/ 5/1932 NWS Out of Workshops (22 days)
/ 5/1932 - Modified AC Allce LT
/ /1970 - Scrapped -
*L 1233.VA - 18/12/1924 NWS Built new WHB, Iron
8/ 1/1932 NWS Into Workshops -
/ 1/1932 - Modified Trans hook
23/ 1/1932 NWS Out of Workshops (16 days)
/ 5/1932 - Modified AC Allce LT
18/ 5/1982 - Off Register [CRS]
*L 1234.VA - 18/12/1924 NWS Built new WHB, Iron
5/ 3/1932 NWS Into Workshops -
1/ 4/1932 NWS Out of Workshops (28 days)
/ 4/1932 - Modified AC Allce LT
*L 1235.VA - 18/12/1924 NWS Built new WHB, Iron
18/12/1931 NWS Into Workshops -
7/ 1/1932 NWS Out of Workshops (21 days)
/ 1/1932 - Modified Trans hook
/ 4/1932 - Modified AC Allce LT
*L 1236.VA - 18/12/1924 NWS Built new WHB, Iron
3/ 5/1932 NWS Into Workshops -
/ 5/1932 - Modified AC Allce LT
24/ 5/1932 NWS Out of Workshops (22 days)
*L 1237.VA - 3/ 2/1925 NWS Built new WHB, Iron
4/12/1931 NWS Into Workshops -
17/12/1931 NWS Out of Workshops (14 days)
/12/1931 - Modified Trans hook
/ 5/1932 - Modified AC Allce LT
*L 1238.VA - 3/ 2/1925 NWS Built new WHB, Iron
26/ 4/1932 NWS Into Workshops -
14/ 5/1932 NWS Out of Workshops (19 days)
/ 5/1932 - Modified AC Allce LT
/ /1971 - Scrapped R104
.
Vehicle.............SV # Date...... Loc History............SV Notes
*L 1239.VA - 3/ 2/1925 NWS Built new WHB, Iron
8/ 4/1932 NWS Into Workshops -
/ 4/1932 - Modified AC Allce LT
22/ 4/1932 NWS Out of Workshops (15 days)
/ /1974 - Scrapped NR5/74
*L 1240.VA - 3/ 2/1925 NWS Built new WHB, Iron
15/ 4/1932 NWS Into Workshops -
/ 4/1932 - Modified AC Allce LT
29/ 4/1932 NWS Out of Workshops (15 days)
*L 1241.VA - 3/ 2/1925 NWS Built new WHB, Iron
10/ 5/1932 NWS Into Workshops -
/ 6/1932 - Modified AC Allce LT
15/ 6/1932 NWS To LB 1241.VA (37 days)
LB 1241.VA - 28/ 8/1954 - To L 1241.VA -
*L 1242.VA - 3/ 2/1925 NWS Built new WHB, Iron
/11/1931 - Modified Trans hook
/ 5/1932 - Modified AC Allce LT
/ /1971 - Scrapped R104
*L 1243.VA - 3/ 2/1925 NWS Built new WHB, Iron
18/ 1/1932 NWS Into Workshops -
6/ 2/1932 NWS Out of Workshops (20 days)
/ 2/1932 - Modified AC Allce LT
*L 1244.VA - 3/ 2/1925 NWS Built new WHB, Iron
19/ 3/1932 NWS Into Workshops -
/ 3/1932 - Modified AC Allce LT
5/ 4/1932 NWS Out of Workshops (18 days)
3/ 4/1936 NWS Into Workshops -
23/ 7/1936 NWS Out of Workshops (50 days)
15/ 1/1981 - Off Register [CRS]
16/ 2/1981 BOW Scrapped [CRS]
*L 1245.VA - 14/ 2/1925 NWS Built new WHB, Iron
26/ 4/1932 NWS Into Workshops -
14/ 5/1932 NWS Out of Workshops (19 days)
/ 5/1932 - Modified AC Allce LT
/ /1969 - Scrapped -
*L 1246.VA - 14/ 2/1925 NWS Built new WHB, Iron
19/ 3/1932 NWS Into Workshops -
11/ 4/1932 NWS Out of Workshops (24 days)
/ 4/1932 - Modified AC Allce LT
*L 1247.VA - 14/ 2/1925 NWS Built new WHB, Iron
9/ 1/1932 NWS Into Workshops -
17/ 2/1932 NWS Out of Workshops (40 days)
/ 2/1932 - Modified AC Allce LT
*L 1248.VA - 14/ 2/1925 NWS Built new WHB, Iron
23/ 2/1932 NWS Into Workshops -
9/ 3/1932 NWS Out of Workshops (16 days)
/ 3/1932 - Modified AC Allce LT
.
Vehicle.............SV # Date...... Loc History............SV Notes
*L 1249.VA - 14/ 2/1925 NWS Built new WHB, Iron
3/ 5/1932 NWS Into Workshops -
18/ 5/1932 NWS Out of Workshops (16 days)
/ 5/1932 - Modified AC Allce LT
*L 1250.VA - 14/ 2/1925 NWS Built new WHB, Iron
19/ 4/1932 NWS Into Workshops -
3/ 5/1932 NWS Out of Workshops (15 days)
/ 5/1932 - Modified AC Allce LT
10/ 3/1960 NWS Scrapped -
*L 1251.VA - 14/ 2/1925 NWS Built new WHB, Iron
30/ 3/1932 NWS Into Workshops -
15/ 4/1932 NWS Out of Workshops (17 days)
/ 4/1932 - Modified AC Allce LT
18/ 5/1982 - Off Register [CRS]
*L 1252.VA - 14/ 2/1925 NWS Built new WHB, Iron
10/ 5/1932 NWS Into Workshops -
/ 6/1932 - Modified AC Allce LT
15/ 6/1932 NWS To LB 1252.VA (37 days)
*L 1253.VA - 15/ 7/1938 NWS Built new WHB, AC
6/ 1/1982 - Off Register [CRS]
12/ 2/1982 BOW Sold (to) [CRS]: to Metal Recyclers
*L 1254.VA - 7/ 7/1938 NWS Built new WHB, AC
*L 1255.VA - 6/ 7/1938 NWS Built new WHB, AC
14/ 2/1955 - Scrapped -
*L 1256.VA - 6/ 7/1938 NWS Built new WHB, AC
*L 1257.VA - 8/ 7/1938 NWS Built new WHB, AC
*L 1258.VA - 7/ 7/1938 NWS Built new WHB, AC
*L 1259.VA - 8/ 7/1938 NWS Built new WHB, AC
24/ 9/1976 NET Photograph #673.13
*L 1260.VA - 18/ 7/1938 NWS Built new WHB, AC
*L 1261.VA - 12/ 7/1938 NWS Built new WHB, AC
*L 1262.VA - 18/ 7/1938 NWS Built new WHB, AC
*L 1263.VA - 13/ 7/1938 NWS Built new WHB, AC
9/10/1981 - Off Register [CRS]
4/12/1981 BOW Sold (to) [CRS]
*L 1264.VA - 13/ 7/1938 NWS Built new WHB, AC
*L 1265.VA - 13/ 7/1938 NWS Built new WHB, AC
22/ 8/1984 - Off Register [CRS]
16/10/1985 BOW Scrapped [CRS]
.
Vehicle.............SV # Date...... Loc History............SV Notes
*L 1266.VA - 13/ 7/1938 NWS Built new WHB, AC
*L 1267.VA - 13/ 7/1938 NWS Built new WHB, AC
23/ 8/1983 - Off Register [CRS]
*L 1268.VA - 13/ 7/1938 NWS Built new WHB, AC
21/10/1967 BDE Photograph #13.1: part view
/ /1975 - Scrapped RSN5/75
*L 1269.VA - 18/ 7/1938 NWS Built new WHB, AC
*L 1270.VA - 19/ 7/1938 NWS Built new WHB, AC
*L 1271.VA - 29/ 7/1938 NWS Built new WHB, AC
*L 1272.VA - 25/ 7/1938 NWS Built new WHB, AC
*L 1273.VA - 25/ 7/1938 NWS Built new WHB, AC
*L 1274.VA - 19/ 8/1938 NWS Built new WHB, AC
*L 1275.VA - 13/ 8/1938 NWS Built new WHB, AC
*L 1276.VA - 13/ 8/1938 NWS Built new WHB, AC
*L 1277.VA - 29/ 7/1938 NWS Built new WHB, AC
*L 1278.VA - 13/ 8/1938 NWS Built new WHB, AC
*L 1279.VA - 13/ 8/1938 NWS Built new WHB, AC
*L 1280.VA - 17/ 8/1938 NWS Built new AC, WHB
*L 1281.VA - 17/ 8/1938 NWS Built new AC, WHB
*L 1282.VA - 18/ 8/1938 NWS Built new AC, WHB
2/ 1/1985 - Off Register [CRS]
*L 1283.VA - 18/ 8/1938 NWS Built new AC, WHB
/ /1977 - Photograph #753
circa 1979 - Scrapped (v)
/ /1979 - Photograph #1367: Scrapping: Wood floor going to Sp St Pass Yd for floor heater storage
*L 1284.VA - 16/ 8/1938 NWS Built new AC, WHB
*L 1285.VA - 17/ 8/1938 NWS Built new AC, WHB
*L 1286.VA - 15/ 8/1938 NWS Built new AC, WHB
*L 1287.VA - 16/ 8/1938 NWS Built new AC, WHB
*L 1288.VA - 16/ 8/1938 NWS Built new AC, WHB
*L 1289.VA - 18/ 8/1938 NWS Built new AC, WHB
.
Vehicle.............SV # Date...... Loc History............SV Notes
*L 1290.VA - 15/ 8/1938 NWS Built new AC, WHB
15/ 1/1981 - Off Register [CRS]
27/ 2/1981 BOW Scrapped [CRS]
*L 1291.VA - 22/ 8/1938 NWS Built new AC, WHB
31/10/1980 BOW Sold (to) [CRS]: to Sims
16/12/1980 - Off Register [CRS]
*L 1292.VA - 15/ 8/1938 NWS Built new AC, WHB
*L 1293.VA - 15/ 8/1938 NWS Built new AC, WHB
17/ 4/1980 BOW Sold (to) [CRS]: SimsMetal
*L 1294.VA - 19/ 8/1938 NWS Built new AC, WHB
*L 1295.VA - 22/ 8/1938 NWS Built new AC, WHB
*L 1296.VA - 22/ 8/1938 NWS Built new AC, WHB
*L 1297.VA - 24/ 8/1938 NWS Built new AC, WHB
*L 1298.VA - 31/ 8/1938 NWS Built new AC, WHB
18/10/1983 - Off Register [CRS]
*L 1299.VA - 31/ 8/1938 NWS Built new AC, WHB
*L 1300.VA - 31/ 8/1938 NWS Built new AC, WHB
*L 1301.VA - 9/ 9/1938 NWS Built new AC, WHB
*L 1302.VA - 9/ 9/1938 NWS Built new AC, WHB
6/ 1/1982 - Off Register [CRS]
12/ 2/1982 BOW Sold (to) [CRS]: to Metal Recyclers
*L 1303.VA - 9/ 9/1938 NWS Built new AC, WHB
*L 1304.VA - 13/ 9/1938 NWS Built new WHB, AC
*L 1305.VA - 19/ 9/1938 NWS Built new WHB, AC
*L 1306.VA - 21/ 9/1938 NWS Built new WHB, AC
24/ 6/1980 NMW Off Register [CRS]
*L 1307.VA - 21/ 9/1938 NWS Built new WHB, AC
*L 1308.VA - 29/ 9/1938 NWS Built new WHB, AC
13/ 8/1980 - Off Register [CRS]
5/ 9/1980 NWS Scrapped [CRS]
*L 1309.VA - 3/10/1938 NWS Built new WHB, AC
*L 1310.VA - 3/10/1938 NWS Built new WHB, AC
6/ 6/1957 ING Destroyed 57/7147
*L 1311.VA - 3/10/1938 NWS Built new WHB, AC
.
Vehicle.............SV # Date...... Loc History............SV Notes
*L 1312.VA - 12/10/1938 NWS Built new WHB, AC
*L 1313.VA - 14/10/1938 NWS Built new WHB, AC
*L 1314.VA - 12/10/1938 NWS Built new WHB, AC
*L 1315.VA - 14/10/1938 NWS Built new WHB, AC
*L 1316.VA - 14/10/1938 NWS Built new WHB, AC
*L 1317.VA - 14/10/1938 NWS Built new WHB, AC
*L 1318.VA - 17/10/1938 NWS Built new WHB, AC
26/ 9/1980 - Off Register [CRS]
26/ 9/1980 BOW Sold (to) [CRS]: to Sims
*L 1319.VA - 17/10/1938 NWS Built new WHB, AC
*L 1320.VA - 26/10/1938 NWS Built new WHB, AC
9/11/1985 BLO Scrapped -
*L 1321.VA - 26/10/1938 NWS Built new WHB, AC
*L 1322.VA - 26/10/1938 NWS Built new WHB, AC
*L 1323.VA - 26/10/1938 NWS Built new WHB, AC
*L 1324.VA - 2/11/1938 NWS Built new WHB, AC
*L 1325.VA - 3/11/1938 NWS Built new WHB, AC
*L 1326.VA - 4/11/1938 NWS Built new WHB, AC
*L 1327.VA - 4/11/1938 NWS Built new WHB, AC
*L 1328.VA - 7/11/1938 NWS Built new WHB, AC
*L 1329.VA - 11/11/1938 NWS Built new WHB, AC
*L 1330.VA - 14/11/1938 NWS Built new WHB, AC
*L 1331.VA - 21/11/1938 NWS Built new WHB, AC
*L 1332.VA - 21/11/1938 NWS Built new WHB, AC
/ /1977 - Photograph #792, #902
*L 1333.VA - 23/ 7/1953 NWS Built new WHB, AC
*L 1334.VA - 23/ 7/1953 NWS Built new WHB, AC
6/ 1/1982 - Off Register [CRS]
*L 1335.VA - 23/ 7/1953 NWS Built new WHB, AC
*L 1336.VA - 10/ 9/1953 NWS Built new WHB, AC
.
Vehicle.............SV # Date...... Loc History............SV Notes
*L 1337.VA - 24/ 9/1953 NWS Built new WHB, AC
*L 1338.VA - 23/ 7/1953 NWS Built new WHB, AC
*L 1339.VA - 23/ 7/1953 NWS Built new WHB, AC
*L 1340.VA - 5/ 8/1953 NWS Built new WHB, AC
circa 1993 - Off Register -
14/ 3/1994 TRM Preserved R107: Stored
*L 1341.VA - 23/ 7/1953 NWS Built new AC, WHB
*L 1342.VA - 23/ 7/1953 NWS Built new AC, WHB
*L 1343.VA - 23/ 7/1953 NWS Built new -
*L 1344.VA - 5/ 8/1953 NWS Built new -
*L 1345.VA - 5/ 8/1953 NWS Built new -
*L 1346.VA - 31/ 7/1953 NWS Built new -
*L 1347.VA - 31/ 7/1953 NWS Built new -
*L 1348.VA - 23/ 7/1953 NWS Built new -
*L 1349.VA - 23/ 7/1953 NWS Built new -
*L 1350.VA - 31/ 7/1953 NWS Built new -
/ /1977 - Photograph #740
circa 1979 - Scrapped (v)
/ /1979 - Photograph #1367: Scrapping
*L 1351.VA - 31/ 7/1953 NWS Built new -
*L 1352.VA - 13/ 8/1953 NWS Built new -
*L 1353.VA - 31/ 7/1953 NWS Built new -
*L 1354.VA - 13/ 8/1953 NWS Built new -
15/ 5/1980 BOW Off Register [CRS]
*L 1355.VA - 5/ 8/1953 NWS Built new -
*L 1356.VA - 5/ 8/1953 NWS Built new -
*L 1357.VA - 5/ 8/1953 NWS Built new -
*L 1358.VA - 13/ 8/1953 NWS Built new -
*L 1359.VA - 26/ 8/1953 NWS Built new -
*L 1360.VA - 17/ 8/1953 NWS Built new -
circa 1978 - Off Register [v]
13/ 4/1978 RAA Sighting [RO]
.
Vehicle.............SV # Date...... Loc History............SV Notes
*L 1361.VA - 13/ 8/1953 NWS Built new -
*L 1362.VA - 17/ 8/1953 NWS Built new -
*L 1363.VA - 17/ 8/1953 NWS Built new -
*L 1364.VA - 13/ 8/1953 NWS Built new -
*L 1365.VA - 17/ 8/1953 NWS Built new -
*L 1366.VA - 2/ 9/1953 NWS Built new -
*L 1367.VA - 2/ 9/1953 NWS Built new -
13/ 8/1980 - Off Register [CRS]
5/ 9/1980 NWS Scrapped [CRS]
*L 1368.VA - 17/ 8/1953 NWS Built new -
*L 1369.VA - 26/ 8/1953 NWS Built new -
16/12/1980 NMW Off Register [CRS]
*L 1370.VA - 26/ 8/1953 NWS Built new -
/ /1979 - Photograph #1309, #1315
22/ 8/1984 - Off Register [CRS]
*L 1371.VA - 26/ 8/1953 NWS Built new -
*L 1372.VA - 26/ 8/1953 NWS Built new -
*L 1373.VA - 2/ 9/1953 NWS Built new -
*L 1374.VA - 2/10/1953 NWS Built new -
*L 1375.VA - 2/ 9/1953 NWS Built new -
*L 1376.VA - 2/ 9/1953 NWS Built new -
*L 1377.VA - 24/ 9/1953 NWS Built new -
*L 1378.VA - 24/ 9/1953 NWS Built new -
*L 1379.VA - 13/10/1953 NWS Built new -
*L 1380.VA - 2/10/1953 NWS Built new -
*L 1381.VA - 18/ 9/1953 NWS Built new -
*L 1382.VA - 18/ 9/1953 NWS Built new -
*L 1383.VA - 18/ 9/1953 NWS Built new -
*L 1384.VA - 13/10/1953 NWS Built new -
*L 1385.VA - 18/ 9/1953 NWS Built new -
.
Vehicle.............SV # Date...... Loc History............SV Notes
*L 1386.VA - 18/ 9/1953 NWS Built new -
*L 1387.VA - 10/ 9/1953 NWS Built new -
28/ 2/1980 SRD Scrapped [CRS]
*L 1388.VA - 10/ 9/1953 NWS Built new -
*L 1389.VA - 10/ 9/1953 NWS Built new -
*L 1390.VA - 10/ 9/1953 NWS Built new -
*L 1391.VA - 2/10/1953 NWS Built new -
*L 1392.VA - 24/ 9/1953 NWS Built new -
*L 1393.VA - 24/ 9/1953 NWS Built new -
*L 1394.VA - 2/10/1953 NWS Built new -
*L 1395.VA - 25/11/1953 NWS Built new -
*L 1396.VA - 2/10/1953 NWS Built new -
*L 1397.VA - 8/10/1953 NWS Built new -
*L 1398.VA - 13/10/1953 NWS Built new -
*L 1399.VA - 25/11/1953 NWS Built new -
*L 1400.VA - 21/10/1953 NWS Built new -
*L 1401.VA - 3/11/1953 NWS Built new -
13/ 4/1978 RAA Sighting [RO] "Off Reg"
18/ 5/1982 - Off Register [CRS]
*L 1402.VA - 3/11/1953 NWS Built new -
15/ 5/1980 BOW Off Register [CRS]
*L 1403.VA - 3/11/1953 NWS Built new -
*L 1404.VA - 8/10/1953 NWS Built new -
*L 1405.VA - 25/11/1953 NWS Built new -
6/ 1/1982 - Off Register [CRS]
*L 1406.VA - 8/10/1953 NWS Built new -
6/ 1/1982 - Off Register [CRS]
*L 1407.VA - 8/10/1953 NWS Built new -
*L 1408.VA - 8/10/1953 NWS Built new -
*L 1409.VA - 21/10/1953 NWS Built new -
*L 1410.VA - 21/10/1953 NWS Built new -
.
Vehicle.............SV # Date...... Loc History............SV Notes
*L 1411.VA - 29/10/1953 NWS Built new -
*L 1412.VA - 21/10/1953 NWS Built new -
*L 1413.VA - 21/10/1953 NWS Built new -
*L 1414.VA - 10/11/1953 NWS Built new -
15/ 4/1979 ECH Photograph #1247.20
*L 1415.VA - 13/10/1953 NWS Built new -
circa 1978 - Off Register [v]
13/ 4/1978 RAA Sighting [RO]
*L 1416.VA - 13/10/1953 NWS Built new -
20/11/1984 - Off Register [CRS]
*L 1417.VA - 17/11/1953 NWS Built new -
30/ 1/1981 NWS Scrapped [CRS]
10/ 2/1981 - Off Register [CRS]
*L 1418.VA - 17/11/1953 NWS Built new -
16/ 9/1980 WAN Off Register [CRS]
*L 1419.VA - 25/11/1953 NWS Built new -
28/ 2/1980 SRD Scrapped [CRS]
*L 1420.VA - 10/11/1953 NWS Built new -
*L 1421.VA - 3/11/1953 NWS Built new -
*L 1422.VA - 10/11/1953 NWS Built new -
*L 1423.VA - 25/11/1953 NWS Built new -
*L 1424.VA - 17/11/1953 NWS Built new -
*L 1425.VA - 17/11/1953 NWS Built new -
*L 1426.VA - 29/10/1953 NWS Built new -
*L 1427.VA - 3/11/1953 NWS Built new -
*L 1428.VA - 29/10/1953 NWS Built new -
*L 1429.VA - 29/10/1953 NWS Built new -
*L 1430.VA - 29/10/1953 NWS Built new -
19/ 7/1980 BOW Sold (to) [CRS]: to Sims
13/ 8/1980 - Off Register [CRS]
*L 1431.VA - 10/11/1953 NWS Built new -
*L 1432.VA - 10/11/1953 NWS Built new -
*L #..503.VA - 10/ 6/1996 WNG Body [DMG]: Gable roof of vehicle covering a feed hopper, Johnson Rd/Boorhaman Rd
.
Code SV Date Sys Description Type
IK VA 1902 - VR F/Whl Flat Wagon Freight
KCC VA 1964 - VR F/Whl Flat Wagon/Cement Cont. Freight
KF VA 1959 - VR F/Whl Car Body Transport Freight
KW VA 1962 - VR F/Whl Car Body Transport Freight
L VA 1863 - VR F/Whl Sheep Van Freight
LB VA 1932 - VR F/Whl Sheep Van - "Block cpld" Freight
LL VA 1886 - VR F/Whl Sheep & Merchandise Wgn Freight
Code Location / Builder
- -
BAW Ballarat North Workshops
BDE Bairnsdale, Victoria
BLD Ballarat Loco Depot
BLO Bendigo Loco Depot
BOW Bendigo Workshops
ECH Echuca, Vic
GLN Glenrowan, Victoria
HKN Harkness & Co., Sandhurst
ING Ingliston, Vic
JHF Horsington, J., Footscray
L&D Longwarry & Drouin
NDO Newpt, Docker & Party
NDP Newpt, Donovan & Party
NET Newmarket Stock Sidings
NJU Newpt, Jullien & Party
NMW North Melbourne Workshops
NSM Newpt, Smith & Party
NWS Newport Workshops
RAA Rangelea
RID Riddell, Vic
SBY Sunbury, Vic
SEL Seymour Loco
SER Seymour
SRD Spotswood Reclamation Depot
TOT Tottenham Yard
TOZ Tozer, Melbourne
TRM Trentham, Victoria
W&E Wright & Edwards
W&H Walker & Hickman, Ballarat
WAN Wallan
WHE White & Co, G., Moreland
WMS Williams, Melb.
WNG Wangaratta, Vic
WOD Wodonga
WWS Williamstown Workshops
References...
[CRS] : Condemned Rolling Stock Book
[DMG] : Daryl M. Gregory
[NIO] : Newport In/Out books
[RO] : Rob O'Regan
[v] : History generated by PJV/Not official record
<2s> End of output.